Adtranz 801

From SgWiki
Revision as of 14:38, 23 November 2010 by Joeyfjj (talk | contribs) (Bombardier CX-100 moved to Bombardier Innovia APM 100: Revised name by Bombardier: refer to http://www.bombardier.com/en/transportation/products-services/transportation-systems/driverless-systems/automated-people-movers/bukit-panjang--singapore?do)
Jump to navigation Jump to search
File:SLRT.JPG
Arriving Bukit Panjang Station. Photo by SN Yuen.
  • Length of train: 12.8m
  • Width of train: 2.8m
  • Height of train: 3.4m
  • Unladen weight: 15,000kg
  • Capacity: 105 (22 seating, 83 standing)
  • Maximum Speed: 55 km/h
  • Average Speed: 26 km/h
  • Track Gauge: Central guideway with rubber tyres
  • In service: 1990 - March 2006 (Changi Airport Skytrain), 6/11/1999 - Current (Bukit Panjang LRT)
  • Line(s) Served: Bukit Panjang LRT, Changi Airport Skytrain (former)

Fleet

Set 101 to 119

101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119

Random Overhead Ads

Bejing 101

Related Articles

LRT Rolling Stock