User talk:Supernutorcrazy

From SgWiki
Jump to navigation Jump to search

Rules for my feedback to stop irritate me.

  • Please kindly wait for up to 7 days unless stated otherwise for my reply to your feedback. No reply will be given if your feedback does not require reply or I could not answer to your feedback.
  • Please do not ask for general question like How to etc.
  • Please do not ask for permission to do something.
  • Please refrain from requesting to retrieved deleted article as excessive history will be cleared.
  • When requesting me to edit locked pages, please give either
    • Affected sections code
    • Advertisement in full
    • Affected parts to change in details.
    • Avoid statement like same as other vehicle
  • Please kindly indicate Autoblock ID if you have been affected from it.
  • I will not entertain any request under BCM transition.

Leave your message below

Rail Wiki Expansion

Hi Supernutorcrazy,

Is it OK to add info of train deployments (including TRNs and their sequences), acronyms legend and train fleet info (similar to what's done for buses)?
Data can be obtained from here: https://docs.google.com/document/d/1PMuCeF31etWzPv_U42qMaFoHvYwDpnkSWHgjvuuTxdg/edit
All data collated in the above document are based on spottings and observations from fellow enthusiasts.

I hope you will support us to make these valuable information more accessible to all. Thank you.


Map progress /Alternative Travel Method Upgrades

Noted with the updated travelling time and the new MRT waiting times. I shall resume with the travelling time updates for alternative travel pages and reflect as much accuracy as possible. Thank you so much for the dedication!

On a side note, I have identified 40 existing stations for map upgrading to newer editions. Majority of these stations vary from complexity in navigation, to missing bus stop details, while the minority is just to upgrade as a batch of consecutive stations. I have also put in some notes on what can be modified as side reference on my user page. By the time this phase is completed, this would fulfill the target of having half of the total stations with upgraded maps. I will see what I can do to speed up this process while fulfilling quality at the same time.

The finalised Expo map (with details corrected) will be my sample reference on the new specifications to look out for when I work on the rest.

Thanks and Regards

Reply: Fleet Size of 912

Hi.

I will leave the fleet size as 4 for now. As far as I know they only have 4 buses scheduled with 5 AP duties every day.