Difference between revisions of "Mitsubishi Heavy Industries Crystal Mover"
Jump to navigation
Jump to search
Line 56: | Line 56: | ||
==Fleet (Changi Airport Skytrain)== | ==Fleet (Changi Airport Skytrain)== | ||
*01 | *01 | ||
*02 | *02 | ||
*03 | *03 | ||
*04 | *04 | ||
*05 | *05 | ||
*06 | *06 | ||
*07 | *07 | ||
*08 | *08 | ||
*09 | *09 | ||
*10 | *10 | ||
* | *11 | ||
* | *12 | ||
* | *13 | ||
*14 | |||
*15 | |||
*16 | |||
*Notice: All Changi Airport Skytrain has no fixed trains, meaning all trains may do different routes in each day and there are a total of 16 trains. | |||
*On both ends in each trains, they have assigned a 'A' or 'B' side, just like those in Sengkang / Punggol LRT. So, one would see like '10a' & '10b' in a train number 10. | |||
*Thanks to NickL_C151 for the information. (By Samuel Lee, sgWiki nick as ussr1991) | |||
==Notes== | ==Notes== |
Revision as of 19:11, 6 March 2010
Mitsubishi Heavy Industries Crystal Mover
- Vehicle Dimensions: 11 840mm (length) × 2 690mm (width) × 3 615mm (height)
- Weight: 14.9t/vehicle
- Capacity: 105
- Maximum Speed: 70 km/h
- Average Speed: 35 km/h
- Track Gauge: Gauge, 1 850; guide rail span, 3 200
- In service: January 2003 - Current (Sengkang and Punggol LRT), March 2006 - Current (Changi Airport Skytrain)
- Line(s) Served: Sengkang and Punggol LRT, Changi Airport Skytrain
Fleet (Sengkang and Punggol LRT only)
Set 01 to 41
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Fleet (Changi Airport Skytrain)
- 01
- 02
- 03
- 04
- 05
- 06
- 07
- 08
- 09
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- Notice: All Changi Airport Skytrain has no fixed trains, meaning all trains may do different routes in each day and there are a total of 16 trains.
- On both ends in each trains, they have assigned a 'A' or 'B' side, just like those in Sengkang / Punggol LRT. So, one would see like '10a' & '10b' in a train number 10.
- Thanks to NickL_C151 for the information. (By Samuel Lee, sgWiki nick as ussr1991)
Notes
- The depot is within Changi Airport itself (Most likely somewhere near Terminal 1) and not to be confused with the Changi Depot (CHD) that is used by SMRT for East West Line (North South Line as well).
- Trains ply in Changi Airport Skytrain can be from T1 to T2, T2 to T3 and T1 to T3 vice versa and separates from restricted zone (Flight passengers who checked in security zone) and non restricted zone (Visitors who did not check in)
- The above list of skytrain is not fully completed. Please enhance it whenever possible.