Difference between revisions of "Changi Airport Skytrain"

From SgWiki
Jump to navigation Jump to search
m
m
Line 40: Line 40:
{| class="wikitable"
{| class="wikitable"
|-
|-
!class="LTA"|Station!!class="LTA"|Terminal!!class="LTA"|Notes
!style="{{CSS/LTA}}"|Station!!style="{{CSS/LTA}}"|Terminal!!style="{{CSS/LTA}}"|Notes
|-
|-
!colspan=3 class="CAS"|[[File:CAS000.png|18px|link=|alt=]] Changi Airport Skytrain
!colspan=3 style="{{CSS/CAS|nofg=|nobc=|bc=}}"|[[File:CAS000.png|18px|link=|alt=]] Changi Airport Skytrain
|-
|-
|A||3||Transit only
|A||3||Transit only
Line 61: Line 61:
==Services==
==Services==
{| class="toccolours" border=1 style="border-collapse:collapse;text-align:left;"
{| class="toccolours" border=1 style="border-collapse:collapse;text-align:left;"
|-style="text-align:center;" class="CAS"
|-style="{{CSS/CAS|nofg=|nobc=|bc=}}text-align:center;"
!Type!!Ply Between!!Notes
!Type!!Ply Between!!Notes
|-
|-

Revision as of 10:18, 22 July 2020


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between these stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

Go-Ahead
  • From Sunday, 23 June 2024, Services
    84G
    &
    84W
    will be introduced to serve Punggol Way and New Punggol Rd in both directions. Please refer here for more information.

SBS Transit
  • From Monday, 24 June 2024, short trip services
    86A
    &
    86B
    will be introduced.
    • Short Trip
      86A
      will start from Jln Kayu (B/S 68119 (Aft Seletar Camp G)) and will terminate at Ang Mo Kio Ave 6 (B/S 55189 (Yio Chu Kang Stn)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
    • Short Trip
      86B
      will start from Ang Mo Kio Ave 6 (B/S 55181 (Opp Yio Chu Kang Stn)) and will terminate at Jln Kayu (B/S 68111 (Bef Seletar Camp G)). It only operates on Weekdays (except Public Holidays) during evening peak hours.
  • Please refer here for more information.

Land Transport Authority SBS Transit
  • From 30 June 2024 to 21 July 2024, train services on the North East Line will start later at 8am on Sundays. This is to facilitate the integrated testing of systems for the opening of the new Punggol Coast Station. Please refer here

SBS Transit
  • From Sunday, 14 July 2024, Service
    410G
    will be amended to ply Bishan St 23, calling at new bus stop in front of Blk 228 (53439). In addition, it will also start earlier at 5:25am on weekdays and 5:40am on weekends and public holidays from the bus stop at Blk 454 Sin Ming Ave (53369). Please refer here for more information.

Changi Airport Skytrain
CAS Logo.png
Statistics
Status Operational
Stations 7
Services 5
Operator(s) Changi Airport Group
Rolling stock Crystal Mover
Line length 6.4 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.

History

Date Event
1990 Terminal 1 - Terminal 2
March 2006 Replacement of C-100 trains to Crystal Movers
November 2007 Terminal 3
Opening of PMS South
24 February 2015 Suspension of PMS North (Terminal 2 - Terminal 3)
12 April 2019 Resumption of PMS North (Terminal 2 - Terminal 3)
1 May 2020 Temporary closure of Terminal 2 stations

Stations

Station Terminal Notes
Changi Airport Skytrain
A 3 Transit only
A (South) 3 Transit only
B 3 Linked to CG21Changi Airport
C 1
D 1
E 2 Linked to CG21Changi Airport
F 2 Transit only

Services

Type Ply Between Notes
Both Terminal 1Terminal 2 PMS North only.
Both Terminal 1Terminal 3 PMS North only.
Both Terminal 2Terminal 3
Transit Terminal 2Terminal 3 PMS South only.
Transit Terminal 3Terminal 3 (South) PMS South only.

Rolling stock

The rolling stock consists of Crystal Mover trains. These trains operate from two depots along the line at either side of the system.

References


Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Changi Airport Skytrain [ VTE ]
Stations Station AStation A (South)Station BStation CStation DStation EStation F
Rolling Stock Adtranz C-100 (Former) • Mitsubishi Heavy Industries Crystal Mover