Difference between revisions of "Sentosa Express"

From SgWiki
Jump to navigation Jump to search
(→‎Safety: Added info.)
m
 
(38 intermediate revisions by 9 users not shown)
Line 1: Line 1:
'''Sentosa Express''' (also known as Sentosa Express LRT) is a monorail line connecting to [[Sentosa]] island, this ride was opened on 15 January 2007 and is to replace the former [[Sentosa Monorail]] which has been used from 1982 to 2005. And this monorail line connects to [[VivoCity]] which is located near [[HarbourFront MRT Station|HarbourFront Station]].
{{Infobox/Line
|TA=RSE
|Line=SE
|Name=Sentosa Express<br>圣淘沙捷运<br>செந்தோசா எக்ஸ்பிரஸ்
|Info=
{{Infoline|Status|Operational}}
{{Infoline|Termini|VivoCity<br>Beach}}
{{Infoline|Stations|4}}
{{Infoline|Services|1}}
{{Infoline|Operator(s)|Sentosa Development Corporation}}
{{Infoline|Rolling stock|Hitachi small-type monorail (Sentosa Express)}}
{{Infoline|Line length|2.1 km}}
}}


==Features==
'''Sentosa Express''' is a monorail line connecting to Sentosa island. This line was opened on 15 January 2007 and replaces the former Sentosa Monorail which has been used from 1982 to 2005. This monorail line connects to VivoCity which is located near {{Stn|HarbourFront}}.
This line has a [[Platform Screen Doors]] to all stations to provide safety. And this is the first line in Singapore to use Half Height Platform Screen Doors to provide safety at all stations. Also at [[Sentosa Express#Sentosa Station|Sentosa Station]] platform is Spanish Solution, which one is for alighting and another one for boarding which will also be used on [[Choa Chu Kang MRT/LRT Station|Choa Chu Kang LRT Platforms]]. Monorail provide in bidirectional route which it connects to the [[VivoCity]] near [[HarbourFront MRT Station|HarbourFront Station]].


==Sentosa Station==
==Stations==
Sentosa Station is located at [[VivoCity]] Level 3 at Lobby L. The platforms are in Spanish Solution which means the station have one platform for boarding and another platform for alighting the stations. At this station has [[Platform Screen Doors]] to provide safety from prevent falling. When the monorail arrives, the doors will open for passengers to alight first then later they will open door for the boarding passengers then the door facing alighting platform will close. It opens on 15 January 2007.
<div style="overflow-y:auto;width=100%">
{| class="wikitable" style='white-space:nowrap;"
!style="{{CSS/LTA|s=|t=}}"|Alpha-Numeric<br>Code!!style="{{CSS/LTA|s=|t=}}"|Station Name!!style="{{CSS/LTA|s=|t=}}"|Image!!style="{{CSS/LTA|s=|t=}}"|Notes
|-
!colspan=4 style="{{CSS/SE|s=|t=}}"|{{Icon|SE|W|20px|d=inline}} {{SE|b=}}
|-
!{{Code/S|S1|SE}}
|{{Stn|VivoCity}}
|[[File:VivoCity-SE.png|120px]]
|Terminus<br>Formerly known as Sentosa station
|-
!{{Code/S|S2|SE}}
|{{Stn|Resorts World}}
|[[File:Resorts World-SE.png|120px]]
|Formerly known as Waterfront station
|-
!{{Code/S|S3|SE}}
|{{Stn|Imbiah}}
|[[File:Imbiah-SE.png|120px]]
|
|-
!{{Code/S|S4|SE}}
|{{Stn|Beach}}
|[[File:Beach-SE.png|120px]]
|Terminus
|-
|}
</div>


==Waterfront Station==
==Rolling stock==
Waterfront Station was opened on 15 February 2010 with the commencement of [[Resorts World Sentosa]]. At this station is to access to many parts of Resorts World Sentosa like [[S.E.A Aquarium]], [[Adventure Cove]] and [[Universal Studios Singapore]]. This station opens late as the Resorts World Sentosa is having construction back then. The platforms are in Island Platform.
The rolling stock consists of [[Hitachi Small-Type Monorail|Hitachi Monorail]] trains.


But however at Level 1, there is a queue which one is for passengers heading to Sentosa while another line is heading to Beach Station.
==References==
<references/>


==Imbiah Station==
{{Sentosa Express}}
Between Imbiah and Waterfront just take 20 seconds to be accessed. At this station can be accessed to [[Imbiah Lookout]] and as well as Merlion Park. The station opened on 15 January 2007. This station also can served the gateway of [[Resorts World Sentosa]]. The platform is Island Platform.
 
==Beach Station==
Beach Station is a terminal station for Sentosa Express and also the monorail can go to the Depot. The station opens on 15 January 2007 and the station can accessed to [[Palawan Beach]] and [[Siloso Beach]] and it can also served [[iFLY Singapore]] and also served [[Beach Arrival Plaza]] which trams and buses can be accessed. This station has one platform.
 
==Rolling Stock==
The rolling stock for Sentosa Express is [[Hitachi Monorail]] which is in two-car configuration and the passengers can fit to 148 passengers. There are 6 colours for this rolling stock: Green, Blue, Purple, Orange, Pink and Red. Compare to old [[Sentosa Monorail]], the train goes faster and got air conditioned trains compare to Old Monorail goes slow and no air conditioned which can cause passengers to feel uncomfortable. But at every stations, during peak hours, the staffs are being forced to all passengers to board that train instead of waiting for next train.
 
==Safety==
The Platform screen doors are being installed by ST Electronics at Sentosa Station using Full Height and the remaining three stations uses Half Height Platform Screen Doors (HHPSD), which is first to be used in Singapore. Formerly it was used by ST Electronics and later the stations were being replaced to Fangda in 2016.
 
==Links==
{{Railway Lines in Singapore}}

Latest revision as of 15:12, 5 May 2022


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Sentosa Express
圣淘沙捷运
செந்தோசா எக்ஸ்பிரஸ்
Statistics
Status Operational
Termini VivoCity
Beach
Stations 4
Services 1
Operator(s) Sentosa Development Corporation
Rolling stock Hitachi small-type monorail (Sentosa Express)
Line length 2.1 km

Sentosa Express is a monorail line connecting to Sentosa island. This line was opened on 15 January 2007 and replaces the former Sentosa Monorail which has been used from 1982 to 2005. This monorail line connects to VivoCity which is located near HarbourFront.

Stations[edit]

Alpha-Numeric
Code
Station Name Image Notes
icon Sentosa Express
S1 VivoCity VivoCity-SE.png Terminus
Formerly known as Sentosa station
S2 Resorts World Resorts World-SE.png Formerly known as Waterfront station
S3 Imbiah Imbiah-SE.png
S4 Beach Beach-SE.png Terminus

Rolling stock[edit]

The rolling stock consists of Hitachi Monorail trains.

References[edit]


icon Sentosa Express [ VTE ]
Stations VivoCityResorts WorldImbiahBeach
Rolling Stock Hitachi Monorail