Kim Chuan Depot

From SgWiki
Jump to: navigation, search


!
TRAVEL ADVISORY
!
North South Line: Train services between Orchard and City Hall stations will operate at a longer frequency till 7am due to track maintenance and upgrading works.
North South Line: Train service between City Hall and Raffles Place stations will start at 7am due to track maintenance and upgrading works. Affected commuters may board the East West Line instead.
North South Line: There is no train service between Woodlands and Yishun stations due to the construction of crossover track near Canberra station. Rail Bridging Service (Shuttle 10 & Express 17) are available. Certain bus service will be extended to coincide with the last shuttle bus timing.
North South Line: There is no train service between Woodlands and Yishun stations due to the construction of crossover track near Canberra station. Rail Bridging Service (Shuttle 10 & Express 17) are available. Certain bus service will be extended to coincide with the last shuttle bus timing.
East West Line: Train service between Tanah Merah and Bugis stations will end at 11pm due to track maintenance and upgrading works. Rail Bridging Service (Shuttle 6) are available during the early closure. Certain bus service will be extended to coincide with the last shuttle bus timing.
SBS Transit: Bus Service 253, 255, 257, 400 and 402 will have operate at a lower frequency during off-peak hours. Affected commuters may try the on-demand bus service during these time.
SMRT Buses: Bus Service NR7 will not be in operation. Affected commuters may try the on-demand bus service from 11.30pm to 2pm.
Kim Chuan Depot
金泉车厂
கிம் சுவான் பணிமனை
Statistics
Address 11 Kim Chuan Road
101 Bartley Road East
Singapore 537065/533951
Line(s) Circle Line
Downtown Line
Rolling Stock(s) C830
C830C
C951

Kim Chuan Depot is the sixth train depot in Singapore. It maintains trains for the Circle Line and the Downtown Line.

History

Date Event
28 May 2009 Depot officially opens
22 December 2013 Depot temporary served Downtown Line.
27 December 2015 Depot ceased serving Downtown Line.
21 October 2017 Depot Expansion (Tai Seng Maintenance Facility) opened to serve Downtown Line.

Reception Tracks

On the Circle Line, it has 4 reception tracks, 2 that lead to Tai Seng station and 2 to Bartley station.

On the Downtown Line, it has 2 reception tracks, 1 that lead to Ubi station and 1 to Bedok North station.

References


Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Current North South LineEast West LineNorth East LineCircle LineDowntown Line
Future Thomson–East Coast LineJurong Region LineCross Island Line
Rolling Stocks Current Kawasaki Heavy Industries C151Kawasaki Heavy Industries & CSR Qingdao Sifang C151AKawasaki Heavy Industries & CSR Qingdao Sifang C151BKawasaki Heavy Industries & CRRC Qingdao Sifang C151CSiemens C651Alstom Metropolis C751AKawasaki Heavy Industries & Nippon Sharyo C751BAlstom Metropolis C751CAlstom Metropolis C830Alstom Metropolis C830CBombardier MOVIA C951
Future Alstom Metropolis C851E • CJ151 • Bombardier MOVIA CR151 • Kawasaki Heavy Industries & CRRC Qingdao Sifang CT251
Depots Current BishanChangiGali BatuKim ChuanSengkangUlu PandanTuas
Future MandaiEast Coast
Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL Stage 6: KeppelCantonmentPrince Edward Road
Circle Line Extension: PromenadeBayfrontMarina Bay
Rolling Stock C830C830C • C851E
Depots Kim Chuan