Difference between revisions of "History of Chinatown Direct Services"

From SgWiki
Jump to navigation Jump to search
(Update)
Line 18: Line 18:
|'''2018'''
|'''2018'''
|'''10 March'''
|'''10 March'''
|To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
|Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
|}
|}


Line 44: Line 44:
|'''2018'''
|'''2018'''
|'''10 March'''
|'''10 March'''
|To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
|Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
|}
|}



Revision as of 13:00, 10 March 2018

Service CT8

Operator Year Date Service changes
Template:SBS Transit
(Current)
2005 21 January Introduced between Ang Mo Kio Ave 9 and New Bridge Rd Ter.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.

Service CT18

Operator Year Date Service changes
Template:SBS Transit
(Current)
2005 21 January Introduced between Bedok North Ave 3 and New Bridge Rd Ter.
2006 TBC Skips a pair of bus stops outside and opposite Bedok Green Sec Sch along Bedok North Ave 3 to facilitate the construction of Bedok Reservoir Flyover.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.

Service CT28

Operator Year Date Service changes
Template:SBS Transit 2005 21 January Introduced between New Bridge Rd Ter and Clementi Ave 4 (loop).
2008 21 July Revised to operate during the pre-Chinese New Year period only.
2016 28 March Designated wheelchair-accessible bus service (WAB).
2017 7 January Withdrawn.