Difference between revisions of "History of Chinatown Direct Services"

From SgWiki
Jump to navigation Jump to search
Line 7: Line 7:
!Service changes
!Service changes
|-
|-
!rowspan="6"|{{SBS Transit}}<br>(Current)
!rowspan="7"|{{SBS Transit}}<br>(Current)
|2005
|2005
|21 January
|21 January
Line 20: Line 20:
|Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
|Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
|-
|-
|rowspan="2"|2020
|rowspan="3"|2020
|15 April
|15 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 1 June 2020.
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
|-
|2 June
|2 June
Line 36: Line 39:
!Service changes
!Service changes
|-
|-
!rowspan="6"|{{SBS Transit}}<br>(Current)
!rowspan="7"|{{SBS Transit}}<br>(Current)
|2005
|2005
|21 January
|21 January
Line 53: Line 56:
|Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
|Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
|-
|-
|rowspan="2"|2020
|rowspan="3"|2020
|15 April
|15 April
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 1 June 2020.
|Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
|-
|5 May
|Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
|-
|-
|2 June
|2 June

Revision as of 08:35, 25 April 2020

Service CT8 Handicapped/disabled access

Operator Year Date Service changes
Template:SBS Transit
(Current)
2005 21 January Introduced between Ang Mo Kio Ave 9 (Opp Ang Mo Kio Comm Hosp) and New Bridge Rd Ter.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
2020 15 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
2 June To resume normal operations.

Service CT18 Handicapped/disabled access

Operator Year Date Service changes
Template:SBS Transit
(Current)
2005 21 January Introduced between Bedok North Ave 3 (Blk 403) and New Bridge Rd Ter.
2006 TBC Skips a pair of abolished bus stops outside and opposite Bedok Green Sec Sch along Bedok North Ave 3.
2014 3 December Designated wheelchair-accessible bus service (WAB).
2018 10 March Extended to Kg Bahru Ter with the closure of New Bridge Rd Ter.
2020 15 April Temporarily suspended due to COVID-19 Circuit Breaker measures in Singapore until 4 May 2020.
5 May Temporary suspension of service due to COVID-19 Circuit Breaker measures in Singapore extended until 1 June 2020.
2 June To resume normal operations.

Service CT28 Handicapped/disabled access

Operator Year Date Service changes
Template:SBS Transit 2005 21 January Introduced between New Bridge Rd Ter and Clementi Ave 4 (Loop).
2008 21 July Revised to operate during the pre-Chinese New Year period only.
2016 28 March Designated wheelchair-accessible bus service (WAB).
1 September Withdrawn.