Sentosa Express

From SgWiki
Jump to: navigation, search


!
TRAVEL ADVISORY
!
SMRT North South Line: Train service between Jurong East and Woodlands stations will start at 8am. Shuttle bus service is available. Please refer here for more information.
SMRT North South Line: Train service between Jurong East and Kranji stations will end at 11pm. Shuttle bus service is available. Certain bus service will be extended to coincide with the last bus timing. Please refer here for more information.
SBS Transit: From 25 August 2019, Bus Service 101 will be amended to ply Buangkok Crescent. Please refer here for more information.
SMRT Buses: From 8 September 2019, Bus Services 171, 853, 854, 854e, 855, 856, 857, 859 will be amended to serve Yishun Integrated Transport Hub instead of Yishun Temp Int. Please refer here for more information.
SMRT Buses: From 8 September 2019, Bus Service 853 (Sunday and Public Holiday) will be renumbered as 853M. Please refer here for more information.
SBS Transit: From 8 September 2019, Bus Services 39, 103, 800, 803, 804, 811, 812, 851, 851e, 852, 860 will be amended to serve Yishun Integrated Transport Hub instead of Yishun Temp Int. Please refer here for more information.
Go-Ahead: From 8 September 2019, Bus Service 85 will be amended to serve Yishun Integrated Transport Hub instead of Yishun Temp Int. Please refer here for more information.
SMRT Buses: From 8 September 2019, Bus Service 925 (Sunday and Public Holiday) will be renumbered as 925M. Please refer here for more information.
SMRT Buses: From 8 September 2019, Bus Service 961 (Sunday and Public Holiday) will be renumbered as 961M. Please refer here for more information.
SMRT North South Line: Canberra MRT station will commence operation on 2 November 2019. Please refer here for more information.
Sentosa Express
圣淘沙捷运
செந்தோசா எக்ஸ்பிரஸ்
Statistics
Status Operational
Termini VivoCity
Beach
Stations 4
Services 1
Operator(s) Sentosa Development Corporation
Rolling stock Hitachi small-type monorail (Sentosa Express)
Line length 2.1 km

Sentosa Express is a monorail line connecting to Sentosa island. This line was opened on 15 January 2007 and replaces the former Sentosa Monorail which has been used from 1982 to 2005. And this monorail line connects to VivoCity which is located near HarbourFront.

Features

This line features Platform Screen Doors at all stations to provide safety. And this is the first line in Singapore to use Half Height Platform Screen Doors to provide safety at all stations.

Stations

Alpha-Numeric
Code
Station Name Notes
Sentosa Express
S1 VivoCity Terminus (linked to NE1CC29 HarbourFront)
S2 Resorts World
S3 Imbiah
S4 Beach Terminus

Rolling Stock

The rolling stock for Sentosa Express is Hitachi Monorail which is in two-car configuration and the passengers can fit to 148 passengers. There are 7 colours for this rolling stock: Green, Blue, Purple, Orange, Pink, Red and Yellow. Compare to old Sentosa Monorail, the train goes faster and got air conditioned trains compare to Old Monorail goes slow and no air conditioned which can cause passengers to feel uncomfortable. But at every stations, during peak hours, the staffs are being forced to all passengers to board that train instead of waiting for the next train.

References


Sentosa Express [ VTE ]
Stations VivoCityResorts WorldImbiahBeach
Rolling Stock Hitachi Monorail