!
|
TRAVEL ADVISORY
|
!
|
- From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.
- From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
- Please refer
- here for more information on the adjustments.
- here for Shuttle Bus and Train arrangements.
- here for the work map.
- From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
- Please refer here for more information.
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
- From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.
- From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.
- From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
- Please refer to the following for more information.
- From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.
- From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.
|
|
Sentosa Express 圣淘沙捷运 செந்தோசா எக்ஸ்பிரஸ்
|
|
|
Statistics
|
Status
|
Operational
|
Termini
|
Sentosa Beach
|
Stations
|
4
|
Services
|
1
|
Operator(s)
|
Sentosa Development Corporation
|
Rolling stock
|
Hitachi small-type monorail (Sentosa Express)
|
Line length
|
2.1 km
|
Sentosa Express is a monorail line connecting to Sentosa island. This line was opened on 15 January 2007 and replaces the former Sentosa Monorail which has been used from 1982 to 2005. And this monorail line connects to VivoCity which is located near HarbourFront.
Features
This line features Platform Screen Doors at all stations to provide safety. And this is the first line in Singapore to use Half Height Platform Screen Doors to provide safety at all stations.
Stations
Rolling Stock
The rolling stock for Sentosa Express is Hitachi Monorail which is in two-car configuration and the passengers can fit to 148 passengers. There are 7 colours for this rolling stock: Green, Blue, Purple, Orange, Pink, Red and Yellow. Compare to old Sentosa Monorail, the train goes faster and got air conditioned trains compare to Old Monorail goes slow and no air conditioned which can cause passengers to feel uncomfortable. But at every stations, during peak hours, the staffs are being forced to all passengers to board that train instead of waiting for the next train.
References