Difference between revisions of "North East Line Bus Rationalisation"

From SgWiki
Jump to navigation Jump to search
(admin pls block the user)
Line 35: Line 35:
!rowspan="9"|27 July 2003
!rowspan="9"|27 July 2003
!81
!81
|Extended to Bukit Merah Interchange from Tampines Interchange
|Cutback to terminate at Serangoon Int from Tampines Int.
|-
|-
!85
!85
|Re-routed to start from Punggol and end at Yishun
|Withdrawn.
|-
|-
!97
!97
|Stays the same
|Cutback to loop at Temasek Blvd from Jurong East Int.
|-
|-
!106
!106
|Stays the same
|Cutback to loop at Temasek Blvd from Bukit Batok Int.
|-
|-
!111
!111
|Stays the same
|Cutback to loop at Temasek Blvd from Ghim Moh Ter.
|-
|-
!501
!501/501#
|Re-routed to start from Boon Lay and end at Shenton Way, replacing Service 502's Orchard Road - Suntec City sector
|Withdrawn.
|-
|-
!502
!502
|Stays the same
|Cutback to loop at Temasek Blvd from Boon Lay Int.
|-
|-
!511
!511
|Re-routed to start from Boon Lay and end at Punggol
|Withdrawn.
|-
|-
!512
!512
|Re-routed to start from Jurong East Interchange and end at Marina Centre
|Withdrawn.
|-
|-
!rowspan="2"|3
!rowspan="2"|3
Line 71: Line 71:
!rowspan="6"|7 December 2003
!rowspan="6"|7 December 2003
!62
!62
|Extended to Punggol Temp Int and Bukit Merah Interchange
|Extended to Punggol Temp Int and re-routed to loop at Lor 1 Geylang.
|-
|-
!82
!82
|Extended to Jurong East Interchange and re-routed to start from Punggol Interchange
|Shortened to Serangoon Int and re-routed to start from Serangoon Int and loop at Punggol Rd End.
|-
|-
!103
!103
|Extended to Jurong East Interchange and re-routed to start from Yishun interchange
|Shortened to Serangoon Int and extended to loop at Piccadilly, replacing Feeder Service 378.
|-
|-
 
!103W
|New service, replacing Feeder Service 379.
|-
!378
|Withdrawn.
|-
!379
|Withdrawn.
|}


[[Category: Buses]]
[[Category: Buses]]

Revision as of 16:05, 1 November 2015

Introduction

In conjunction with the opening of the North-East MRT Line, the existing bus service network in the North-East corridor was rationalised to reduce route duplication and to complement the MRT system within the period between June and December 2003.

Service changes

Phase Implementation date Service Service changes
1 21 June 2003 21 Amended to serve Farrer Park Stn via Jln Besar, Kitchener Rd and Serangoon Rd in the direction of St Michael's Ter.
125
22 Amended to serve Serangoon Stn via Serangoon Ctrl and Upp Serangoon Rd.
53
70
72 Amended to serve Hougang Stn via Hougang Ctrl.
130 Amended to serve Boon Keng Stn via Serangoon Rd, Boon Keng Rd and Bendemeer Rd.
139
2 27 July 2003 81 Cutback to terminate at Serangoon Int from Tampines Int.
85 Withdrawn.
97 Cutback to loop at Temasek Blvd from Jurong East Int.
106 Cutback to loop at Temasek Blvd from Bukit Batok Int.
111 Cutback to loop at Temasek Blvd from Ghim Moh Ter.
501/501# Withdrawn.
502 Cutback to loop at Temasek Blvd from Boon Lay Int.
511 Withdrawn.
512 Withdrawn.
3 30 November 2003 107 Extended to Hougang Ctrl Int.
107X
4 7 December 2003 62 Extended to Punggol Temp Int and re-routed to loop at Lor 1 Geylang.
82 Shortened to Serangoon Int and re-routed to start from Serangoon Int and loop at Punggol Rd End.
103 Shortened to Serangoon Int and extended to loop at Piccadilly, replacing Feeder Service 378.
103W New service, replacing Feeder Service 379.
378 Withdrawn.
379 Withdrawn.