Difference between revisions of "History of City Direct Services"

From SgWiki
Jump to navigation Jump to search
(City Direct 666 added)
 
(109 intermediate revisions by 14 users not shown)
Line 1: Line 1:
==Service 651 {{WAB}} ==
==Service 651 {{WAB}} ==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
Line 8: Line 9:
|-
|-
!rowspan="3"|{{ComfortDelGro Bus}}
!rowspan="3"|{{ComfortDelGro Bus}}
|rowspan="2"|'''2013'''
!rowspan="6"|Jurong West Ave 3 → Marina Blvd (AM)<br>Central Blvd → Jurong West Ave 3 (PM)<br>(2013 - Apr 2020)
|'''2 September'''
|rowspan="2"|2013
|Introduced between Jurong West Ave 3 and Marina Blvd (AM Peak) and between Central Blvd and Jurong West Ave 3 (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|2 September
|Introduced between Jurong West Ave 3 (Opp Blk 276B) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Aft Marina Stn Rd) and Jurong West Ave 3 (Blk 276B) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|-
|'''1 December'''
|1 December
|Serves new bus stop outside Downtown Stn along Central Blvd.
|Serves new bus stop outside Downtown Stn along Central Blvd.
|-
|-
|'''2015'''
|2015
|'''23 March'''
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|-
!{{Rui Feng Chartered}}
!{{Rui Feng Chartered}}
|'''2016'''
|2016
|'''3 October'''
|3 October
|Operations transferred to Rui Feng Chartered.
|Operations transferred to Rui Feng Chartered.
|-
|-
!{{Tower Transit Singapore}}<br>(Current)
!rowspan="5"|{{TTS}}<br>(Current)
|'''2020'''
|rowspan="5"|2020
|'''13 January'''
|rowspan="2"|13 January
|Operations transferred to Tower Transit Singapore.
|Operations transferred to Tower Transit Singapore.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!Jurong West Ave 3 → Marina Blvd (AM)<br>Central Blvd → Jurong West Ave 3 (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|}
|}


==Service 652 {{WAB}} ==
==Service 652 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!rowspan="2"|{{Ren Quan Transport}}
!rowspan="6"|{{Ren Quan Transport}}
|'''2014'''
!rowspan="9"|Upp Thomson Rd → Shenton Way (AM)<br>Anson Rd → Upp Thomson Rd (PM)<br>(2014 - Apr 2020)
|'''6 January'''
|rowspan="3"|2014
|Introduced between Upp Thomson Rd and Shenton Way (AM Peak) and between Anson Rd and Upp Thomson Rd (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|6 January
|Introduced between Upp Thomson Rd (Opp Sembawang Hills FC) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Upp Thomson Rd (Bef Sembawang Hills FC) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|-
|'''2015'''
|17 March
|'''23 March'''
|3rd AM peak trip added.
|-
|14 July
|4th AM peak trip added.
|-
|rowspan="2"|2015
|19 January
|5th AM peak trip added.
|-
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|-
!{{SMRT Buses}}<br>(Current)
|2018
|'''2020'''
|25 June
|'''6 January'''
|6th AM peak trip added.
|-
!rowspan="6"|{{SMB}}
|rowspan="6"|2020
|rowspan="3"|6 January
|Operations transferred to SMRT Buses.
|Operations transferred to SMRT Buses.
|-
|2 AM peak trips removed.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="2"|Upp Thomson Rd → Shenton Way (AM)<br>Anson Rd → Upp Thomson Rd (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|-
!{{SBST}}<br>(Current)
|2021
|6 September
|Operations transferred to SBS Transit.
|}
|}


==Service 653 {{WAB}}==
==Service 653 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!rowspan="2"|{{ComfortDelGro Bus}}
!rowspan="7"|{{ComfortDelGro Bus}}
|'''2014'''
!rowspan="10"|Hume Ave → Marina Blvd (AM)<br>Central Blvd → Hillview Ave (PM)<br>(2014 - Apr 2020)
|'''13 January'''
|rowspan="3"|2014
|Introduced between Hume Ave and Marina Blvd (AM Peak) and between Central Blvd and Hillview Ave (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|13 January
|Introduced between Hume Ave (Bef Summerhill) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Aft Marina Stn Rd) and Hillview Ave (Hillington Green Condo) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|-
|'''2015'''
|31 March
|'''23 March'''
|3rd AM peak trip added.
|-
|4 August
|4th AM peak trip added.
|-
|rowspan="4"|2015
|16 March
|5th AM peak trip added.
|-
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|-
!{{SMRT Buses}}<br>(Current)
|29 June
|'''2017'''
|3rd PM peak trip added.
|'''13 April'''
|-
|26 October
|6th AM peak trip added.
|-
!rowspan="6"|{{SMB}}
|rowspan="3"|2017
|rowspan="3"|13 April
|Operations transferred to SMRT Buses.
|Operations transferred to SMRT Buses.
|-
|2 AM peak trips and 1 PM peak trip removed.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|rowspan="3"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="3"|Hume Ave → Marina Blvd (AM)<br>Central Blvd → Hillview Ave (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|-
!rowspan="2"|{{TTS}}<br>(Current)
|2021
|31 May
|Operations transferred to Tower Transit Singapore.
|-
|2024
|15 April
|5th AM peak trip added.
|}
|}


