Difference between revisions of "Mass Rapid Transit"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
: Circle line has continued its construction after the restoration of Nicoll Highway | : Circle line has continued its construction after the restoration of Nicoll Highway | ||
: Downtown Extension line will start its construction in 2007. Stations built: Chinatown, Cross Street, Landmark, Integrated Resort and Milliena | : Downtown Extension line will start its construction in 2007. Stations built: Chinatown, Cross Street, Landmark, Integrated Resort and Milliena | ||
*More information can be found at mrts.sgforums.com too* | |||
== Getting around == | == Getting around == |
Revision as of 21:19, 27 August 2005
The Mass Rapid Transit
- The MRT system consists of three inter-connected rail systems, namely the North-South line, the East-West line, and the newest North-East line. The North-South and East-West lines are operated by the SMRT Corporation, whereas the newer North-East line is operated by SBSTransit.
- There is also another line currently under construction (The Circle Line). However, due to the recent Nicoll Highway collapse, work is temporarily halted.
- Inquiry of the collapse has started and restoration work of Nicoll Highway has begun
- Circle line has continued its construction after the restoration of Nicoll Highway
- Downtown Extension line will start its construction in 2007. Stations built: Chinatown, Cross Street, Landmark, Integrated Resort and Milliena
- More information can be found at mrts.sgforums.com too*
Getting around
- The MRT system boasts a seamless payment method, through the EZ-link card system. With a unified payment method, operators offer various rebates for transfers between the rail and bus systems.
And how much to get around Singapore by MRT?
Page edited by: 1) Pkchukiss 23:24, 12 Sep 2004 (SGT)