Difference between revisions of "Changi Airport station"
m (→Layout) |
m (→Layout) |
||
Line 47: | Line 47: | ||
|Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office | |Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office | ||
|- | |- | ||
| | |colspan=2|{{RailRoute/1|A|EWL left|{{CG}}|{{CG1}}|{{CG2}}}} | ||
|- | |- | ||
|colspan=2 class="platform"|Platform A/B | |colspan=2 class="platform"|Platform A/B | ||
|- | |- | ||
| | |colspan=2|{{RailRoute/1|B|EWL left|{{CG}}|{{CG1}}|{{CG2}}}} | ||
|} | |} | ||
Revision as of 16:57, 27 March 2020
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
|
1 Changi Airport 樟宜机场 சாங்கி விமானநிலையம்*Graphic From SGTrains/Wikipedia/LTA | |
Statistics | |
---|---|
Address | 70 Airport Boulevard Singapore 819661 |
Line(s) | East–West Line |
Connections | File:Bus Logo.png File:Taxi Logo.png |
Abbreviation | CGA |
Changi Airport (CG2) is an underground Mass Rapid Transit (MRT) station on the East–West Line.
History
Date | Event |
---|---|
8 February 2002 | Station officially opens |
Train services were initially operated as a through service from Boon Lay station when this station opened. However, to cut costs due to low ridership, it was reverted into shuttle service on 22 July 2003.
Station Planning
The earlier plans had long been made for a new line branching off from the existing East West Line at Tanah Merah station with some conceptual plans showing a tentative route alignment up to the airport and continuing towards the city along the east coast of the island. When the extension to the airport was finally announced, however, the route alignment showed a deviation from previous plans.
The final plan involved building only the first two stations, namely Expo and Changi Airport. The alignment of the station at the airport has been switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of the station.
Layout
L3 | Linkbridge | to Jewel |
---|---|---|
Viewing Gallery | ||
L2 | Departure Hall | Changi Airport, Changi Airport Skytrain |
L1 | Arrival Hall | Changi Airport |
M | Linkbridge | |
B2 | Concourse | Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office |
Template:RailRoute/1 | ||
Platform A/B | ||
Template:RailRoute/1 |
Exits
Exit | Disabled-Access | Location/Nearby |
---|---|---|
A | Changi Airport Terminal 2, Jewel, Changi Airport Skytrain | |
B | Changi Airport Terminal 3, Jewel, Changi Airport Skytrain |
Transport Services
First/Last Train Timing
Destination | First Train | Last Train | ||
---|---|---|---|---|
Mon − Fri | Sat | Sun & P.H. | Daily | |
File:MRTFFF.png East West Line |
Bus
Bus Stop | Exit | Bus Service |
---|---|---|
95129 | Changi Airport PTB2 |
|
95109 | Changi Airport PTB3 |