==Service 654 {{WAB}}==
==Service 654 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!rowspan="2"|{{Ren Quan Transport}}
!rowspan="5"|{{Ren Quan Transport}}
|'''2014'''
!rowspan="9"|Anchorvale St → Shenton Way (AM)<br>Anson Rd → Anchorvale St (PM)<br>(2014 - Apr 2020)
|'''20 January'''
|rowspan="2"|2014
|Introduced between Anchorvale St and Shenton Way (AM Peak) and between Anson Rd and Anchorvale St (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|20 January
|Introduced between Anchorvale St (Blk 336B) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Anchorvale St (Blk 330) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|14 July
|3rd AM peak trip added.
|-
|-
|'''2015'''
|rowspan="2"|2015
|'''23 March'''
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|-
!{{BT & Tan Transport}}
|2 November
|'''2017'''
|4th AM peak trip added.
|'''20 January'''
|-
|2016
|13 June
|5th AM peak trip added.
|-
!rowspan="2"|{{BT & Tan Transport}}
|2017
|20 January
|Operations transferred to BT & Tan Transport Service.
|Operations transferred to BT & Tan Transport Service.
|-
|-
!{{SBS Transit}}<br>(Current)
|2018
|'''2019'''
|12 June
|'''22 July'''
|6th AM peak trip added. 3rd PM peak trip added.
|-
!rowspan="6"|{{SBST}}<br>(Current)
|rowspan="2"|2019
|rowspan="2"|22 July
|Operations transferred to SBS Transit.
|Operations transferred to SBS Transit.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|rowspan="3"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!Anchorvale St → Shenton Way (AM)<br>Anson Rd → Anchorvale St (PM)<br>(Jun 2020 - Nov 2024)
|2 June
|Resumed normal operations.
|-
!Anchorvale Cres → Shenton Way (AM)<br>Anson Rd → Anchorvale Cres (PM)<br>(since Nov 2024)
|2024
|11 November
|Extended to Anchorvale Cres under the LTA's Bus Connectivity Enhancement Programme (BCEP), with additional 2 morning trips and 1 evening trip.
|}
|}


==Service 655 {{WAB}}==
==Service 655 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
Line 113: Line 241:
|-
|-
!rowspan="2"|{{Woodlands Transport}}
!rowspan="2"|{{Woodlands Transport}}
|'''2014'''
!rowspan="4"|West Coast Rd → Marina Blvd (AM)<br>Central Blvd → West Coast Rd (PM)<br>(2014 - Apr 2020)
|'''17 February'''
|2014
|Introduced between West Coast Rd and Marina Blvd (AM Peak) and between Central Blvd and West Coast Rd (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|17 February
|Introduced between West Coast Rd (Bet Blks 50/51) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Aft Marina Stn Rd) and West Coast Rd (Opp Blk 51) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|-
|'''2015'''
|2015
|'''23 March'''
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|-
!rowspan="2"|{{SBS Transit}}<br>(Current)
!rowspan="7"|{{SBST}}<br>(Current)
|rowspan="2"|'''2017'''
|rowspan="2"|2017
|'''17 April'''
|17 April
|Operations transferred to SBS Transit.
|Operations transferred to SBS Transit.
|-
|-
|'''21 August'''
|21 August
|{{DWAB}}
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|rowspan="3"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="3"|West Coast Rd → Marina Blvd (AM)<br>Central Blvd → West Coast Rd (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|-
|rowspan="2"|2023
|8 January
|Amended to ply realigned Teban Gdns Rd with the permanent partial closure of Teban Gdns Rd to facilitate the construction of Pandan Reservoir MRT station on the Jurong Region MRT Line.
|-
|9 October
|3rd AM peak trip added.
|}
|}


==Service 656 {{WAB}}==
==Service 656 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!rowspan="2"|{{Loh Gim Chong Transport}}
!rowspan="4"|{{Loh Gim Chong Transport}}
|'''2014'''
!rowspan="7"|Canberra Rd → Shenton Way (AM)<br>Anson Rd → Canberra Rd (PM)<br>(2014 - Apr 2020)
|'''17 February'''
|rowspan="3"|2014
|Introduced between Canberra Rd and Shenton Way (AM Peak) and between Anson Rd and Canberra Rd (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|17 February
|Introduced between Canberra Rd (Blk 424A CP) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Canberra Rd (Blk 508 CP) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|10 March
|3rd AM peak trip added.
|-
|14 July
|4th AM peak trip added.
|-
|-
|'''2015'''
|2015
|'''23 March'''
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|-
!{{SMRT Buses}}<br>(Current)
!rowspan="7"|{{SMB}}
|'''2017'''
|rowspan="3"|2017
|'''17 April'''
|rowspan="3"|17 April
|Operations transferred to SMRT Buses.
|Operations transferred to SMRT Buses.
|-
|1 AM peak trip removed.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|rowspan="4"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="3"|Canberra Rd → Shenton Way (AM)<br>Anson Rd → Canberra Rd (PM)<br>(since Jun 2020)
|rowspan="2"|2 June
|Resumed normal operations.
|-
|1 AM peak trip removed.
|-
!{{TTS}}<br>(Current)
|2021
|3 October
|Operations transferred to Tower Transit Singapore.
|}
|}


==Service 657 {{WAB}}==
==Service 657 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!rowspan="2"|Transtar Travel
!rowspan="2"|{{Transtar Travel}}
|'''2014'''
!rowspan="4"|Jurong West Ave 1 → Marina Blvd (AM)<br>Central Blvd → West Coast Rd (PM)<br>(2014 - Apr 2020)
|'''24 February'''
|2014
|Introduced between Jurong West Ave 1 and Marina Blvd (AM Peak) and between Central Blvd and Jurong West Ave 1 (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|24 February
|Introduced between Jurong West Ave 1 (Blk 538) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Aft Marina Stn Rd) and Jurong West Ave 1 (Blk 536) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|-
|'''2015'''
|2015
|'''23 March'''
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|-
!{{SMRT Buses}}<br>(Current)
!rowspan="5"|{{SMB}}
|'''2017'''
|rowspan="2"|2017
|'''24 April'''
|rowspan="2"|24 April
|Operations transferred to SMRT Buses.
|Operations transferred to SMRT Buses.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|rowspan="3"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="2"|Jurong West Ave 1 → Marina Blvd (AM)<br>Central Blvd → West Coast Rd (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|-
!{{TTS}}<br>(Current)
|2021
|31 May
|Operations transferred to Tower Transit Singapore.
|}
==Service 658 (2014 - 2018)==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="PAST"
!Operator
!Year
!Date
!Service changes
|-
!rowspan="4"|{{Aedge Holdings}}
|2014
|19 May
|Introduced between Bedok Reservoir Rd (Blk 122) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Jln Damai (Opp Blk 668) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|2015
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|2016
|25 April
|Amended to serve Jalan Tenaga instead of Jalan Damai due to reinstatement of Kaki Bt Ave 1.
|-
|2018
|17 December
|Discontinued.
|}
==Service 659 (2014 - 2018)==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="PAST"
!Operator
!Year
!Date
!Service changes
|-
!rowspan="4"|{{Aedge Holdings}}
|2014
|9 June
|Introduced between Bedok Sth Rd (Opp Temasek JC) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Bedok Sth Rd (Temasek JC) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|rowspan="2"|2015
|19 January
|3rd AM peak trip added.
|-
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|2018
|17 December
|Discontinued.
|}
|}


