Difference between revisions of "Mandai Depot"

From SgWiki
Jump to navigation Jump to search
m
m
Line 27: Line 27:
|}
|}


The''' Mandai Depot''' is a full maintenance [[Mass Rapid Transit|MRT]] depot for the upcoming [[Thomson East Coast Line]].
The''' Mandai Depot''' is a full maintenance [[Mass Rapid Transit|MRT]] depot for the upcoming {{TEL}}.


Located at a 32-hectare site <sup>[http://www.onemap.sg/?SearchVal=WOODLANDS%20AVENUE%2012&LW:Y&wO5d:JIabq_R,hhJhh_R,Jhhha_J,hhcaR_J,c (1)]</sup> bounded by Mandai Road, Seletar Expressway and Lor Lada Hitam, it is within the Mandai Agrotechnology Park.<sup>[http://orchidville.com/about_us.php (2)]</sup> and has the capacity to stable up to 90 trains.<sup>[http://www.lta.gov.sg/images/TSL%20Annex-A%2016-06-2011.pdf (3)]</sup>
Located at a 32-hectare site <sup>[http://www.onemap.sg/?SearchVal=WOODLANDS%20AVENUE%2012&LW:Y&wO5d:JIabq_R,hhJhh_R,Jhhha_J,hhcaR_J,c (1)]</sup> bounded by Mandai Road, Seletar Expressway and Lor Lada Hitam, it is within the Mandai Agrotechnology Park.<sup>[http://orchidville.com/about_us.php (2)]</sup> and has the capacity to stable up to 90 trains.<sup>[http://www.lta.gov.sg/images/TSL%20Annex-A%2016-06-2011.pdf (3)]</sup>
Line 33: Line 33:
First announced by LTA on 16 June 2011, construction of the depot would commence at the end of 2012 and is expected to be an underground depot - the third in Singapore. Construction is expected to be completed in the year 2019. As a result of the construction, the farm 'Orchidville' that previously occupied the site was acquired.<sup>[http://app.lta.gov.sg/corp_press_content.asp?start=2g8u06wb5lpg487lobzx9o7n1sfszjo7137e2b82kqgbb1lbm6 (4)]</sup> Prior to the acquiration, Orchidville was the largest orchid farm in Singapore.
First announced by LTA on 16 June 2011, construction of the depot would commence at the end of 2012 and is expected to be an underground depot - the third in Singapore. Construction is expected to be completed in the year 2019. As a result of the construction, the farm 'Orchidville' that previously occupied the site was acquired.<sup>[http://app.lta.gov.sg/corp_press_content.asp?start=2g8u06wb5lpg487lobzx9o7n1sfszjo7137e2b82kqgbb1lbm6 (4)]</sup> Prior to the acquiration, Orchidville was the largest orchid farm in Singapore.


It will serve the upcoming [[Thomson East Coast Line]] as the Operation Control Centre and provide stabling and maintenance facilities for the line's rolling stock.
It will serve the upcoming [[Thomson–East Coast Line]] as the Operation Control Centre and provide stabling and maintenance facilities for the line's rolling stock.


==References==
==References==

Revision as of 10:24, 26 January 2019

Mandai Depot
万礼车厂
Address
Coordinates
Owner Land Transport Authority
Operator SMRT Trains
Line(s) Thomson–East Coast Line
Rolling Stock(s) CT251
Capacity 90 trains
Area 320,000m²

The Mandai Depot is a full maintenance MRT depot for the upcoming Thomson–East Coast Line.

Located at a 32-hectare site (1) bounded by Mandai Road, Seletar Expressway and Lor Lada Hitam, it is within the Mandai Agrotechnology Park.(2) and has the capacity to stable up to 90 trains.(3)

First announced by LTA on 16 June 2011, construction of the depot would commence at the end of 2012 and is expected to be an underground depot - the third in Singapore. Construction is expected to be completed in the year 2019. As a result of the construction, the farm 'Orchidville' that previously occupied the site was acquired.(4) Prior to the acquiration, Orchidville was the largest orchid farm in Singapore.

It will serve the upcoming Thomson–East Coast Line as the Operation Control Centre and provide stabling and maintenance facilities for the line's rolling stock.

References

  1. http://www.onemap.sg/?SearchVal=WOODLANDS%20AVENUE%2012&LW:Y&wO5d:JIabq_R,hhJhh_R,Jhhha_J,hhcaR_J,c
  2. http://orchidville.com/about_us.php
  3. http://www.lta.gov.sg/images/TSL%20Annex-A%2016-06-2011.pdf
  4. http://app.lta.gov.sg/corp_press_content.asp?start=2g8u06wb5lpg487lobzx9o7n1sfszjo7137e2b82kqgbb1lbm6

Related Links

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah