History of Chinatown Direct Services
Service CT8
Operator | Year | Date | Service changes |
---|---|---|---|
Template:SBS Transit (Current) |
2005 | 21 January | Introduced between Ang Mo Kio Ave 9 and New Bridge Rd Ter. |
2014 | 3 December | Designated wheelchair-accessible bus service (WAB). | |
2018 | 10 March | To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter. |
Service CT18
Operator | Year | Date | Service changes |
---|---|---|---|
Template:SBS Transit (Current) |
2005 | 21 January | Introduced between Bedok North Ave 3 and New Bridge Rd Ter. |
2006 | TBC | Skips a pair of bus stops outside and opposite Bedok Green Sec Sch along Bedok North Ave 3 to facilitate the construction of Bedok Reservoir Flyover. | |
2014 | 3 December | Designated wheelchair-accessible bus service (WAB). | |
2018 | 10 March | To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter. |
Service CT28
Operator | Year | Date | Service changes |
---|---|---|---|
Template:SBS Transit | 2005 | 21 January | Introduced between New Bridge Rd Ter and Clementi Ave 4 (loop). |
2008 | 21 July | Revised to operate during the pre-Chinese New Year period only. | |
2016 | 28 March | Designated wheelchair-accessible bus service (WAB). | |
2017 | 7 January | Withdrawn. |