2025

From SgWiki
Jump to navigation Jump to search
← 2024 2026 →

Public Transport

Date Service Affected Event
2 January 675 Introduced between Yio Chu Kang Rd and Temasek Blvd.
676 Introduced between Upp Serangoon Rd and Temasek Blvd.
677 Introduced between Punggol Rd and Temasek Blvd.
678 Introduced between Punggol Ctrl and Temasek Blvd.
12 January 967 Introduced between Woodlands Int and Woodlands Dr 17 (Loop).
13 January 912M Withdrawn.
26 January 230 Extended to serve Caldecott and Lor 8 Toa Payoh.
24 February 871A Introduced between Tengah Int and Bukit Batok East Ave 2.
28 February Hume Begins operations.
14 March 138B Withdrawn.
15 March 138M Introduced between Ang Mo Kio Int and Ang Mo Kio Polyclinic (Loop).
17 March 71A Introduced between Ang Mo Kio Ave 4, looping at Bishan St 11, and terminating at Bishan Rd.
23 March 258M Introduced between Joo Koon Int and Boon Lay Pl (Loop).
24 March 92B Introduced between Sth Bouna Vista Rd and Science Pk Dr (Loop).
112B Introduced between Hougang Ctrl Int and Hougang Ave 7.
861B Introduced between Yishun Ave 1 and Canberra Lk.
861M Introduced between Canberra Way and Sembawang Int.
979X Introduced between Bt Panjang Int and Choa Chu Kang Cres (Loop).
11 April 84A Withdrawn.
13 April 135 Amended to ply Haig Rd and Dunman Rd.
248 248M Amended to serve Tuas South Ave 10 and Tuas South Ave 7 with the reopening of the traffic junction of Tuas South Ave 12 and Tuas South Ave 7, skipping Tuas South Ave 5 and Tuas South Ave 12.
20 April 146 Amended to Woodleigh Int with its opening.
148 Introduced between the new Woodleigh Int and Potong Pasir Ave 1 (Loop).
27 April 299 Introduced between Tampines North Int and Tampines St 96 (Loop).
28 April 21X Introduced between St Michael's Ter and Thomson Rd (Loop).
177 Amended to ply the reinstated Hillview Lk.
11 May 292 Amended to ply Tampines Ln, serving Tampines St 11 in both directions.
8 June 172 Amended to serve the realigned Jln Bahar.
230M Introduced between Toa Payoh Int and Kim Keat Ave (Loop).
975 975B 975C Amended to serve the realigned Lim Chu Kang Rd.
29 June Punggol Coast Interchange To begin operations.
34 117 117M To be extended to Punggol Coast Int.
10 August 872 To be introduced between Tengah Int and Jurong East St 32 (Loop).
18 October 405 To be amended to serve the realigned Jln Bahar, no longer plying Lim Chu Kang Rd.

Politics

References