!
|
TRAVEL ADVISORY
|
!
|
- Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.
- To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.
- Due to upgrading works at Boon Lay Interchange, from Sunday, 26 May 2024,
- Bus service
79 will be amended to start from Jurong Town Hall Int and loop at Boon Lay Int via Jurong West St 64.
- Bus service
252 will be amended to enter Boon Lay Int via Jurong West St 64.
- Please refer to the following for more information.
- From Monday, 27 May 2024, City Direct services
671 & 672 will operate additional morning & evening trips. Please refer here for more information.
- From Monday, 27 May 2024, The first bus timing for service
27 from the following bus stops will be brought forward on Weekdays to the following timings:
- The first bus timing from Hougang Central Interchange will be brought forward to 0510hrs on Weekdays.
- The first bus timing from Sengkang East Ave (B/S 67261 (Blk 203B)) will be brought forwards to 0500hrs on Weekdays.
- Please refer here for more information.
- From Monday, 27 May 2024, Express service
43e will call at additional bus stops along Buangkok Drive and Airport Road to better serve commuters’ travel needs. The first bus during both morning and evening peak periods will be brought forward by 10 minutes, and frequency will be improved from 20 – 30 minutes to 15 – 20 minutes. Please refer here for more information
- From Monday, 27 May 2024, short trip services
20A , 39A & 39B will be introduced.
- Short Trip
20A will start from Simei St 1 (B/S 96139 (Blk 148)) and will terminate at Changi Sth Ave 1 (B/S 96301 (Expo Stn Exit B)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
- Short Trip
39A will start from Pasir Ris Ctrl (B/S 77031 (Opp Pasir Ris Stn Exit B)) and will terminate at Jln Kayu (B/S 68119 (Aft Seletar Camp G)). It only operates on Weekdays (except Public Holidays) during morning & evening peak hours.
- Short Trip
39B will start from Punggol Way (B/S 65439 (Blk 220C)) and will terminate at Pasir Ris Ctrl (B/S 77039 (Pasir Ris Stn Exit B)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
- Please refer here for more information.
- From Monday, 27 May 2024, The first bus timing for service
39 from Tampines Concourse Interchange will be brought forward to 0525hrs on Weekdays. Please refer here for more information.
|
Changi Airport, (IATA: SIN, ICAO: WSSS), is a major civilian airport and is one of the largest transportation hubs in Asia. It is currently rated the World's Best Airport by Skytrax for the eighth consecutive year since 2013.[1] It is the first Airport in the world to do so for eight consecutive years, and is one of the world's busiest airports by international passenger and cargo traffic. The airport is operated by Changi Airport Group and it is the home base of Singapore Airlines (and its subsidiaries) and Jetstar Asia Airways.
Skytrain
All Skytrain stations are located on L2 (Departure Hall). All stations within the same terminal are within walking distance. Stations between different terminals are within walking distance in Transit area only.
Station A
L2
|
Terminal 3
|
Departure Transit
|
Transit Platform
|
|
|
Transit Platform
|
Station A (South)
L2
|
Terminal 3
|
Departure Transit
|
Transit Platform
|
|
Station B
L2
|
Terminal 3
|
Departure Transit
|
|
Transit Platform
|
|
Public Platform
|
|
Terminal 2
|
Departure Hall
|
Station C
L2
|
Terminal 1
|
Departure Transit
|
Transit Platform
|
|
Service Area
|
Depot
|
|
Public Platform
|
Terminal 1
|
Departure Hall
|
Station D
L2
|
|
Public Platform
|
Terminal 1
|
Departure Hall/Departure Transit
|
Transit Platform
|
|
Station E
L2
|
Terminal 2
|
Departure Hall
|
Public Platform
|
|
Transit Platform
|
|
Terminal 2
|
Departure Hall
|
Station F
L2
|
|
Transit Platform
|
Terminal 2
|
Departure Transit
|
Bus Terminal
Bus Stop |
Terminal |
Bus Service
|
Changi Airport Ter 1 95029 PTB1 Basement |
1
|
24 27 34 36 53 110 858
|
Changi Airport Ter 3 95109 PTB3 Basement |
3
|
24 27 34 36 53 110 858
|
Changi Airport Ter 2 95129 PTB2 Basement |
2
|
24 27 34 36 53 110 858
|
Changi Airport Ter 4 95209 T4 Cres |
4
|
24 34 36 110
|
References