==Service 660 {{WAB}}==
==Service 660 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!rowspan="2"|{{Aedge Holdings}}
!rowspan="5"|{{Aedge Holdings}}
|'''2014'''
!rowspan="8"|Buangkok Green → Shenton Way (AM)<br>Anson Rd → Buangkok Green (PM)<br>(2014 - Apr 2020)
|'''23 June'''
|rowspan="2"|2014
|Introduced between Buangkok Green and Shenton Way (AM Peak) and between Anson Rd and Buangkok Green (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|23 June
|Introduced between Buangkok Green (Opp Blk 968) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Buangkok Green (Blk 969) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|1 September
|3rd AM peak trip added.
|-
|-
|'''2015'''
|rowspan="2"|2015
|'''23 March'''
|23 March
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
|-
|-
!{{SBS Transit}}<br>(Current)
|11 May
|'''2019'''
|4th AM peak trip added.
|'''2 January'''
|-
|2018
|25 June
|5th AM peak trip added.
|-
!rowspan="8"|{{SBST}}<br>(Current)
|rowspan="3"|2019
|rowspan="3"|2 January
|Operations transferred to SBS Transit.
|Operations transferred to SBS Transit.
|-
|1 AM peak trip removed.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|rowspan="3"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="3"|Buangkok Green → Shenton Way (AM)<br>Anson Rd → Buangkok Green (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|-
|rowspan="2"|2023
|11 September
|5th AM peak trip added.
|-
|26 December
|6th and 7th AM peak trips added.
|}
==Service 660M {{WAB}}==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
!Operator
!Route
!Year
!Date
!Service changes
|-
!{{SBST}}<br>(Current)
!Buangkok Crescent → Shenton Way (AM)<br>Anson Rd → Buangkok Crescent (PM)
|2024
|11 November
|Introduced between Buangkok Cres (Blk 991A) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Mapletree Anson) and Buangkok Cres (Opp Blk 991A) during evening peak hours, operating as a peak hour one-directional supplementary service on weekdays under the LTA's Bus Connectivity Enhancement Programme (BCEP). Wheelchair-accessible at launch.
|}
|}


==Service 661 {{WAB}}==
==Service 661 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!{{Aedge Holdings}}
!rowspan="2"|{{Aedge Holdings}}
|'''2015'''
!rowspan="5"|Pasir Ris Dr 3 → Marina Blvd (AM)<br>Central Blvd → Pasir Ris Dr 3 (PM)<br>(2015 - Apr 2020)
|'''22 September'''
|2015
|Introduced between Pasir Ris Dr 3 and Marina Blvd (AM Peak) and between Central Blvd and Pasir Ris Dr 3 (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|22 September
|Introduced between Pasir Ris Dr 3 (Blk 479) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Pasir Ris Dr 3 (Opp Blk 479) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|2016
|25 July
|3rd AM peak trip added.
|-
|-
!{{Go-Ahead Singapore}}<br>(Current)
!rowspan="8"|{{GAS}}<br>(Current)
|'''2019'''
|rowspan="3"|2019
|'''2 January'''
|rowspan="3"|2 January
|Operations transferred to Go-Ahead Singapore.
|Operations transferred to Go-Ahead Singapore.
|-
|1 AM peak trip removed.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|rowspan="3"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!Pasir Ris Dr 3 → Marina Blvd (AM)<br>Central Blvd → Pasir Ris Dr 3 (PM)<br>(Jun 2020 - 2021)
|2 June
|Resumed normal operations.
|-
!{{N/A}}
|2021
|15 September
|Temporarily suspended due to the impact of COVID-19 on available manpower.
|-
!Pasir Ris Dr 3 → Marina Blvd (AM)<br>Central Blvd → Pasir Ris Dr 3 (PM)<br>(since 2022)
|2022
|3 February
|Resumed normal operations.
|}
==Service 662 (2015 - 2018)==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="PAST"
!Operator
!Year
!Date
!Service changes
|-
!rowspan="2"|{{Aedge Holdings}}
|2015
|22 September
|Introduced between Choa Chu Kang Nth 7 (Blk 619) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Choa Chu Kang Nth 7 (Regent Gr Condo) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|2018
|17 December
|Discontinued.
|}
|}


==Service 663 {{WAB}}==
==Service 663 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!Bus Hub Service
!{{Bus Hub Service}}
|'''2015'''
!rowspan="4"|Yishun Ave 6 → Shenton Way (AM)<br>Anson Rd → Yishun Ave 6 (PM)<br>(2015 - Apr 2020)
|'''28 September'''
|2015
|Introduced between Yishun Ave 6 and Shenton Way (AM Peak) and between Anson Rd and Yishun Ave 6 (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|28 September
|Introduced between Yishun Ave 6 (Bet Blks 405/406) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Mapletree Anson) and Yishun Ave 6 (Opp Blk 406) during evening peak hours, operating 4 trips in the morning and 2 trips in the evening as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|-
!{{Tower Transit Singapore}}<br>(Current)
!rowspan="9"|{{TTS}}<br>(Current)
|'''2017'''
|rowspan="3"|2017
|'''28 September'''
|rowspan="3"|28 September
|Operations transferred to Tower Transit Singapore.
|Operations transferred to Tower Transit Singapore.
|-
|1 AM peak trip removed.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|rowspan="3"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="4"|Yishun Ave 6 → Shenton Way (AM)<br>Anson Rd → Yishun Ave 6 (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|-
|2021
|26 April
|Serves new bus stop outside Blk 382C along Yishun Ave 6.
|-
|2022
|26 September
|Serves new bus stop opposite Blk 382C along Yishun Ave 6.
|-
|2023
|28 August
|4th AM peak trip added.
|}
==Service 664 (2015 - 2018)==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="PAST"
!Operator
!Year
!Date
!Service changes
|-
!rowspan="2"|{{Aedge Holdings}}
|2015
|6 October
|Introduced between Tampines St 41 (Blk 417) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Tampines St 41 (Blk 418) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|2018
|17 December
|Discontinued.
|}
|}


==Service 665 {{WAB}}==
==Service 665 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!Bus Hub Service
!rowspan="2"|{{Bus Hub Service}}
|'''2015'''
!rowspan="4"|Marsiling Dr → Shenton Way (AM)<br>Anson Rd → Marsiling Dr (PM)<br>(2015 - Apr 2020)
|'''12 October'''
|2015
|Introduced between Marsiling Dr and Shenton Way (AM Peak) and between Anson Rd and Marsiling Dr (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|12 October
|Introduced between Marsiling Dr (Blk 32) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Mapletree Anson) and Marsiling Dr (Blk 203) during evening peak hours, operating 5 trips in the morning and 2 trips in the evening as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|2016
|4 January
|6th AM peak trip added.
|-
|-
!{{Tower Transit Singapore}}<br>(Current)
!rowspan="5"|{{TTS}}
|'''2017'''
|rowspan="2"|2017
|'''12 October'''
|rowspan="2"|12 October
|Operations transferred to Tower Transit Singapore.
|Operations transferred to Tower Transit Singapore.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|rowspan="3"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="3"|Marsiling Dr → Shenton Way (AM)<br>Anson Rd → Marsiling Dr (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|-
!rowspan="2"|{{SMB}}<br>(Current)
|2021
|31 May
|Operations transferred to SMRT Buses.
|-
|2023
|29 May
|1 AM peak trip removed.
|}
|}


==Service 666==
==Service 666 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!{{BT & Tan Transport}}<br>(Current)
!{{BT & Tan Transport}}
|'''2016'''
!rowspan="3"|Punggol Dr → Marina Blvd (AM)<br>Central Blvd → Punggol Dr (PM)<br>(2016 - Apr 2020)
|'''29 February'''
|2016
|Introduced between Punggol Dr and Marina Blvd (AM Peak) and between Central Blvd and Punggol Dr (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|29 February
|Introduced between Punggol Dr (Opp Blk 612A) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Punggol Dr (Blk 612A) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
!rowspan="8"|{{GAS}}<br>(Current)
|rowspan="5"|2020
|rowspan="2"|2 March
|Operations transferred to Go-Ahead Singapore.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!Punggol Dr → Marina Blvd (AM)<br>Central Blvd → Punggol Dr (PM)<br>(Jun 2020 - 2021)
|2 June
|Resumed normal operations.
|-
!{{N/A}}
|2021
|15 September
|Temporarily suspended due to the impact of COVID-19 on available manpower.
|-
|-
!{{Go-Ahead Singapore}}
!Punggol Dr → Marina Blvd (AM)<br>Central Blvd → Punggol Dr (PM)<br>(2022 - Nov 2024)
|'''2020'''
|2022
|'''2 March'''
|3 February
|Operations to be transferred to Go-Ahead Singapore.
|Resumed normal operations.
|-
!Punggol Dr → Raffles Blvd (AM)<br>Temasek Blvd → Punggol Dr (PM)<br>(since Nov 2024)
|2024
|25 November
|To be extended to Raffles Blvd / Temasek Blvd via Bayfront Ave under the Bus Connectivity Enhancement Programme (BCEP), with additional 1 morning trip.
|}
 
==Service 667 {{WAB}}==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
!Operator
!Route
!Year
!Date
!Service changes
|-
!{{Tong Tar Transport Service}}
!rowspan="3"|Clementi Ave 4 → Marina Blvd (AM)<br>Central Blvd → Clementi Ave 4 (PM)<br>(2016 - Apr 2020)
|2016
|8 March
|Introduced between Clementi Ave 4 (Blk 308) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Clementi Ave 4 (Blk 308) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
!rowspan="5"|{{SBST}}<br>(Current)
|rowspan="5"|2020
|rowspan="2"|9 March
|Operations transferred to SBS Transit.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!Clementi Ave 4 → Marina Blvd (AM)<br>Central Blvd → Clementi Ave 4 (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|}
 
==Service 668 {{WAB}}==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
!Operator
!Route
!Year
!Date
!Service changes
|-
!rowspan="5"|{{BT & Tan Transport}}
!rowspan="2"|Ang Mo Kio Ave 5 → Marina Blvd (AM)<br>Central Blvd → Ang Mo Kio Ave 5 (PM)<br>(2016 - Apr 2020)
|2016
|15 March
|Introduced between Ang Mo Kio Ave 5 (Opp Blk 649) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Ang Mo Kio Ave 5 (Blk 649) during evening peak hours, operating 3 trips in the morning and 2 trips in the evening as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|2018
|25 June
|4th AM peak trip added.
|-
!rowspan="2" {{N/A}}
|rowspan="5"|2020
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="3"|Ang Mo Kio Ave 5 → Marina Blvd (AM)<br>Central Blvd → Ang Mo Kio Ave 5 (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|-
!rowspan="2"|{{SBST}}<br>(Current)
|rowspan="2"|14 December
|Operations transferred to SBS Transit.
|-
|{{DWAB}}
|}
 
==Service 669 (2016 - 2019)==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="PAST"
!Operator
!Year
!Date
!Service changes
|-
!rowspan="2"|{{Tong Tar Transport Service}}
|2016
|22 March
|Introduced between Bedok Nth Rd (Bedok Nth Stn Exit A) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Bedok Nth Rd (Bet Blks 705/706) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|2019
|3 June
|Discontinued.
|}
 
==Service 670 {{WAB}}==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
!Operator
!Route
!Year
!Date
!Service changes
|-
!{{Tong Tar Transport Service}}
!rowspan="4"|Yishun Ave 7 → Marina Blvd (AM)<br>Central Blvd → Yishun Ave 7 (PM)<br>(2016 - Apr 2020)
|2016
|29 March
|Introduced between Yishun Ave 7 (Opp Blk 288) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Yishun Ave 7 (Blk 289) during evening peak hours, operating 3 trips in the morning and 2 trips in the evening as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
!rowspan="6"|{{SMB}}
|rowspan="6"|2020
|rowspan="3"|30 March
|Operations transferred to SMRT Buses.
|-
|1 AM peak trip removed.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="2"|Yishun Ave 7 → Marina Blvd (AM)<br>Central Blvd → Yishun Ave 7 (PM)<br>(since Jun 2020)
|2 June
|Resumed normal operations.
|-
!{{TTS}}<br>(Current)
|2021
|5 September
|Operations transferred to Tower Transit Singapore.
|}
|}


