Difference between revisions of "Mitsubishi Heavy Industries 810A"

From SgWiki
Jump to navigation Jump to search
m (Better name for C810 and C810A.)
Line 1: Line 1:
: ''Not to be confused with [[Mitsubishi Heavy Industries C810]].''
: ''Not to be confused with [[Mitsubishi Heavy Industries Crystal Mover C810]].''
{| class="toccolours" style="float: right; border-collapse: collapse; margin: 0em 1em;" border="1" cellpadding="2" cellspacing="0"
{| class="toccolours" style="float: right; border-collapse: collapse; margin: 0em 1em;" border="1" cellpadding="2" cellspacing="0"
| colspan="2" style="text-align:center" | <big><strong>Mitsubishi Heavy Industries C810A</strong></big>
| colspan="2" style="text-align:center" | <big><strong>Mitsubishi Heavy Industries C810A</strong></big>

Revision as of 15:11, 15 December 2016

Not to be confused with Mitsubishi Heavy Industries Crystal Mover C810.
Mitsubishi Heavy Industries C810A
In service 5 April 2016
Manufacturer Mitsubishi Heavy Industries
Constructed 2016
Number built Passenger service: 16 cars (16 trains)
Capacity 105 passengers
18 seats
Operator SBS Transit
Depot(s) Sengkang
Line(s) served Sengkang LRT, Punggol LRT
Specifications
Car body construction Aluminium-alloy welded
Car length 11.84 m
Width 2.69 m
Height 3.615 m
Weight 14900 kg
Engine Three-phase DC induction motor
Maximum speed 80 km/h (Design)
35 km/h (Service)
Acceleration 1.0 m/s2
Deceleration 1.0 m/s2 (Service)
1.3 m/s2 (Emergency)
Braking system Regenerative (Service)
Electro-Pneumatic (Service)
Electric system 750 V DC 3rd rail
Gauge Side-mounted guideway with rubber tyres

Mitsubishi Heavy Industries C810A (Crystal Mover) is an automated people mover (APM) train built by Mitsubishi Heavy Industries for the use on the Sengkang LRT and Punggol LRT lines. These trains are mainly for airport and light rail applications, operating by Automatic Train Control (ATC), making it fully automatic and driverless.

This additional batch of trains will be arriving progressively by 2016, and subsequently increasing the capacity of the Sengkang and Punggol LRT lines by 40% by 2016.

Operation

The C810A trains are fully automated, without attendant, running on a system that are similar to the Mitsubishi Heavy Industries C810 trains.

Trains can be coupled for two-car operations.

Related Articles

icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction