Search results

Jump to navigation Jump to search
  • ...dok North Ave 3, Bedok North Rd, Bedok Reservoir Rd, Jln Eunos, Changi Rd, Geylang Rd, Kallang Rd, Victoria St, Hill St, (High St, North Bridge Rd), South Bri
    26 KB (4,251 words) - 18:39, 29 April 2024
  • |Serves additional bus stop after Jln Bt Merah along Kg Bahru Rd. |Serves additional bus stop after Jln Bt Merah along Kg Bahru Rd.
    34 KB (4,801 words) - 17:53, 7 May 2024
  • ...l closure of New Bridge Rd to facilitate the construction of Chinatown MRT station on the North East MRT Line. ...ure of Pasir Ris Dr 1 to facilitate the construction of Pasir Ris East MRT station on the Cross Island MRT Line.
    29 KB (4,298 words) - 08:05, 21 March 2024
  • |Amended to ply new slip road from Tiong Bahru Rd to Outram Rd with the conversion of Seng Poh Rd to one-way traffic. |Amended to ply Tiong Bahru Rd and the extended Zion Rd towards Crawford St Ter with the partial conver
    30 KB (4,469 words) - 08:06, 2 May 2024
  • |Amended to ply new slip road from Tiong Bahru Rd to Outram Rd with the conversion of Seng Poh Rd to one-way traffic. ...angoon Int, converted to full day trunk service and amended to ply Kallang Bahru and Marina Ctr.
    28 KB (4,056 words) - 08:06, 21 March 2024
  • ...al closure of Bencoolen St to facilitate the construction of Bencoolen MRT station on the Downtown MRT Line. ...al closure of Bencoolen St to facilitate the construction of Bencoolen MRT station on the Downtown MRT Line.
    29 KB (4,247 words) - 10:37, 29 March 2024
  • |Serves additional bus stop after Jln Bt Merah along Kg Bahru Rd. ...l closure of New Bridge Rd to facilitate the construction of Chinatown MRT station on the North East MRT Line.
    32 KB (4,618 words) - 04:44, 24 March 2024
  • ...longer than scheduled due to it using its emergency brakes to stop at the station at 7.50am, before being hit by another train when it failed to stop in time ...[[Kawasaki Heavy Industries 151|151 train]] approaching {{Stn|Pasir Ris}} station ran over them,<ref>[//www.straitstimes.com/singapore/transport/smrt-acciden
    14 KB (2,012 words) - 15:28, 17 June 2023
  • |Introduced between Yio Chu Kang Rd Ter and Lor 5 Geylang Ter under 1971 Bus Reorganisation. |Amended to ply Geylang Rd towards Lor 5 Geylang Ter with the conversion of Sims Ave to one-way traffic.
    30 KB (4,447 words) - 19:09, 10 May 2024
  • |Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter. |Revised to operate in the mornings and afternoons (towards Kg Bahru Ter) and afternoons and evenings (towards Pasir Ris Int) daily.
    50 KB (7,061 words) - 20:14, 15 April 2024
  • ...oc Inst along Upp Bt Timah Rd to facilitate the construction of Cashew MRT station along the Downtown MRT Line. ...l closure of New Bridge Rd to facilitate the construction of Chinatown MRT station on the North East MRT Line.
    35 KB (5,305 words) - 22:07, 4 March 2024
  • ...tial closure of Hougang Ctrl to facilitate the construction of Hougang MRT station on the Cross Island MRT Line. |Amended to ply Bendemeer Rd and Geylang Bahru, skipping Jln Kolam Ayer.
    37 KB (5,415 words) - 07:18, 13 May 2024
  • ...ions transferred to EML Transport Service and extended to start from Tiong Bahru Rd (Redhill Stn). |Introduced between Geylang Bahru and Shenton Way as a peak hour one-directional service during weekday morni
    32 KB (4,224 words) - 22:13, 22 April 2024

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)