Difference between revisions of "Bukit Panjang LRT"

From SgWiki
Jump to navigation Jump to search
m
Line 57: Line 57:
{{Stnline|{{Code|1|BPLRT|BP9}}|Bangkit|Img=}}
{{Stnline|{{Code|1|BPLRT|BP9}}|Bangkit|Img=}}
{{Stnline|{{Code|1|BPLRT|BP10}}|Fajar|Img=}}
{{Stnline|{{Code|1|BPLRT|BP10}}|Fajar|Img=}}
{{Stnline|{{Code|1|BPLRT|BP11}}|Segar|Img=}}
{{Stnline|{{Code|1|BPLRT|BP11}}|Segar|BPLRT}}
{{Stnline|{{Code|1|BPLRT|BP12}}|Jelapang|Img=}}
{{Stnline|{{Code|1|BPLRT|BP12}}|Jelapang|Img=}}
{{Stnline|{{Code|1|BPLRT|BP13}}|Senja|Img=}}
{{Stnline|{{Code|1|BPLRT|BP13}}|Senja|BPLRT}}
|-
|-
!colspan=5|Former Stations
!colspan=5|Former Stations

Revision as of 14:46, 17 July 2020

!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SMRT Buses
  • From 29 December 2024, short-trip service 182A will be introduced. Please refer here for more information.

SBS Transit SMRT Trains Tower Transit Go-Ahead

SBS Transit Go-Ahead
  • From Thursday, 2 January 2025, City Direct Services 675, 676, 677 & 678 will be introduced to provide a faster connection to the city for commuters along the North-East Corridor. Please refer here for more information.

SMRT Buses
  • From Sunday, 12 January 2025, bus service 967 will be introduced to enhance connectivity for commuters in Marsiling and Admiralty to nearby transport nodes and local amenities in Woodlands. Please refer here for more information.

SMRT Buses
  • From Monday, 13 January 2025, bus service 912M will be withdrawn with the introduction of new bus service 967 under the Land Transport Authority’s Bus Connectivity Enhancement Programme (BCEP). Please refer here for more information.

1

Bukit Panjang LRT
武吉班让轻轨
புக்கிட் பாஞ்சாங் லைட் ரெயில்
C801 112 x C801A.jpg
Statistics
Status Operational
Termini Choa Chu Kang
Ten Mile Junction
Stations 13
Services 2
Operator(s) SMRT Trains
Rolling stock C801,C801A
Line length 7.7 km
Electrification Third rail

Bukit Panjang LRT (BPLRT) is the first Light Rail Transit (LRT) line. Traveling one loop takes about 30 minutes. The line is currently 7.7 km long with 13 stations and it is fully automated. The project was contracted to Adtranz, Keppel Corporation and Gammon Construction.

The line was formally 7.9 km long with 14 stations prior to the overhaul and upgrading works. As a result, Ten Mile Junction station was permanently closed.

History

Date Event
6 November 1999 Choa Chu Kang - Ten Mile Junction
10 December 2010 Temporary closure of Ten Mile Junction station due to redevelopment of Ten Mile Junction Shopping Mall.
Service C withdrawn.
30 December 2011 Ten Mile Junction station reopened after Junction 10 Shopping Mall reopened.
Service C resumed operation.
13 January 2019 Closure of Ten Mile Junction station.
Service C withdrawn.
1 December 2019 Operation convert to uni-direction (Service B) except during Weekday Peak Hours.

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:LRTFFF.png Bukit Panjang LRT
2
Choa Chu Kang Choa Chu Kang-BPLRT.png Choa Chu Kang Terminus
Interchange with North–South Line
1
South View South View-BPLRT.png South View
1
Keat Hong Keat Hong-BPLRT.png Keat Hong
1
Teck Whye Teck Whye-BPLRT.png Teck Whye
1
Phoenix Phoenix-BPLRT.png Phoenix
2
Bukit Panjang Bukit Panjang-BPLRT.png Bukit Panjang Interchange with Downtown Line
1
Petir Petir-BPLRT.png Petir
1
Pending Pending-BPLRT.png Pending
1
Bangkit Bangkit
1
Fajar Fajar
1
Segar Segar-BPLRT.png Segar
1
Jelapang Jelapang
1
Senja Senja-BPLRT.png Senja
Former Stations
1
Ten Mile Junction Ten Mile Junction-BPLRT.png Ten Mile Junction Closed

Services

Service Route Notes
A Choa Chu KangSenjaPetirChoa Chu Kang Peak Hour Service
B Choa Chu KangPetirSenjaChoa Chu Kang
C Ten Mile JunctionSenjaPetirTen Mile Junction Former Service

Rolling stock

The rolling stock consists of Bombardier INNOVIA C801 and Bombardier INNOVIA C801A trains. These trains operate from Ten Mile Junction Depot near Bukit Panjang station. The Ten Mile Junction Depot has maintenance and train overhaul facilities for trains along the Bukit Panjang LRT Line.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bridging Service