Difference between revisions of "Changi Airport Skytrain"
Jump to navigation
Jump to search
m |
m (→Services) |
||
Line 64: | Line 64: | ||
!Type!!Ply Between!!Notes | !Type!!Ply Between!!Notes | ||
|- | |- | ||
|Both||{{Stn| | |Both||{{Stn|Station D}} (T1) ↔ {{Stn|Station E}} (T2)||PMS North only. | ||
|- | |- | ||
|Both||{{Stn| | |Both||{{Stn|Station B}} (T3) ↔ {{Stn|Station C}} (T1)||PMS North only. | ||
|- | |- | ||
|Both||{{Stn| | |Both||{{Stn|Station B}} (T3) ↔ {{Stn|Station E}} (T2)|| | ||
|- | |- | ||
|Transit||{{Stn| | |Transit||{{Stn|Station A}} (T3) ↔ {{Stn|Station F}} (T2)||PMS South only. | ||
|- | |- | ||
|Transit||{{Stn| | |Transit||{{Stn|Station A}} (T3) ↔ {{Stn|Station A (South)}} (T3)||PMS South only. | ||
|} | |} | ||
Revision as of 08:36, 23 July 2020
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
|
Changi Airport Skytrain | |
Statistics | |
---|---|
Status | Operational |
Stations | 7 |
Services | 5 |
Operator(s) | |
Rolling stock | Crystal Mover |
Line length | 6.4 km |
Track gauge | 1,850 mm broad gauge |
Electrification | 750V DC Third rail |
Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.
History
Date | Event |
---|---|
1990 | Terminal 1 - Terminal 2 |
March 2006 | Replacement of C-100 trains to Crystal Movers |
November 2007 | Terminal 3 |
Opening of PMS South | |
24 February 2015 | Suspension of PMS North (Terminal 2 - Terminal 3) |
12 April 2019 | Resumption of PMS North (Terminal 2 - Terminal 3) |
1 May 2020 | Temporary closure of Terminal 2 stations |
Stations
Station | Terminal | Notes |
---|---|---|
Changi Airport Skytrain | ||
A | 3 | Transit only |
A (South) | 3 | Transit only |
B | 3 | Linked to CG21Changi Airport |
C | 1 | |
D | 1 | |
E | 2 | Linked to CG21Changi Airport |
F | 2 | Transit only |
Services
Type | Ply Between | Notes |
---|---|---|
Both | Station D (T1) ↔ Station E (T2) | PMS North only. |
Both | Station B (T3) ↔ Station C (T1) | PMS North only. |
Both | Station B (T3) ↔ Station E (T2) | |
Transit | Station A (T3) ↔ Station F (T2) | PMS South only. |
Transit | Station A (T3) ↔ Station A (South) (T3) | PMS South only. |
Rolling stock
The rolling stock consists of Crystal Mover trains. These trains operate from two depots along the line at either side of the system.
References
Railway Lines in Singapore | [ V • T • E ] | |
---|---|---|
Mass Rapid Transit (MRT) | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Light Rail Transit (LRT) | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Cross-border | KTM Intercity | |
FutureJohor Bahru–Singapore Rapid Transit System | ||
Others | Changi Airport Skytrain • Sentosa Express | |
DefunctSentosa Monorail |
Changi Airport Skytrain | [ V • T • E ] | |
---|---|---|
Stations | Station A • Station A (South) • Station B • Station C • Station D • Station E • Station F | |
Rolling Stock | Adtranz C-100 (Former) • Mitsubishi Heavy Industries Crystal Mover |