Difference between revisions of "Punggol LRT"

From SgWiki
Jump to navigation Jump to search
Line 49: Line 49:
|-
|-
!colspan=5 class="PGLRT"|[[File:LRTFFF.png|18px|link=|alt=]] Punggol LRT
!colspan=5 class="PGLRT"|[[File:LRTFFF.png|18px|link=|alt=]] Punggol LRT
{{Stnline|{{Code|2|PGLRT|PTC|NEL|NE17}}|Punggol|PGLRT|Punggol|Terminus<br>Interchange with {{NEL}}}}
{{Stnline|{{Code|3|PGLRT|PTC|NEL|NE17|CRL|CP4|S3=future}}|Punggol|PGLRT|Punggol|Terminus<br>Interchange with {{NEL}}<br>Future interchange with {{CRL}}}}
|-
|-
!colspan=5 class="PGLRT"|[[File:LRTFFF.png|18px|link=|alt=]] Punggol LRT (East Loop)
!colspan=5 class="PGLRT"|[[File:LRTFFF.png|18px|link=|alt=]] Punggol LRT (East Loop)
Line 55: Line 55:
{{Stnline|{{Code|1|PGLRT|PE2}}|Meridian|PGLRT}}
{{Stnline|{{Code|1|PGLRT|PE2}}|Meridian|PGLRT}}
{{Stnline|{{Code|1|PGLRT|PE3}}|Coral Edge|PGLRT}}
{{Stnline|{{Code|1|PGLRT|PE3}}|Coral Edge|PGLRT}}
{{Stnline|{{Code|1|PGLRT|PE4}}|Riviera|PGLRT}}
{{Stnline|{{Code|2|PGLRT|PE4|CRL|CP3|S2=future}}|Riviera|PGLRT|Riviera|Future interchange with {{CRL}}}}
{{Stnline|{{Code|1|PGLRT|PE5}}|Kadaloor|PGLRT}}
{{Stnline|{{Code|1|PGLRT|PE5}}|Kadaloor|PGLRT}}
{{Stnline|{{Code|1|PGLRT|PE6}}|Oasis|PGLRT}}
{{Stnline|{{Code|1|PGLRT|PE6}}|Oasis|PGLRT}}

Revision as of 17:05, 10 March 2020


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

1

Punggol LRT
榜鹅轻轨
பொங்கோல் லைட் ரெயில்
Statistics
Status Operational
Termini Punggol
Stations 15 (1 Not in operation)
Services 4
Operator(s) SBS Transit
Rolling stock C810, C810A
Line length 10.3 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Punggol LRT (PGLRT) is the third Light Rail Transit (LRT) line. Traveling one loop takes about 15 minutes. The line is currently 10.3 km long with 15 stations including 1 not in operational and is fully automatically operated.

History

Date Event
29 January 2005 Punggol - Cove - Kadaloor (East Loop operated in Uni-Direction)
15 June 2007 Kadaloor - Oasis
20 June 2011 Oasis - Damai
East Loop operated in both directions throughout the day
29 June 2014 Punggol - Soo Teck - Nibong (West Loop operated in Uni-Direction)
29 February 2016 Nibong - Sam Kee
29 December 2016 Punggol Point (Station added on operational line)
Two-car trains started operation
31 March 2017 Samudera (Station added on operational line)
29 September 2018 West Loop operated in both directions throughout the day

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:LRTFFF.png Punggol LRT
3
Punggol Punggol-PGLRT.png Punggol Terminus
Interchange with North East Line
Future interchange with Cross Island Line
File:LRTFFF.png Punggol LRT (East Loop)
1
Cove Cove-PGLRT.png Cove
1
Meridian Meridian-PGLRT.png Meridian
1
Coral Edge Coral Edge-PGLRT.png Coral Edge
2
Riviera Riviera-PGLRT.png Riviera Future interchange with Cross Island Line
1
Kadaloor Kadaloor-PGLRT.png Kadaloor
1
Oasis Oasis-PGLRT.png Oasis
1
Damai Damai-PGLRT.png Damai
File:LRTFFF.png Punggol LRT (West Loop)
1
Sam Kee Sam Kee-PGLRT.png Sam Kee
1
Teck Lee Teck Lee Not in operation
1
Punggol Point Punggol Point-PGLRT.png Punggol Point
1
Samudera Samudera-PGLRT.png Samudera
1
Nibong Nibong-PGLRT.png Nibong
1
Sumang Sumang-PGLRT.png Sumang
1
Soo Teck Soo Teck-PGLRT.png Soo Teck

Services

Service Route Notes
A PunggolCoveDamaiPunggol
B PunggolDamaiCovePunggol
C PunggolSam KeeSoo TeckPunggol
D PunggolSoo TeckSam KeePunggol

Rolling stock

The rolling stock consists of Mitsubishi Heavy Industries C810 and Mitsubishi Heavy Industries C810A trains. These trains operate from Sengkang Depot near Tongkang Station.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Punggol LRT [ VTE ]
Stations Punggol
East LoopCoveMeridianCoral EdgeRivieraKadaloorOasisDamai
West LoopSam KeeTeck LeePunggol PointSamuderaNibongSumangSoo Teck
Rolling Stock 810810A810D
Depots Sengkang
Others Bridging Service