Difference between revisions of "Changi Airport Extension"

From SgWiki
Jump to navigation Jump to search
m (Changed redirect target from East West Line to East–West Line)
Tag: Redirect target changed
 
(8 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{| class="toccolours" style="float: right; border-collapse: collapse; margin: 0em 1em;" border="1" cellpadding="2" cellspacing="0"
#REDIRECT [[East–West Line]]
| colspan="2" style="text-align:center" | <big><strong>East West MRT Line<br>东西地铁线<br>கிழக்கு மேற்கு எம்ஆர்டி வழி</strong></big>
|-
| colspan="2"| [[Image:EWL.png|center|300px]]The East West Line is coloured green on system maps.
|-
| style="background:#efefef;" align="center" colspan="2"| <strong>Overview</strong>
|-
! Type
| Rapid transit
|-
! System
| Mass Rapid Transit (Singapore)
|-
! Status
| Operational
|- 
! Termini
| [[Pasir Ris MRT Station|Pasir Ris]]<br>[[Joo Koon MRT Station|Joo Koon]]<br>[[Tanah Merah MRT Station|Tanah Merah]]<br>[[Changi Airport MRT Station|Changi Airport]]
|-
! Stations
| 31
|-
! Services
| 2
|-
| style="background:#efefef;" align="center" colspan="2"| <strong>Operation</strong>
|- 
! Opened
| 12 December 1987
|-
! Owner
| Land Transport Authority
|-
! Operator(s)
| SMRT Trains
|-
! Rolling stock
| [[Kawasaki Heavy Industries C151|C151]], [[Siemens C651|C651]], [[Kawasaki Heavy Industries & Nippon Sharyo C751B|C751B]]
|-
| style="background:#efefef;" align="center" colspan="2"| <strong>Technical</strong>
|-
! Line length
| 49.2 km (30.6 mi)
|-
! Track gauge
| 1,435 mm (4 ft 8+1⁄2 in) Standard gauge
|-
! Electrification
|Third rail
|}
 
The '''Changi Airport Extension (part of East West Line)''' is a line in Singapore.
==History==
* 10 January 2001: Tanah Merah MRT Station - Expo MRT Station
* 8 February 2002: Expo MRT Station - Changi Airport MRT Station
 
==Stations==
{| border="1" cellpadding="5" cellspacing="0" align="center" style="text-align:centre"
|-
! rowspan="2" | Alpha-Numeric<br>Code !! rowspan="2" | Abbreviation !! colspan="3" | Station Name !! rowspan="2" | Working names !! rowspan="2" | Notes'''
|-
| style="text-align:center" | English || style="text-align:center" | Chinese || style="text-align:center" | Tamil
|-
! colspan="7" style="background-color:green;color:white" | Changi Airport Extension
|-
| style="text-align:center" | EW4 || style="text-align:center" | TNM || [[Tanah Merah MRT Station|Tanah Merah]] || 丹那美拉 || தானா மேரா || Bedok, Changi || Interchange station with EWL
|-
| style="text-align:center" | CG1 / ''DT35'' || style="text-align:center" | XPO || [[Expo MRT Station|Expo]] || 博览 || எக்ஸ்போ || Somapah || Future Interchange station with DTL
|-
| style="text-align:center" | CG2 || style="text-align:center" | CGA || [[Changi Airport MRT Station|Changi Airport]] || 樟宜机场 || சாங்கி விமானநிலையம || Changi Airport || Terminus '''(3)'''
|}
<br>
Note: SMRT have been operating the branch sector of Tanah Merah to Changi Airport as a through line from Boon Lay (Boon Lay - Changi Airport via Tanah Merah) since the opening of Changi Airport station on 2002 until July 22, 2003 due to low demands on Expo and Changi Airport that SMRT reverted this sector as shuttle service where trains from Changi Airport will terminate at Tanah Merah instead of through service where trains will terminate at Boon Lay (Joo Koon was not built back then).<ref>http://www.smrt.com.sg/news/News.asp?N_YYear=2003</ref>{{Clarification needed|date=October 2010}} Similar to the through service, the interval of trains remained as 12 minutes per train.
 
== Rolling stock ==
Three batches of rolling stock are in service on the line, i.e. the [[Kawasaki Heavy Industries C151]], the [[Siemens C651]] and the [[Kawasaki Heavy Industries & Nippon Sharyo C751B]]. These trains operate from the two depots along the East West Line, the Ulu Pandan Depot near Jurong East MRT Station and the Changi Depot after Tanah Merah MRT Station.
 
== References ==
</references>
==Category Links==
{{Mass Rapid Transit (Singapore)}}

Latest revision as of 10:32, 9 May 2022

Redirect to: