Difference between revisions of "Bombardier Movia 951"
Line 1: | Line 1: | ||
{| class="toccolours" style="float: right; border-collapse: collapse; margin: 0em 1em;" border="1" cellpadding="2" cellspacing="0" | |||
| colspan="2" style="text-align:center" | <big><strong>Bombardier MOVIA C951</strong></big> | |||
== | |||
|- | |- | ||
| | | colspan="2"| | ||
|- | |- | ||
| Manufacturer | ! In service | ||
| 2013 | |||
|- | |||
! Manufacturer | |||
| Bombardier Transportation | |||
|- | |- | ||
! Built at | |||
| Changchun, China | |||
|- | |- | ||
! Family name | |||
| Movia | |||
|- | |- | ||
! Constructed | |||
| 2012 - 2016 | |||
|- | |- | ||
! Number built | |||
| Passenger service: 219 carriages (73 trains) | |||
|- | |- | ||
! Formation | |||
| 3 per trainset | |||
|- | |- | ||
! Depot(s) | |||
| [[Gali Batu Depot|Gali Batu]] and [[Kim Chuan Depot|Kim Chuan]] | |||
|- | |- | ||
! Line(s) served | |||
| [[Downtown Line]] | |||
|- | |- | ||
| Maximum speed | | style="background:#efefef;" align="center" colspan="2"| <strong>Specifications</strong> | ||
|- | |||
! Maximum speed | |||
| 90 km/h (Design)<br>80 km/h (Service) | |||
|- | |- | ||
! Electric system(s) | |||
| 750 V DC 3<sup>rd</sup> rail | |||
|- | |- | ||
! Gauge | |||
| 1,435 mm Standard gauge | |||
|} | |} | ||
The '''Bombardier MOVIA C951 cars''' belong to the newest generation of rolling stock on Singapore's [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) system. 73 trainsets consisting of 3 cars each were purchased at a cost of approximately S$570.7 million for passenger service.[http://www.bombardier.com/en/transportation/media-centre/press-releases/details?docID=0901260d8005e2da] These rail trains will serve the [[Downtown Line]] and will be delivered from late 2012 to 2016. They will be stabled at [[Gali Batu Depot]] and also on [[Kim Chuan Depot]], just like [[Alstom Metropolis C830]]. | |||
Bombardier beat Alstom, Kawasaki Heavy Industries and Hyundai Rotem in the tendering process as the lowest cost offered.<font color = "blue">[2]</font> | |||
==Fleet== | ==Fleet== | ||
Line 55: | Line 71: | ||
==Trainset numbers== | ==Trainset numbers== | ||
Unknown | Unknown | ||
==References== | |||
# Bombardier Receives Contract from Land Transport Authority of Singapore for 219 Driverless Metro Cars Valued at Approximately 298 Million Euros | |||
# ''Downtown train deal goes to Bombardier'', Christopher Tan, [[The Straits Times]], 8 November 2008 | |||
==Related Articles== | ==Related Articles== | ||
*[[Trains]] | *[[Trains]] | ||
*[[Trains in Depots]] | *[[Trains in Depots]] | ||
{{Mass Rapid Transit (Singapore)}} |
Revision as of 19:37, 8 February 2011
Bombardier MOVIA C951 | |
In service | 2013 |
---|---|
Manufacturer | Bombardier Transportation |
Built at | Changchun, China |
Family name | Movia |
Constructed | 2012 - 2016 |
Number built | Passenger service: 219 carriages (73 trains) |
Formation | 3 per trainset |
Depot(s) | Gali Batu and Kim Chuan |
Line(s) served | Downtown Line |
Specifications | |
Maximum speed | 90 km/h (Design) 80 km/h (Service) |
Electric system(s) | 750 V DC 3rd rail |
Gauge | 1,435 mm Standard gauge |
The Bombardier MOVIA C951 cars belong to the newest generation of rolling stock on Singapore's Mass Rapid Transit (MRT) system. 73 trainsets consisting of 3 cars each were purchased at a cost of approximately S$570.7 million for passenger service.[1] These rail trains will serve the Downtown Line and will be delivered from late 2012 to 2016. They will be stabled at Gali Batu Depot and also on Kim Chuan Depot, just like Alstom Metropolis C830.
Bombardier beat Alstom, Kawasaki Heavy Industries and Hyundai Rotem in the tendering process as the lowest cost offered.[2]
Fleet
Design
New train seat profile
The train seat profile is new and designed with the comfort of commuters in mind. Ergonomic considerations have been taken into account in the design of the curves of the seat.
Reserved seats in red colour
The reserved seats are coloured red for clear and obvious differentiation of seats catered for commuters with special needs.
Perch seats (Alternative to the two-seaters)
The two-seaters in the gangway area have been converted to perch seats, except for two wheelchair spaces in the centre car of the train. Perch seats create a wider standing space for commuters. They also encourage commuters to move towards the end of the train and provide greater ease of movement during boarding or alighting from the train.
Dynamic route map display
The dynamic route map display provides commuters with their current journey status and route information. Additionally, it also indicates the side of doors that will open. This is similar to the STARIS system on the C151,C651 and C751B trains.
New design of straphangers
A new design of straphangers, which is also used in other metros worldwide, offers commuters a steadier grip during train journeys.
Two-tone flooring
The two-tone flooring is an aesthetically new design.
Trainset numbers
Unknown
References
- Bombardier Receives Contract from Land Transport Authority of Singapore for 219 Driverless Metro Cars Valued at Approximately 298 Million Euros
- Downtown train deal goes to Bombardier, Christopher Tan, The Straits Times, 8 November 2008