Adtranz C-100: Difference between revisions
Jump to navigation
Jump to search
Created page with "{{Infobox/Train |Name=Adtranz C-100 |Img= |Info1= {{Infoline|In service|1996 – 2006}} {{Infoline|Manufacturer|Adtranz<br>(now Bombardier Transportation)}} {{Infoline|Orig..." |
(No difference)
|
Revision as of 17:59, 25 December 2018
Adtranz C-100 are the first generation of trains running on the Changi Airport Skytrain.
History
The C-100 trains operates until 2006 when the Changi Airport Skytrain had completed it overhaul works to link to the new Terminal 3.
Design/Features
| Initial | |
|---|---|
| Exterior Design | |
| Livery | Silver with multiple blue/teal strips |
| Train Run Number | N/A |
| Interior Design | |
| Seating Capacity | 22 |
| Wheelchair Bay | 1 |
| Door Closing Indicator Lights | N/A |
| System | |
| Safety System | ATC, ATO, ATP, ATS |
| Signalling System | Fixed Block |
| Traction Control | Thyristor (Bombardier) |
Fleet Numbering
The car numbers of the trains range from 01 to 04.
References
| Railway Lines in Singapore | [ V • T • E ] | |
|---|---|---|
| Mass Rapid Transit (MRT) | Template:NSL • Template:EWL • North East Line • Circle Line • Template:DTL • Thomson–East Coast Line | |
| FutureJurong Region Line • Cross Island Line | ||
| Light Rail Transit (LRT) | Template:BPLRT • Sengkang LRT • Punggol LRT | |
| Cross-border | KTM Intercity | |
| FutureJohor Bahru–Singapore Rapid Transit System | ||
| Others | Changi Airport Skytrain • Sentosa Express | |
| DefunctSentosa Monorail • Jurong Bird Park Panorail | ||