Difference between revisions of "Punggol LRT"

From SgWiki
Jump to navigation Jump to search
Line 2: Line 2:
|Line=PGLRT
|Line=PGLRT
|Name=Punggol LRT<br>榜鹅轻轨<br>பொங்கோல் லைட் ரெயில்
|Name=Punggol LRT<br>榜鹅轻轨<br>பொங்கோல் லைட் ரெயில்
|Img=[[File:PGLRT Map.png|centre|300px]]
|Info=
|Info=
  {{Infoline|Status|Operational}}
  {{Infoline|Status|Operational}}
Line 28: Line 27:
|rowspan=2|20 June 2011||{{Stn|Oasis}} - {{Stn|Damai}}
|rowspan=2|20 June 2011||{{Stn|Oasis}} - {{Stn|Damai}}
|-
|-
|East Loop operated in both direction throughout the day
|East Loop operated in both directions throughout the day
|-
|-
|29 June 2014||{{Stn|Punggol}} - {{Stn|Soo Teck}} - {{Stn|Nibong}} (West Loop operated in Uni-Direction)
|29 June 2014||{{Stn|Punggol}} - {{Stn|Soo Teck}} - {{Stn|Nibong}} (West Loop operated in Uni-Direction)
Line 39: Line 38:
|-
|-
|31 March 2017||{{Stn|Samudera}} (Station added on operational line)
|31 March 2017||{{Stn|Samudera}} (Station added on operational line)
|-
|29 September 2018||West Loop operated in both directions throughout the day
|}
|}



Revision as of 16:41, 8 October 2018


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit Tower Transit
  • Due to upgrading works at Boon Lay Interchange, from Sunday, 26 May 2024,
    • Bus service
      79
      will be amended to start from Jurong Town Hall Int and loop at Boon Lay Int via Jurong West St 64.
    • Bus service
      252
      will be amended to enter Boon Lay Int via Jurong West St 64.
  • Please refer to the following for more information.

SBS Transit
  • From Monday, 27 May 2024, City Direct services
    671
    &
    672
    will operate additional morning & evening trips. Please refer here for more information.

SBS Transit
  • From Monday, 27 May 2024, The first bus timing for service
    27
    from the following bus stops will be brought forward on Weekdays to the following timings:
    • The first bus timing from Hougang Central Interchange will be brought forward to 0510hrs on Weekdays.
    • The first bus timing from Sengkang East Ave (B/S 67261 (Blk 203B)) will be brought forwards to 0500hrs on Weekdays.
  • Please refer here for more information.

Go-Ahead
  • From Monday, 27 May 2024, Express service
    43e
    will call at additional bus stops along Buangkok Drive and Airport Road to better serve commuters’ travel needs. The first bus during both morning and evening peak periods will be brought forward by 10 minutes, and frequency will be improved from 20 – 30 minutes to 15 – 20 minutes. Please refer here for more information

SBS Transit
  • From Monday, 27 May 2024, short trip services
    20A
    ,
    39A
    &
    39B
    will be introduced.
    • Short Trip
      20A
      will start from Simei St 1 (B/S 96139 (Blk 148)) and will terminate at Changi Sth Ave 1 (B/S 96301 (Expo Stn Exit B)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
    • Short Trip
      39A
      will start from Pasir Ris Ctrl (B/S 77031 (Opp Pasir Ris Stn Exit B)) and will terminate at Jln Kayu (B/S 68119 (Aft Seletar Camp G)). It only operates on Weekdays (except Public Holidays) during morning & evening peak hours.
    • Short Trip
      39B
      will start from Punggol Way (B/S 65439 (Blk 220C)) and will terminate at Pasir Ris Ctrl (B/S 77039 (Pasir Ris Stn Exit B)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
  • Please refer here for more information.

Punggol LRT
榜鹅轻轨
பொங்கோல் லைட் ரெயில்
Statistics
Status Operational
Termini Punggol
Stations 15 (1 Not in operation)
Services 4
Operator(s) SBS Transit
Rolling stock C810, C810A
Line length 10.3 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Punggol LRT (PGLRT) is the third Light Rail Transit (LRT) line. Traveling one loop takes about 15 minutes. The line is currently 10.3 km long with 15 stations including 1 not in operational and is fully automatically operated.

History

Date Event
29 January 2005 Punggol - Cove - Kadaloor (East Loop operated in Uni-Direction)
15 June 2007 Kadaloor - Oasis
20 June 2011 Oasis - Damai
East Loop operated in both directions throughout the day
29 June 2014 Punggol - Soo Teck - Nibong (West Loop operated in Uni-Direction)
29 February 2016 Nibong - Sam Kee
29 December 2016 Punggol Point (Station added on operational line)
Two-car trains started operation
31 March 2017 Samudera (Station added on operational line)
29 September 2018 West Loop operated in both directions throughout the day

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
colspan=5 style="background-color:Template:Colour/PGLRT;color:#FFF;"|File:LRTFFF.png Punggol LRT
2
Punggol Punggol-PGLRT.png Punggol Terminus
Interchange with North East Line
colspan=5 style="background-color:Template:Colour/PGLRT;color:#FFF;"|File:LRTFFF.png Punggol LRT (East Loop)
1
Cove Cove-PGLRT.png Cove
1
Meridian Meridian-PGLRT.png Meridian
1
Coral Edge Coral Edge-PGLRT.png Coral Edge
1
Riviera Riviera-PGLRT.png Riviera
1
Kadaloor Kadaloor-PGLRT.png Kadaloor
1
Oasis Oasis-PGLRT.png Oasis
1
Damai Damai-PGLRT.png Damai
colspan=5 style="background-color:Template:Colour/PGLRT;color:#FFF;"|File:LRTFFF.png Punggol LRT (WestLoop)
1
Sam Kee Sam Kee-PGLRT.png Sam Kee
1
Teck Lee Teck Lee Not in operation
1
Punggol Point Punggol Point-PGLRT.png Punggol Point
1
Samudera Samudera-PGLRT.png Samudera
1
Nibong Nibong-PGLRT.png Nibong
1
Sumang Sumang-PGLRT.png Sumang
1
Soo Teck Soo Teck-PGLRT.png Soo Teck

Services

Service Route Notes
A PunggolCoveDamaiPunggol
B PunggolDamaiCovePunggol
C PunggolSam KeeSoo TeckPunggol
D PunggolSoo TeckSam KeePunggol

Rolling stock

The rolling stock consists of Mitsubishi Heavy Industries C810 and Mitsubishi Heavy Industries C810A trains. These trains operate from Sengkang Depot near Tongkang Station.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A810810A
Future801B810D
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Punggol LRT [ VTE ]
Stations Punggol
East LoopCoveMeridianCoral EdgeRivieraKadaloorOasisDamai
West LoopSam KeeTeck LeePunggol PointSamuderaNibongSumangSoo Teck
Rolling Stock 810810A810D
Depots Sengkang
Others Punggol LRT Bridging Service