==Service 671 {{WAB}}==
==Service 671 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!{{Rui Feng Chartered}}
!rowspan="2"|{{Rui Feng Chartered}}
|'''2016'''
!rowspan="5"|Punggol Rd → Marina Blvd (AM)<br>Central Blvd → Punggol Rd (PM)<br>(2016 - Apr 2020)
|'''17 October'''
|2016
|Introduced between Punggol Rd and Marina Blvd (AM Peak) and between Central Blvd and Punggol Rd (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|17 October
|Introduced between Punggol Rd (Opp The Rivervale) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Punggol Rd (The Rivervale) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|2018
|25 June
|3rd AM peak trip added.
|-
|-
!{{SBS Transit}}<br>(Current)
!rowspan="10"|{{SBST}}<br>(Current)
|'''2020'''
|rowspan="6"|2020
|'''13 January'''
|rowspan="3"|13 January
|Operations transferred to SBS Transit.
|Operations transferred to SBS Transit.
|-
|1 AM peak trip removed.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="4"|Punggol Rd → Marina Blvd (AM)<br>Central Blvd → Punggol Rd (PM)<br>(Jun 2020 - Nov 2024)
|2 June
|Resumed normal operations.
|-
|2021
|12 April
|Serves additional pair of bus stops before and after Jln Kayu along Sengkang West Ave.
|-
|2023
|27 March
|3rd AM peak trip added.
|-
|rowspan="2"|2024
|27 May
|4th and 5th AM peak trips added. 3rd and 4th PM peak trips added.
|-
!Punggol Rd → Raffles Blvd (AM)<br>Temasek Blvd → Punggol Rd (PM)<br>(since Nov 2024)
|11 November
|Extended to Raffles Blvd / Temasek Blvd via Bayfront Ave under the Bus Connectivity Enhancement Programme (BCEP).
|}
|}


==Service 672 {{WAB}}==
==Service 672 {{WAB}}==
{| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse"
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
|-class="BUS"
!Operator
!Operator
!Route
!Year
!Year
!Date
!Date
!Service changes
!Service changes
|-
|-
!{{Rui Feng Chartered}}
!rowspan="2"|{{Rui Feng Chartered}}
|'''2016'''
!rowspan="5"|Hougang St 51 → Marina Blvd (AM)<br>Central Blvd → Hougang St 51 (PM)<br>(2016 - Apr 2020)
|'''7 November'''
|2016
|Introduced between Hougang St 51 and Marina Blvd (AM Peak) and between Central Blvd and Hougang St 51 (PM Peak) as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|7 November
|Introduced between Hougang St 51 (Blk 568) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Hougang St 51 (Blk 574) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
|-
|2018
|25 June
|3rd AM peak trip added.
|-
|-
!{{SBS Transit}}<br>(Current)
!rowspan="8"|{{SBST}}<br>(Current)
|'''2020'''
|rowspan="6"|2020
|'''13 January'''
|rowspan="3"|13 January
|Operations transferred to SBS Transit.
|Operations transferred to SBS Transit.
|-
|1 AM peak trip removed.
|-
|{{DWAB}}
|-
!rowspan="2" {{N/A}}
|8 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
!rowspan="2"|Hougang St 51 → Marina Blvd (AM)<br>Central Blvd → Hougang St 51 (PM)<br>(Jun 2020 - Nov 2024)
|2 June
|Resumed normal operations.
|-
|rowspan="2"|2024
|27 May
|3rd and 4th AM peak trips added. 3rd PM peak trip added.
|-
!Hougang St 51 → Raffles Blvd (AM)<br>Temasek Blvd → Hougang St 51 (PM)<br>(since Nov 2024)
|11 November
|Extended to Raffles Blvd / Temasek Blvd via Bayfront Ave under the Bus Connectivity Enhancement Programme (BCEP).
|}
==Service 673 {{WAB}}==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
!Operator
!Route
!Year
!Date
!Service changes
|-
!{{GAS}}<br>(Current)
!Punggol Way → Temasek Blvd (AM)<br>Temasek Blvd → Punggol Way (PM)<br>(since Oct 2024)
|2024
|14 October
|Introduced between Punggol Way (Aft Punggol Pt Stn) and Temasek Blvd (Suntec Twr Two) during morning peak hours and between Temasek Blvd (Suntec Twr Three) and Punggol Way (Bef Punggol Pt Stn) during evening peak hours, operating as a peak hour one-directional service on weekdays under the LTA's Bus Connectivity Enhancement Programme (BCEP). Wheelchair-accessible at launch.
|}
==Service 674 {{WAB}}==
{| class="toccolours bushist" border="1" cellpadding="3"
|-class="BUS"
!Operator
!Route
!Year
!Date
!Service changes
|-
!{{TTS}}<br>(Current)
!Tengah Drive → Marina Blvd (AM)<br>Central Blvd → Tengah Drive (PM)<br>(since Nov 2024)
|2024
|25 November
|To be introduced between Tengah Drive (Blk 238) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Tengah Drive (Blk 324B) during evening peak hours, operating as a peak hour one-directional service on weekdays under the LTA's Bus Connectivity Enhancement Programme (BCEP). Wheelchair-accessible at launch.
|}
|}
[[Category: Buses]]

Latest revision as of 20:43, 11 November 2024

Service 651 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
ComfortDelGro Bus Jurong West Ave 3 → Marina Blvd (AM)
Central Blvd → Jurong West Ave 3 (PM)
(2013 - Apr 2020)
2013 2 September Introduced between Jurong West Ave 3 (Opp Blk 276B) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Aft Marina Stn Rd) and Jurong West Ave 3 (Blk 276B) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
1 December Serves new bus stop outside Downtown Stn along Central Blvd.
2015 23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
Rui Feng Chartered 2016 3 October Operations transferred to Rui Feng Chartered.
Tower Transit
(Current)
2020 13 January Operations transferred to Tower Transit Singapore.
Designated wheelchair-accessible bus service (WAB).
N/A 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Jurong West Ave 3 → Marina Blvd (AM)
Central Blvd → Jurong West Ave 3 (PM)
(since Jun 2020)
2 June Resumed normal operations.

Service 652 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Ren Quan Transport Upp Thomson Rd → Shenton Way (AM)
Anson Rd → Upp Thomson Rd (PM)
(2014 - Apr 2020)
2014 6 January Introduced between Upp Thomson Rd (Opp Sembawang Hills FC) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Upp Thomson Rd (Bef Sembawang Hills FC) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
17 March 3rd AM peak trip added.
14 July 4th AM peak trip added.
2015 19 January 5th AM peak trip added.
23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
2018 25 June 6th AM peak trip added.
SMRT Buses 2020 6 January Operations transferred to SMRT Buses.
2 AM peak trips removed.
Designated wheelchair-accessible bus service (WAB).
N/A 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Upp Thomson Rd → Shenton Way (AM)
Anson Rd → Upp Thomson Rd (PM)
(since Jun 2020)
2 June Resumed normal operations.
SBS Transit
(Current)
2021 6 September Operations transferred to SBS Transit.

Service 653 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
ComfortDelGro Bus Hume Ave → Marina Blvd (AM)
Central Blvd → Hillview Ave (PM)
(2014 - Apr 2020)
2014 13 January Introduced between Hume Ave (Bef Summerhill) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Aft Marina Stn Rd) and Hillview Ave (Hillington Green Condo) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
31 March 3rd AM peak trip added.
4 August 4th AM peak trip added.
2015 16 March 5th AM peak trip added.
23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
29 June 3rd PM peak trip added.
26 October 6th AM peak trip added.
SMRT Buses 2017 13 April Operations transferred to SMRT Buses.
2 AM peak trips and 1 PM peak trip removed.
Designated wheelchair-accessible bus service (WAB).
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Hume Ave → Marina Blvd (AM)
Central Blvd → Hillview Ave (PM)
(since Jun 2020)
2 June Resumed normal operations.
Tower Transit
(Current)
2021 31 May Operations transferred to Tower Transit Singapore.
2024 15 April 5th AM peak trip added.

Service 654 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Ren Quan Transport Anchorvale St → Shenton Way (AM)
Anson Rd → Anchorvale St (PM)
(2014 - Apr 2020)
2014 20 January Introduced between Anchorvale St (Blk 336B) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Anchorvale St (Blk 330) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
14 July 3rd AM peak trip added.
2015 23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
2 November 4th AM peak trip added.
2016 13 June 5th AM peak trip added.
BT & Tan Transport 2017 20 January Operations transferred to BT & Tan Transport Service.
2018 12 June 6th AM peak trip added. 3rd PM peak trip added.
SBS Transit
(Current)
2019 22 July Operations transferred to SBS Transit.
Designated wheelchair-accessible bus service (WAB).
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Anchorvale St → Shenton Way (AM)
Anson Rd → Anchorvale St (PM)
(Jun 2020 - Nov 2024)
2 June Resumed normal operations.
Anchorvale Cres → Shenton Way (AM)
Anson Rd → Anchorvale Cres (PM)
(since Nov 2024)
2024 11 November Extended to Anchorvale Cres under the LTA's Bus Connectivity Enhancement Programme (BCEP), with additional 2 morning trips and 1 evening trip.

Service 655 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Woodlands Transport West Coast Rd → Marina Blvd (AM)
Central Blvd → West Coast Rd (PM)
(2014 - Apr 2020)
2014 17 February Introduced between West Coast Rd (Bet Blks 50/51) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Aft Marina Stn Rd) and West Coast Rd (Opp Blk 51) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2015 23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
SBS Transit
(Current)
2017 17 April Operations transferred to SBS Transit.
21 August Designated wheelchair-accessible bus service (WAB).
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
West Coast Rd → Marina Blvd (AM)
Central Blvd → West Coast Rd (PM)
(since Jun 2020)
2 June Resumed normal operations.
2023 8 January Amended to ply realigned Teban Gdns Rd with the permanent partial closure of Teban Gdns Rd to facilitate the construction of Pandan Reservoir MRT station on the Jurong Region MRT Line.
9 October 3rd AM peak trip added.

Service 656 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Loh Gim Chong Transport Canberra Rd → Shenton Way (AM)
Anson Rd → Canberra Rd (PM)
(2014 - Apr 2020)
2014 17 February Introduced between Canberra Rd (Blk 424A CP) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Canberra Rd (Blk 508 CP) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
10 March 3rd AM peak trip added.
14 July 4th AM peak trip added.
2015 23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
SMRT Buses 2017 17 April Operations transferred to SMRT Buses.
1 AM peak trip removed.
Designated wheelchair-accessible bus service (WAB).
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Canberra Rd → Shenton Way (AM)
Anson Rd → Canberra Rd (PM)
(since Jun 2020)
2 June Resumed normal operations.
1 AM peak trip removed.
Tower Transit
(Current)
2021 3 October Operations transferred to Tower Transit Singapore.

Service 657 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Transtar Travel Jurong West Ave 1 → Marina Blvd (AM)
Central Blvd → West Coast Rd (PM)
(2014 - Apr 2020)
2014 24 February Introduced between Jurong West Ave 1 (Blk 538) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Aft Marina Stn Rd) and Jurong West Ave 1 (Blk 536) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2015 23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
SMRT Buses 2017 24 April Operations transferred to SMRT Buses.
Designated wheelchair-accessible bus service (WAB).
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Jurong West Ave 1 → Marina Blvd (AM)
Central Blvd → West Coast Rd (PM)
(since Jun 2020)
2 June Resumed normal operations.
Tower Transit
(Current)
2021 31 May Operations transferred to Tower Transit Singapore.

Service 658 (2014 - 2018)[edit]

Operator Year Date Service changes
Aedge 2014 19 May Introduced between Bedok Reservoir Rd (Blk 122) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Jln Damai (Opp Blk 668) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2015 23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
2016 25 April Amended to serve Jalan Tenaga instead of Jalan Damai due to reinstatement of Kaki Bt Ave 1.
2018 17 December Discontinued.

Service 659 (2014 - 2018)[edit]

Operator Year Date Service changes
Aedge 2014 9 June Introduced between Bedok Sth Rd (Opp Temasek JC) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Bedok Sth Rd (Temasek JC) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2015 19 January 3rd AM peak trip added.
23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
2018 17 December Discontinued.

