Difference between revisions of "Farmway station"

From SgWiki
Jump to navigation Jump to search
m
m (Supernutorcrazy moved page Farmway Station to Farmway station without leaving a redirect)
(No difference)

Revision as of 09:52, 13 May 2018


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

1

Farmway
农道
ஃபாம்வே
Farmway-SKLRT.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 35 Anchorvale Street
Singapore 545048
Line(s) Sengkang LRT
Connections File:Bus Logo.png

Farmway (SW2) is an elevated Light Rail Transit (LRT) station on the Sengkang LRT.

History

Date Event
15 November 2007 Station officially opens

Layout

L3 Platform 2 Sengkang LRT
Service C: Template:Terminus
Platform 1/2
Platform 1 Sengkang LRT
Service D: Template:Terminus
L2 Concourse Faregates, Ticketing Machines
L1 Street Level Sengkang Sports Complex

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Anchorvale Street
B Handicapped/disabled access Anchorvale Street, Sengkang Sports Complex

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
67319 Blk 336B
67311 Blk 330

References


icon Sengkang LRT [ VTE ]
Stations Sengkang
East LoopCompassvaleRumbiaBakauKangkarRanggung
West LoopCheng LimFarmwayKupangThanggamFernvaleLayarTongkangRenjong
Rolling Stock 810810A810D
Depots Sengkang
Others Bridging Service