Difference between revisions of "Canberra station"

From SgWiki
Jump to navigation Jump to search
m
Line 3: Line 3:
|Name=Canberra<br>坎贝拉<br>கான்பரா
|Name=Canberra<br>坎贝拉<br>கான்பரா
|Info=
|Info=
  {{Infoline|Line(s)|{{NSL}} <small>''(Future)}}
  {{Infoline|Line(s)|{{NSL}}}}
}}
}}


'''Canberra (NS12)''' is a future elevated [[Mass Rapid Transit]] (MRT) station on the {{NSL}}.<ref>[//www.straitstimes.com/news/singapore/transport/story/new-mrt-station-north-south-line-canberra-20140627 "New MRT station for North-South Line: Canberra"]. The Straits Times (27 June 2014). Retrieved 1 August 2014.</ref>
'''Canberra (NS12)''' is an elevated [[Mass Rapid Transit]] (MRT) station on the {{NSL}}.<ref>[//www.straitstimes.com/news/singapore/transport/story/new-mrt-station-north-south-line-canberra-20140627 "New MRT station for North-South Line: Canberra"]. The Straits Times (27 June 2014). Retrieved 1 August 2014.</ref>


It will be the second MRT station in Singapore after {{Stn|Dover}} to be built on an existing rail line and elevated with side platforms.<ref>[//app.lta.gov.sg/apps/news/page.aspx?c=2&id=beab07d4-f096-4d34-bc70-9d529ae12634 "New Addition to North-South Line: Canberra Station"]. Land Transport Authority. Retrieved 1 August 2014.</ref><b style="color:#F00;">
It is the second MRT station in Singapore after {{Stn|Dover}} to be built on an existing rail line and elevated with side platforms.<ref>[//app.lta.gov.sg/apps/news/page.aspx?c=2&id=beab07d4-f096-4d34-bc70-9d529ae12634 "New Addition to North-South Line: Canberra Station"]. Land Transport Authority. Retrieved 1 August 2014.</ref><b style="color:#F00;">


Canberra MRT Station will officially open on 2 November 2019.</b>
Canberra MRT Station will officially open on 2 November 2019.</b>
Line 21: Line 21:
==Layout==
==Layout==
{| class="layout"
{| class="layout"
!rowspan=6 {{TBC}}
!rowspan=5|L2
|-
|-
|colspan=2 class="platform bottom"|Platform A
|colspan=2 class="platform bottom"|Platform A
Line 33: Line 33:
|colspan=2 class="platform top"|Platform B
|colspan=2 class="platform top"|Platform B
|-
|-
!L1
|Concourse
|Concourse
|
|

Revision as of 02:05, 2 November 2019


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Sunday, 19 May 2024, The first bus timing for service
    168
    from Woodlands Interchange will be brought forward on Sundays & Public Holidays to 0545hrs. Please refer here for more information.

SBS Transit Tower Transit
  • Due to upgrading works at Boon Lay Interchange, from Sunday, 26 May 2024,
    • Bus service
      79
      will be amended to start from Jurong Town Hall Int and loop at Boon Lay Int via Jurong West St 64.
    • Bus service
      252
      will be amended to enter Boon Lay Int via Jurong West St 64.
  • Please refer to the following for more information.

SBS Transit
  • From Monday, 27 May 2024, City Direct services
    671
    &
    672
    will operate additional morning & evening trips. Please refer here for more information.

SBS Transit
  • From Monday, 27 May 2024, The first bus timing for service
    27
    from the following bus stops will be brought forward on Weekdays to the following timings:
    • The first bus timing from Hougang Central Interchange will be brought forward to 0510hrs on Weekdays.
    • The first bus timing from Sengkang East Ave (B/S 67261 (Blk 203B)) will be brought forwards to 0500hrs on Weekdays.
  • Please refer here for more information.

Go-Ahead
  • From Monday, 27 May 2024, Express service
    43e
    will call at additional bus stops along Buangkok Drive and Airport Road to better serve commuters’ travel needs. The first bus during both morning and evening peak periods will be brought forward by 10 minutes, and frequency will be improved from 20 – 30 minutes to 15 – 20 minutes. Please refer here for more information

1

Canberra
坎贝拉
கான்பரா
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Line(s) North–South Line

Canberra (NS12) is an elevated Mass Rapid Transit (MRT) station on the North–South Line.[1]

It is the second MRT station in Singapore after Dover to be built on an existing rail line and elevated with side platforms.[2]

Canberra MRT Station will officially open on 2 November 2019.

History

Date Event
2 November 2019 Station officially opens

Layout

L2
Platform A
Platform A Template:RailRoute/2
Platform B Template:RailRoute/1
Platform B
L1 Concourse

References

  1. "New MRT station for North-South Line: Canberra". The Straits Times (27 June 2014). Retrieved 1 August 2014.
  2. "New Addition to North-South Line: Canberra Station". Land Transport Authority. Retrieved 1 August 2014.

Template:North South Line