Service 660 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Aedge Buangkok Green → Shenton Way (AM)
Anson Rd → Buangkok Green (PM)
(2014 - Apr 2020)
2014 23 June Introduced between Buangkok Green (Opp Blk 968) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Hub Synergy Pt) and Buangkok Green (Blk 969) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
1 September 3rd AM peak trip added.
2015 23 March Serves new staggered bus stop outside Mapletree Anson along Anson Rd, skipping the bus stop outside Hub Synergy Pt.
11 May 4th AM peak trip added.
2018 25 June 5th AM peak trip added.
SBS Transit
(Current)
2019 2 January Operations transferred to SBS Transit.
1 AM peak trip removed.
Designated wheelchair-accessible bus service (WAB).
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Buangkok Green → Shenton Way (AM)
Anson Rd → Buangkok Green (PM)
(since Jun 2020)
2 June Resumed normal operations.
2023 11 September 5th AM peak trip added.
26 December 6th and 7th AM peak trips added.

Service 660M Handicapped/disabled access[edit]

Operator Route Year Date Service changes
SBS Transit
(Current)
Buangkok Crescent → Shenton Way (AM)
Anson Rd → Buangkok Crescent (PM)
2024 11 November Introduced between Buangkok Cres (Blk 991A) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Mapletree Anson) and Buangkok Cres (Opp Blk 991A) during evening peak hours, operating as a peak hour one-directional supplementary service on weekdays under the LTA's Bus Connectivity Enhancement Programme (BCEP). Wheelchair-accessible at launch.

Service 661 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Aedge Pasir Ris Dr 3 → Marina Blvd (AM)
Central Blvd → Pasir Ris Dr 3 (PM)
(2015 - Apr 2020)
2015 22 September Introduced between Pasir Ris Dr 3 (Blk 479) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Pasir Ris Dr 3 (Opp Blk 479) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2016 25 July 3rd AM peak trip added.
Go-Ahead
(Current)
2019 2 January Operations transferred to Go-Ahead Singapore.
1 AM peak trip removed.
Designated wheelchair-accessible bus service (WAB).
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Pasir Ris Dr 3 → Marina Blvd (AM)
Central Blvd → Pasir Ris Dr 3 (PM)
(Jun 2020 - 2021)
2 June Resumed normal operations.
N/A 2021 15 September Temporarily suspended due to the impact of COVID-19 on available manpower.
Pasir Ris Dr 3 → Marina Blvd (AM)
Central Blvd → Pasir Ris Dr 3 (PM)
(since 2022)
2022 3 February Resumed normal operations.

Service 662 (2015 - 2018)[edit]

Operator Year Date Service changes
Aedge 2015 22 September Introduced between Choa Chu Kang Nth 7 (Blk 619) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Choa Chu Kang Nth 7 (Regent Gr Condo) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2018 17 December Discontinued.

Service 663 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Bus Hub Service Yishun Ave 6 → Shenton Way (AM)
Anson Rd → Yishun Ave 6 (PM)
(2015 - Apr 2020)
2015 28 September Introduced between Yishun Ave 6 (Bet Blks 405/406) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Mapletree Anson) and Yishun Ave 6 (Opp Blk 406) during evening peak hours, operating 4 trips in the morning and 2 trips in the evening as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
Tower Transit
(Current)
2017 28 September Operations transferred to Tower Transit Singapore.
1 AM peak trip removed.
Designated wheelchair-accessible bus service (WAB).
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Yishun Ave 6 → Shenton Way (AM)
Anson Rd → Yishun Ave 6 (PM)
(since Jun 2020)
2 June Resumed normal operations.
2021 26 April Serves new bus stop outside Blk 382C along Yishun Ave 6.
2022 26 September Serves new bus stop opposite Blk 382C along Yishun Ave 6.
2023 28 August 4th AM peak trip added.

Service 664 (2015 - 2018)[edit]

Operator Year Date Service changes
Aedge 2015 6 October Introduced between Tampines St 41 (Blk 417) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Tampines St 41 (Blk 418) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2018 17 December Discontinued.

Service 665 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Bus Hub Service Marsiling Dr → Shenton Way (AM)
Anson Rd → Marsiling Dr (PM)
(2015 - Apr 2020)
2015 12 October Introduced between Marsiling Dr (Blk 32) and Shenton Way (Opp MAS Bldg) during morning peak hours and between Anson Rd (Mapletree Anson) and Marsiling Dr (Blk 203) during evening peak hours, operating 5 trips in the morning and 2 trips in the evening as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2016 4 January 6th AM peak trip added.
Tower Transit 2017 12 October Operations transferred to Tower Transit Singapore.
Designated wheelchair-accessible bus service (WAB).
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Marsiling Dr → Shenton Way (AM)
Anson Rd → Marsiling Dr (PM)
(since Jun 2020)
2 June Resumed normal operations.
SMRT Buses
(Current)
2021 31 May Operations transferred to SMRT Buses.
2023 29 May 1 AM peak trip removed.

Service 666 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
BT & Tan Transport Punggol Dr → Marina Blvd (AM)
Central Blvd → Punggol Dr (PM)
(2016 - Apr 2020)
2016 29 February Introduced between Punggol Dr (Opp Blk 612A) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Punggol Dr (Blk 612A) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
Go-Ahead
(Current)
2020 2 March Operations transferred to Go-Ahead Singapore.
Designated wheelchair-accessible bus service (WAB).
N/A 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Punggol Dr → Marina Blvd (AM)
Central Blvd → Punggol Dr (PM)
(Jun 2020 - 2021)
2 June Resumed normal operations.
N/A 2021 15 September Temporarily suspended due to the impact of COVID-19 on available manpower.
Punggol Dr → Marina Blvd (AM)
Central Blvd → Punggol Dr (PM)
(2022 - Nov 2024)
2022 3 February Resumed normal operations.
Punggol Dr → Raffles Blvd (AM)
Temasek Blvd → Punggol Dr (PM)
(since Nov 2024)
2024 25 November To be extended to Raffles Blvd / Temasek Blvd via Bayfront Ave under the Bus Connectivity Enhancement Programme (BCEP), with additional 1 morning trip.

