Difference between revisions of "Adtranz 801"

From SgWiki
Jump to navigation Jump to search
m
Line 47: Line 47:
|}
|}


'''Bombardier INNOVIA C801''' (APM 100) is an automated people mover (APM) train built by Adtranz (now Bombardier Transportation) for the use on the [[Bukit Panjang LRT]] line and the former Singapore Changi Airport Skytrain until March 2006. These trains are mainly for airport connections and light rail in towns, operating by Automatic Train Control (ATC), making it fully automatic and driverless.  
'''Bombardier INNOVIA C801''' (APM 100) is an automated people mover (APM) train cars built by Adtranz (now Bombardier Transportation) for the use on the [[Bukit Panjang LRT]] line and the former Singapore Changi Airport Skytrain until March 2006. These train cars are mainly for airport connections and light rail in towns, operating by Automatic Train Control (ATC), making it fully automatic and driverless.  


The trains are also similar to the vehicles formerly used at Singapore Changi Airport Skytrain system in the early 1990s, jointly built by Westinghouse and Adtranz (acquired by Bombardier).  
The train cars are also similar to the vehicles formerly used at Singapore Changi Airport Skytrain system in the early 1990s, jointly built by Westinghouse and Adtranz (acquired by Bombardier).  


==Fleet==
==Fleet==
Line 55: Line 55:


==Operation==
==Operation==
The C801 trains are fully automated, without attendant, running on a system similarly to the [[Bombardier INNOVIA C801A|C801A]] trains.
The C801 train cars are fully automated, without attendant, running on a system similarly to the [[Bombardier INNOVIA C801A|C801A]] trains.


Trains can be coupled for two-car operations during peak hours.
Trains can be coupled for two-car operations during peak hours.
Line 61: Line 61:
==Features==
==Features==
Rubber-tired wheels are used to run on a concrete track and windows mist within 6 meters of residential buildings, eliminating both noise and privacy concerns.
Rubber-tired wheels are used to run on a concrete track and windows mist within 6 meters of residential buildings, eliminating both noise and privacy concerns.
==Refurbishment==
SMRT is considering a mid-life refurbishment of the existing 19 Bombardier INNOVIA C801 train cars.
If plans go through, it will be the first major overhaul for the C801 train cars. The refurbished train cars will have upgraded air-conditioning and air compressors together with an improved braking system.


==Trainset numbers==
==Trainset numbers==

Revision as of 19:52, 4 December 2014

Not to be confused with Bombardier INNOVIA C801A.
Bombardier INNOVIA C801
Exterior of a coupled C801 train.
In service 1990 - March 2006 (Changi Airport Skytrain)
6 November 1999 - Current (Bukit Panjang LRT)
Manufacturer Bombardier Transportation (Former Adtranz)
Number built Passenger service: 19 cars (19 trains)
Capacity 105 passengers
22 seats
Operator SMRT Light Rail (SMRT Corporation)
Depot Ten Mile
Line(s) served Bukit Panjang LRT
Former Changi Airport Skytrain
Specifications
Car length 12.8 m
Width 2.8 m
Height 3.4 m
Maximum speed 55 km/h (Design)
26 km/h (Service)
Weight 15000 kg
Gauge Central guideway with rubber tyres

Bombardier INNOVIA C801 (APM 100) is an automated people mover (APM) train cars built by Adtranz (now Bombardier Transportation) for the use on the Bukit Panjang LRT line and the former Singapore Changi Airport Skytrain until March 2006. These train cars are mainly for airport connections and light rail in towns, operating by Automatic Train Control (ATC), making it fully automatic and driverless.

The train cars are also similar to the vehicles formerly used at Singapore Changi Airport Skytrain system in the early 1990s, jointly built by Westinghouse and Adtranz (acquired by Bombardier).

Fleet

C801 Fleet Info

Operation

The C801 train cars are fully automated, without attendant, running on a system similarly to the C801A trains.

Trains can be coupled for two-car operations during peak hours.

Features

Rubber-tired wheels are used to run on a concrete track and windows mist within 6 meters of residential buildings, eliminating both noise and privacy concerns.

Refurbishment

SMRT is considering a mid-life refurbishment of the existing 19 Bombardier INNOVIA C801 train cars.

If plans go through, it will be the first major overhaul for the C801 train cars. The refurbished train cars will have upgraded air-conditioning and air compressors together with an improved braking system.

Trainset numbers

Individual cars are given a three-digit serial number by the rail operator, SMRT Corporation, ranging from 101 to 119.

Livery

  • Top: Current livery, a red stripe runs around the vehicle.
  • Bottom: Previous original livery, two turquoise/green stripe runs around the vehicle.















Related Articles

icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction