History of Chinatown Direct Services
Jump to navigation
Jump to search
Service CT8
Operator | Year | Date | Service changes |
---|---|---|---|
Template:SBS Transit (Current) |
2005 | 21 January | Introduced between Ang Mo Kio Ave 9 and New Bridge Rd Ter. |
2014 | 3 December | Designated wheelchair-accessible bus service (WAB). | |
2018 | 10 March | To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter and to call at additional bus stops before Neil Rd along New Bridge Rd, before Kg Bahru Ter and opposite Kg Bahru Ter along Kg Bahru Rd. |
Service CT18
Operator | Year | Date | Service changes |
---|---|---|---|
Template:SBS Transit (Current) |
2005 | 21 January | Introduced between Bedok North Ave 3 and New Bridge Rd Ter. |
2006 | TBC | Skips a pair of bus stops outside and opposite Bedok Green Sec Sch along Bedok North Ave 3 to facilitate the construction of Bedok Reservoir Flyover. | |
2014 | 3 December | Designated wheelchair-accessible bus service (WAB). | |
2018 | 10 March | To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter and to call at additional bus stops before Neil Rd along New Bridge Rd, before Kg Bahru Ter and opposite Kg Bahru Ter along Kg Bahru Rd. |
Service CT28
Operator | Year | Date | Service changes |
---|---|---|---|
Template:SBS Transit | 2005 | 21 January | Introduced between New Bridge Rd Ter and Clementi Ave 4 (loop). |
2008 | 21 July | Revised to operate during the pre-Chinese New Year period only. | |
2016 | 28 March | Designated wheelchair-accessible bus service (WAB). | |
2017 | 7 January | Withdrawn. |