Service 667 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Tong Tar Transport Service Clementi Ave 4 → Marina Blvd (AM)
Central Blvd → Clementi Ave 4 (PM)
(2016 - Apr 2020)
2016 8 March Introduced between Clementi Ave 4 (Blk 308) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Clementi Ave 4 (Blk 308) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
SBS Transit
(Current)
2020 9 March Operations transferred to SBS Transit.
Designated wheelchair-accessible bus service (WAB).
N/A 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Clementi Ave 4 → Marina Blvd (AM)
Central Blvd → Clementi Ave 4 (PM)
(since Jun 2020)
2 June Resumed normal operations.

Service 668 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
BT & Tan Transport Ang Mo Kio Ave 5 → Marina Blvd (AM)
Central Blvd → Ang Mo Kio Ave 5 (PM)
(2016 - Apr 2020)
2016 15 March Introduced between Ang Mo Kio Ave 5 (Opp Blk 649) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Ang Mo Kio Ave 5 (Blk 649) during evening peak hours, operating 3 trips in the morning and 2 trips in the evening as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2018 25 June 4th AM peak trip added.
N/A 2020 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Ang Mo Kio Ave 5 → Marina Blvd (AM)
Central Blvd → Ang Mo Kio Ave 5 (PM)
(since Jun 2020)
2 June Resumed normal operations.
SBS Transit
(Current)
14 December Operations transferred to SBS Transit.
Designated wheelchair-accessible bus service (WAB).

Service 669 (2016 - 2019)[edit]

Operator Year Date Service changes
Tong Tar Transport Service 2016 22 March Introduced between Bedok Nth Rd (Bedok Nth Stn Exit A) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Bedok Nth Rd (Bet Blks 705/706) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2019 3 June Discontinued.

Service 670 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Tong Tar Transport Service Yishun Ave 7 → Marina Blvd (AM)
Central Blvd → Yishun Ave 7 (PM)
(2016 - Apr 2020)
2016 29 March Introduced between Yishun Ave 7 (Opp Blk 288) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Yishun Ave 7 (Blk 289) during evening peak hours, operating 3 trips in the morning and 2 trips in the evening as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
SMRT Buses 2020 30 March Operations transferred to SMRT Buses.
1 AM peak trip removed.
Designated wheelchair-accessible bus service (WAB).
N/A 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Yishun Ave 7 → Marina Blvd (AM)
Central Blvd → Yishun Ave 7 (PM)
(since Jun 2020)
2 June Resumed normal operations.
Tower Transit
(Current)
2021 5 September Operations transferred to Tower Transit Singapore.

Service 671 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Rui Feng Chartered Punggol Rd → Marina Blvd (AM)
Central Blvd → Punggol Rd (PM)
(2016 - Apr 2020)
2016 17 October Introduced between Punggol Rd (Opp The Rivervale) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Punggol Rd (The Rivervale) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2018 25 June 3rd AM peak trip added.
SBS Transit
(Current)
2020 13 January Operations transferred to SBS Transit.
1 AM peak trip removed.
Designated wheelchair-accessible bus service (WAB).
N/A 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Punggol Rd → Marina Blvd (AM)
Central Blvd → Punggol Rd (PM)
(Jun 2020 - Nov 2024)
2 June Resumed normal operations.
2021 12 April Serves additional pair of bus stops before and after Jln Kayu along Sengkang West Ave.
2023 27 March 3rd AM peak trip added.
2024 27 May 4th and 5th AM peak trips added. 3rd and 4th PM peak trips added.
Punggol Rd → Raffles Blvd (AM)
Temasek Blvd → Punggol Rd (PM)
(since Nov 2024)
11 November Extended to Raffles Blvd / Temasek Blvd via Bayfront Ave under the Bus Connectivity Enhancement Programme (BCEP).

Service 672 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Rui Feng Chartered Hougang St 51 → Marina Blvd (AM)
Central Blvd → Hougang St 51 (PM)
(2016 - Apr 2020)
2016 7 November Introduced between Hougang St 51 (Blk 568) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Hougang St 51 (Blk 574) during evening peak hours, operating 2 trips in each direction as a peak hour one-directional service on weekdays under the LTA's Bus Service Enhancement Programme (BSEP).
2018 25 June 3rd AM peak trip added.
SBS Transit
(Current)
2020 13 January Operations transferred to SBS Transit.
1 AM peak trip removed.
Designated wheelchair-accessible bus service (WAB).
N/A 8 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
Hougang St 51 → Marina Blvd (AM)
Central Blvd → Hougang St 51 (PM)
(Jun 2020 - Nov 2024)
2 June Resumed normal operations.
2024 27 May 3rd and 4th AM peak trips added. 3rd PM peak trip added.
Hougang St 51 → Raffles Blvd (AM)
Temasek Blvd → Hougang St 51 (PM)
(since Nov 2024)
11 November Extended to Raffles Blvd / Temasek Blvd via Bayfront Ave under the Bus Connectivity Enhancement Programme (BCEP).

Service 673 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Go-Ahead
(Current)
Punggol Way → Temasek Blvd (AM)
Temasek Blvd → Punggol Way (PM)
(since Oct 2024)
2024 14 October Introduced between Punggol Way (Aft Punggol Pt Stn) and Temasek Blvd (Suntec Twr Two) during morning peak hours and between Temasek Blvd (Suntec Twr Three) and Punggol Way (Bef Punggol Pt Stn) during evening peak hours, operating as a peak hour one-directional service on weekdays under the LTA's Bus Connectivity Enhancement Programme (BCEP). Wheelchair-accessible at launch.

Service 674 Handicapped/disabled access[edit]

Operator Route Year Date Service changes
Tower Transit
(Current)
Tengah Drive → Marina Blvd (AM)
Central Blvd → Tengah Drive (PM)
(since Nov 2024)
2024 25 November To be introduced between Tengah Drive (Blk 238) and Marina Blvd (Marina Bay Financial Ctr) during morning peak hours and between Central Blvd (Marina Bay Stn) and Tengah Drive (Blk 324B) during evening peak hours, operating as a peak hour one-directional service on weekdays under the LTA's Bus Connectivity Enhancement Programme (BCEP). Wheelchair-accessible at launch.