History of Chinatown Direct Services

From SgWiki
Revision as of 16:07, 13 February 2018 by SBS3107H (talk | contribs) (Update)
Jump to navigation Jump to search

Service CT8

Operator Year Date Service changes
Template:SBS Transit
(Current)
2005 21 January Introduced between Ang Mo Kio Ave 9 and New Bridge Rd Ter.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter and to call at additional bus stops before Neil Rd along New Bridge Rd, before Kg Bahru Ter and opposite Kg Bahru Ter along Kg Bahru Rd.

Service CT18

Operator Year Date Service changes
Template:SBS Transit
(Current)
2005 21 January Introduced between Bedok North Ave 3 and New Bridge Rd Ter.
2006 TBC Skips a pair of bus stops outside and opposite Bedok Green Sec Sch along Bedok North Ave 3 to facilitate the construction of Bedok Reservoir Flyover.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter and to call at additional bus stops before Neil Rd along New Bridge Rd, before Kg Bahru Ter and opposite Kg Bahru Ter along Kg Bahru Rd.

Service CT28

Operator Year Date Service changes
Template:SBS Transit 2005 21 January Introduced between New Bridge Rd Ter and Clementi Ave 4 (loop).
2008 21 July Revised to operate during the pre-Chinese New Year period only.
2016 28 March Designated wheelchair-accessible bus service (WAB).
2017 7 January Withdrawn.