Changi Airport Skytrain

From SgWiki
Revision as of 15:35, 17 November 2011 by Timothy Mok (talk | contribs) (Created page with "{{Infobox rail line | box_width = auto | name = Changi Airport Skytrain | image = CrystalMover-Changi-Ext.JPG | image_width = 300px | caption = Mitsubishi...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Template:Infobox rail line

The Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 at Singapore Changi Airport. Opened in 1990, it was the first auto-guided system in Asia.[1] The Changi Airport Skytrain operates from 0500 to 0230 daily and operates at 1 to 2 minute intervals.[2] Travel on the Skytrain is free and an inter-terminal journey takes about 90 seconds. All stations have platform screen doors, are air conditioned and have plasma displays indicating the arrival time of the next train.

With the opening of the Changi Airport MRT Station on 8 February 2002, the Skytrain is able to connect passengers at Terminal 1 to the MRT station entrances located at Terminals 2 and 3.[3]

Initially, the Skytrain rolling stock consisted of Bombardier Innovia APM 100s, jointly built by Westinghouse and Adtranz (acquired by Bombardier). In 2002, work began on a new S$135 million Mitsubishi Crystal Mover-based system to accommodate the planned opening of Terminal 3 and the projected increase in demand as the airport expands.[4]

The previous rolling stock of Bombardier Innovia APM 100 ran without a second carriage per train (as opposed to the current Mitsubishi Crystal Movers, which runs with two carriages per train), and the first two platform screen doors of each station were for emergency purposes (The Innovia APM 100s stopped at the outer half of each station, with two doors on each half.).

File:Skytrain-cx100.jpg
Changi Airport Skytrain was previously operated with Bombardier Innovia APM 100s in the 90s.

The third rail, formerly at the centre of the track, was moved to the side. The new system opened in March 2006 between Terminals 1 and 2 and opened the connection with Terminal 3 in November 2007 during Terminal 3's open house.

Stations

Station Terminal Destination Station Service
A Terminal 3 A South Transit
F Transit
A South Terminal 3 A Transit
B Terminal 3 C Public/Transit
E Public/Transit
C Terminal 1 B Public/Transit
D Terminal 1 E Public/Transit
E Terminal 2 B Public/Transit
D Public/Transit
F Terminal 2 A Transit

Future Expansion

Plans are in place for future expansions of the system. These would include a 2-station single lane shuttle of about 500 m in length serving the southside of Terminal 2 from Station F, and a 4-station dual lane shuttle of about 1400 m to serve a future Terminal 4.[5]

References

Template:Reflist

Template:Commons Template:Singapore railway lines Template:Use dmy dates

no:Changi Airport SkyTrain sv:Changi Airport Skytrain zh:樟宜机场高架旅客运送车