Difference between revisions of "History of Chinatown Direct Services"

From SgWiki
Jump to navigation Jump to search
Line 44: Line 44:
|'''2018'''
|'''2018'''
|'''10 March'''
|'''10 March'''
|To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter and to call at additional bus stops before Neil Rd along New Bridge Rd, before Kg Bahru Ter and opposite Kg Bahru Ter along Kg Bahru Rd.
|To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
|}
|}



Revision as of 14:52, 3 March 2018

Service CT8

Operator Year Date Service changes
SBS Transit
(Current)
2005 21 January Introduced between Ang Mo Kio Ave 9 and New Bridge Rd Ter.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.

Service CT18

Operator Year Date Service changes
SBS Transit
(Current)
2005 21 January Introduced between Bedok North Ave 3 and New Bridge Rd Ter.
2006 TBC Skips a pair of bus stops outside and opposite Bedok Green Sec Sch along Bedok North Ave 3 to facilitate the construction of Bedok Reservoir Flyover.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March To be extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.

Service CT28

Operator Year Date Service changes
SBS Transit 2005 21 January Introduced between New Bridge Rd Ter and Clementi Ave 4 (loop).
2008 21 July Revised to operate during the pre-Chinese New Year period only.
2016 28 March Designated wheelchair-accessible bus service (WAB).
2017 7 January Withdrawn.