Difference between revisions of "History of Chinatown Direct Services"

From SgWiki
Jump to navigation Jump to search
Line 50: Line 50:
|2018
|2018
|10 March
|10 March
|Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter ([[https://www.google.com/maps/dir/Blk+403/Opp+Blk+646/Chinatown+Pt/Jalan+Bukit+Merah,+Kampong+Bahru+Bus+Interchange/@1.3027238,103.8459608,13z/data=!4m31!4m30!1m10!1m1!1s0x31da3d4bcc4e04fd:0x9d60040bcf660130!2m2!1d103.9344848!2d1.3300324!3m4!1m2!1d103.9329134!2d1.3377819!3s0x31da3d466209f68f:0xb0af93755994d6f0!1m5!1m1!1s0x31da17fbd8874651:0xd363038bc0f4124b!2m2!1d103.9066246!2d1.330853!1m5!1m1!1s0x31da1974b4436763:0x3368243cefa5db2b!2m2!1d103.844551!2d1.285311!1m5!1m1!1s0x31da1965f01f6e0f:0x67a79682a2a6a732!2m2!1d103.832666!2d1.2760544!3e0|Map]])
|Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter  
|-
|-
|rowspan="3"|2020
|rowspan="3"|2020

Revision as of 22:02, 3 April 2021

Service CT8 Handicapped/disabled access

Operator Year Date Service changes
SBS Transit
(Current)
2005 21 January Introduced between Ang Mo Kio Ave 9 (Opp Ang Mo Kio Comm Hosp) and New Bridge Rd Ter.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
2020 15 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
2 June Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until further notice.

Service CT18 Handicapped/disabled access

Operator Year Date Service changes
SBS Transit
(Current)
2005 21 January Introduced between Bedok North Ave 3 (Blk 403) and New Bridge Rd Ter.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter
2020 15 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
2 June Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until further notice.

Service CT28 Handicapped/disabled access

Operator Year Date Service changes
SBS Transit 2005 21 January Introduced between New Bridge Rd Ter and Clementi Ave 4 (Loop).
2008 21 July Revised to operate during the pre-Chinese New Year period only.
2016 28 March Designated wheelchair-accessible bus service (WAB).
1 September Withdrawn.