Bukit Panjang LRT

From SgWiki
Jump to: navigation, search
!
NOTICE
!
To prevent multiple account abusers, any new users who vandalised/inserting false information will be banned indefinitely and the affected page locked permanently. Subsequent account created within 48 hours after any banned action will be banned indefinitely.

Please ensure that your username does not contain any existing username (case insensitive), bus/train model name/identification and/or any other offensive, profanity or insults to harass, scold, or mimic any of our existing users. Any such username will be banned indefinitely with talk page privilege revoked.


!
TRAVEL ADVISORY
!
North East Line: Due to mid-life upgrading works, train services between Serangoon and Punggol stations will end at 11pm. Shuttle bus services are available between Serangoon and Punggol stations. Certain bus services will be extended to coincide with the last shuttle bus timing.
SBS Transit: Bus Service 253, 255, 257, 400 and 402 will have operate at a lower frequency during off-peak hours. Affected commuters may try the on-demand bus service during these time.
SMRT Buses: Bus Service NR7 will not be in operation. Affected commuters may try the on-demand bus service from 11.30pm to 2pm.
SMRT Buses: Bus Service 913 will be amended to loop at Woodlands Avenue 3 (Marsiling Stn), skipping Woodlands Centre Rd from 17 March 2018. Please refer to SMRT's Website for more information.
SMRT Buses: Bus Service 913M will be introduced from 17 March 2018. Please refer to SMRT's Website for more information.
Bukit Panjang LRT
武吉班让轻轨
C801 112 x C801A.jpg
Statistics
Status Operational
Termini Choa Chu Kang
Ten Mile Junction
Stations 13
Services 2
Operator(s) SMRT
Rolling stock C801,C801A
Line length 7.6 km
Electrification Third rail

Bukit Panjang LRT (BPLRT) is the first Light Rail Transit (LRT) line. Traveling one loop takes about 30 minutes. The line is currently 7.6 km long with 13 stations and it is fully automated. The project was contracted to Adtranz, Keppel Corporation and Gammon Construction.

Formally at 7.8km with 14 station, with the closure of Ten Mile Junction station, the line will undergo overhaul and upgrading works.

History

Initial System
6 November 1999 Choa Chu Kang - Ten Mile Junction
10 December 2010 Service C was withdrawn due to redevelopment of Ten Mile Junction.
30 December 2011 Service C resumed its service after Junction 10 shopping mall was re-opened.
13 January 2019 Service C withdrawn. Closure of Ten Mile Junction station.

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
Bukit Panjang LRT
BP1
NS4
Choa Chu Kang Choa Chu Kang-BPLRT.png Choa Chu Kang Terminus
Interchange with North South Line
BP2
South View South View-BPLRT.png South View
BP3
Keat Hong Keat Hong-BPLRT.png Keat Hong
BP4
Teck Whye Teck Whye
BP5
Phoenix Phoenix
BP6
DT1
Bukit Panjang Bukit Panjang-BPLRT.png Bukit Panjang Interchange with Downtown Line
BP7
Petir Petir-BPLRT.png Petir
BP8
Pending Pending
BP9
Bangkit Bangkit
BP10
Fajar Fajar
BP11
Segar Segar
BP12
Jelapang Jelapang
BP13
Senja Senja
Former Stations
BP14
Ten Mile Junction Ten Mile Junction-BPLRT.png Ten Mile Junction Closed

Services

Service Route Notes
A Choa Chu KangSenjaPetirChoa Chu Kang
B Choa Chu KangPetirSenjaChoa Chu Kang
C Ten Mile JunctionSenjaPetirTen Mile Junction Former Service

Rolling stock

The rolling stock consists of Bombardier INNOVIA C801 and Bombardier INNOVIA C801A trains. These trains operate from Ten Mile Junction Depot near Bukit Panjang station. The Ten Mile Junction Depot has maintenance and train overhaul facilities for trains along the Bukit Panjang LRT Line.

References


Light Rail Transit [ VTE ]
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks Bombardier INNOVIA C801Bombardier INNOVIA C801A • Bombardier INNOVIA C801B • Mitsubishi Heavy Industries C810Mitsubishi Heavy Industries C810A
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North South LineEast West LineNorth East LineCircle LineDowntown LineThomson–East Coast LineJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Others Changi Airport SkytrainSentosa Express
Defunct Sentosa Monorail (SDC)
Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
Former: Ten Mile Junction
Rolling Stock C801C801AC801B
Depots Ten Mile Junction