Difference between revisions of "Cross Island Line"

From SgWiki
Jump to navigation Jump to search
(It must be TBA.)
(CRL Stage 1 construction has already started according to updates posted on CRL blog.)
 
(37 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Infobox Line
{{Infobox/Line
| Name E= Cross Island Line
|TA=RCR
| Name C= 跨岛线
|Line=CRL
| Name T=  
|Code={{Code/S|CR|style={{CSS/CRL|s=}};font-size:18px;|h=27px|r=18px 27px}}<br>
| Image=  
|Name=Cross Island Line<br>跨岛线<br>குறுக்கு தீவு வரி
| Image Description=  
|Info=
| Type= Rapid transit
{{Infoline|Status|Under Construction (Stage 1)<br>Under Planning (Stage 2 & Punggol Extension)}}
| System= Mass Rapid Transit
{{Infoline|Termini|{{Stn|Aviation Park}}<br>{{Stn|Jurong Lake District}}<br>{{Stn|Punggol}}}}
| Status= Under planning
{{Infoline|Stations|12 (Stage 1)<br>6 (Stage 2)<br>3 (Punggol Extension)}}
| Termini= {{TBC|TBA}}
{{Infoline|Line length|29 km (Stage 1)<br>15 km (Stage 2)<br>7.3 km (Punggol Extension)}}
| Stations= {{TBC|TBA}}
| Services= {{TBC|TBA}}
| Date O= 2030
| Date C=
| Owner= Land Transport Authority
| Operator= {{TBC|TBA}}
| Rolling stock= {{TBC|TBA}}
| Length= 52 km
| Track gauge= {{TBC|TBA}}
| Electrification= {{TBC|TBA}}
}}
}}


The '''Cross Island Line (CRL)''' will be the eighth Mass Rapid Transit (MRT) line in Singapore. The line will be 50 km long and is expected to begin service in 2030.<ref name="JRL1">[http://app.mot.gov.sg/News_Centre/Latest_News/NewsID/6559AFFF0C92B236/Speech_by_Mr_Lui_Tuck_Yew_Minister_for_Transport_at_visit_to_DTL1_Chinatown_Station_17_January_2013.aspx "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 Jan 2013]</ref>
'''Cross Island Line (CRL)''' will be the eighth [[Mass Rapid Transit]] line in Singapore. The line will be 50 km long when fully constructed and is expected to begin service in 2030.<ref>[//www.lta.gov.sg/content/ltagov/en/upcoming_projects/rail_expansion/cross_island_line.html "Cross Island Line"]. Land Transport Authority. Retrieved 24 June 2020.</ref>


As the name implies, the line connects Changi to Loyang, Pasir Ris, Hougang, Ang Mo Kio, Bukit Timah, Clementi, West Coast and Jurong.<ref name="JRL1"/>
==Stations==
 
<div style="overflow-y:auto;width=100%">
==History==
{| class="wikitable" style='white-space:nowrap;"
It was first announced in January 2013.
!style="{{CSS/LTA|s=|t=}}"|Alpha-Numeric<br>Code!!style="{{CSS/LTA|s=|t=}}"|Station Name!!style="{{CSS/LTA|s=|t=}}"|Image!!style="{{CSS/LTA|s=|t=}}"|Working names!!style="{{CSS/LTA|s=|t=}}"|Notes
 
|-
The Nature Society (Singapore) (NSS) has opposed the Cross Island MRT Line cutting through nature reserves and has proposed an alternative route that cuts southwards via Lornie Road around the reserve. The line was depicted to cut through the Central Catchment Nature Reserve near MacRitchie Reservoir. The alignment cuts directly under primary forest and regrowth forests over a century old, according to maps in the position paper. The NSS said its concerns relate to the degradation of forest habitats from soil investigation and related engineering works that will be required above-ground. Surface works are expected to result in forest clearance, compaction of soil along the rail line's alignment, toxic material spillage and siltation that will seriously damage one of the two most pristine stream ecosystems in the reserve. The society's proposed alternate route will add 1.7 kilometres to 2 kilometres to the Cross Island Line, and an estimated four minutes' additional travel time. [http://www.channelnewsasia.com/news/singapore/nature-society-proposes/749418.html]
!colspan=5 style="{{CSS/CRL|s=|t=}}"|{{Icon|MRT|B|18px|d=inline}} {{CRL|b=}} Stage 1
{{Stnline|{{Code/F|CR2|CRL}}|Aviation Park|CRL|Img=|Note=Terminus}}
{{Stnline|{{Code/F|CR3|CRL}}|Loyang|CRL|Img=}}
{{Stnline|{{Code/F|CR4|CRL}}|Pasir Ris East|CRL|Img=}}
{{Stnline|{{Code/F|CR5|CRL|rr=0|br=none}}{{Code/F|CP1|CRL|r=0|br=none}}{{Code/S|EW1|EWL|rl=0|bl=none}}|Pasir Ris|CRL|Img=|Note=Interchange with {{EWL}}}}
{{Stnline|{{Code/F|CR6|CRL}}|Tampines North|CRL|Img=}}
{{Stnline|{{Code/F|CR7|CRL}}|Defu|CRL|Img=}}
{{Stnline|{{Code/F|CR8|CRL|rr=0|br=none}}{{Code/S|NE14|NEL|rl=0|bl=none}}|Hougang|CRL|Img=|Note=Interchange with {{NEL}}}}
{{Stnline|{{Code/F|CR9|CRL}}|Serangoon North|CRL|Img=}}
{{Stnline|{{Code/F|CR10|CRL}}|Tavistock|CRL|Img=}}
{{Stnline|{{Code/F|CR11|CRL|rr=0|br=none}}{{Code/S|NS16|NSL|rl=0|bl=none}}|Ang Mo Kio|CRL|Img=|Note=Interchange with {{NSL}}}}
{{Stnline|{{Code/F|CR12|CRL}}|Teck Ghee|CRL|Img=}}
{{Stnline|{{Code/F|CR13|CRL|rr=0|br=none}}{{Code/S|TE7|TEL|rl=0|bl=none}}|Bright Hill|CRL|Img=|Note=Interchange with {{TEL}}}}
|-
!colspan=5 style="{{CSS/CRL|s=|t=}}"|{{Icon|MRT|B|18px|d=inline}} {{CRL|b=}} Stage 2
{{Stnline|{{Code/F|CR14|CRL}}|Turf City|CRL|Img=}}
{{Stnline|{{Code/F|CR15|CRL|rr=0|br=none}}{{Code/S|DT6|DTL|rl=0|bl=none}}|King Albert Park|CRL|Img=|Note=Interchange with {{DTL}}}}
{{Stnline|{{Code/F|CR16|CRL}}|Maju|CRL|Img=}}
{{Stnline|{{Code/F|CR17|CRL|rr=0|br=none}}{{Code/S|EW23|EWL|rl=0|bl=none}}|Clementi|CRL|Img=|Note=Interchange with {{EWL}}}}
{{Stnline|{{Code/F|CR18|CRL}}|West Coast|CRL|Img=}}
{{Stnline|{{Code/F|CR19|CRL}}|Jurong Lake District|CRL|Img=|Note=Terminus}}
|-
!colspan=5 style="{{CSS/CRL|s=|t=}}"|{{Icon|MRT|B|18px|d=inline}} Punggol Extension
{{Stnline|{{Code/F|CP2|CRL}}|Elias|CRL|Img=}}
{{Stnline|{{Code/F|CP3|CRL}}{{Code/J|CRL|PGLRT|f=}}{{Code/S|PE4|PGLRT}}|Riviera|CRL|Img=|Note=Interchange with {{PGLRT}}}}
{{Stnline|{{Code/F|CP4|CRL|rr=0|br=none}}{{Code/S|NE17|NEL|r=0|br=none|bl=none}}{{Code/S|PTC|PGLRT|rl=0|bl=none}}|Punggol|CRL|Img=|Note=Terminus<br>Interchange with {{NEL}} and {{PGLRT}}}}
|}
</div>


==References==
==References==
<references/>  
<references/>


==Related Links==
{{Mass Rapid Transit}}
{{Mass Rapid Transit}}
{{Railway Lines in Singapore}}
{{Cross Island Line}}
 
[[Category:Mass Rapid Transit Lines]]

Latest revision as of 23:02, 21 September 2022


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Sunday, 28 April 2024, feeder bus service
    296
    will be introduced, plying between Tampines Int and Tampines North Dr 2 (Loop).

Please refer here for more information.


SBS Transit
  • From Sunday, 28 April 2024, bus services
    11
    and
    158
    will call at a pair of new bus stops along Tanjong Rhu Road to enhance connectivity to the upcoming Tanjong Rhu Station on the Thomson-East Coast Line. Please refer here for more information.
CR
Cross Island Line
跨岛线
குறுக்கு தீவு வரி
Statistics
Status Under Construction (Stage 1)
Under Planning (Stage 2 & Punggol Extension)
Termini Aviation Park
Jurong Lake District
Punggol
Stations 12 (Stage 1)
6 (Stage 2)
3 (Punggol Extension)
Line length 29 km (Stage 1)
15 km (Stage 2)
7.3 km (Punggol Extension)

Cross Island Line (CRL) will be the eighth Mass Rapid Transit line in Singapore. The line will be 50 km long when fully constructed and is expected to begin service in 2030.[1]

Stations[edit]

Alpha-Numeric
Code
Station Name Image Working names Notes
icon Cross Island Line Stage 1
CR2 Aviation Park Aviation Park Terminus
CR3 Loyang Loyang
CR4 Pasir Ris East Pasir Ris East
CR5CP1EW1 Pasir Ris Pasir Ris Interchange with East–West Line
CR6 Tampines North Tampines North
CR7 Defu Defu
CR8NE14 Hougang Hougang Interchange with North East Line
CR9 Serangoon North Serangoon North
CR10 Tavistock Tavistock
CR11NS16 Ang Mo Kio Ang Mo Kio Interchange with North–South Line
CR12 Teck Ghee Teck Ghee
CR13TE7 Bright Hill Bright Hill Interchange with Thomson–East Coast Line
icon Cross Island Line Stage 2
CR14 Turf City Turf City
CR15DT6 King Albert Park King Albert Park Interchange with Downtown Line
CR16 Maju Maju
CR17EW23 Clementi Clementi Interchange with East–West Line
CR18 West Coast West Coast
CR19 Jurong Lake District Jurong Lake District Terminus
icon Punggol Extension
CP2 Elias Elias
CP3PE4 Riviera Riviera Interchange with Punggol LRT
CP4NE17PTC Punggol Punggol Terminus
Interchange with North East Line and Punggol LRT

References[edit]

  1. "Cross Island Line". Land Transport Authority. Retrieved 24 June 2020.
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah
icon Cross Island Line [ VTE ]
Stations Aviation ParkLoyangPasir Ris EastPasir RisTampines NorthDefuHougangSerangoon NorthTavistockAng Mo KioTeck GheeBright HillTurf CityKing Albert ParkMajuClementiWest CoastJurong Lake District
Punggol ExtensionPasir RisEliasRivieraPunggol
Rolling Stock CCR151
Depots Changi East
Others Cross Island Line Bridging Service