Difference between revisions of "Thomson-East Coast Line Bus Rationalisation"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
==Introduction== | ==Introduction== | ||
In conjunction with the opening of the Thomson-East Coast MRT Line, the existing bus service network in Upper Thomson and | In conjunction with the opening of the Thomson-East Coast MRT Line, the existing bus service network in Upper Thomson and the city will be rationalised to reduce route duplication and to complement the MRT system from 10 December 2023. | ||
==Service changes== | ==Service changes== |
Revision as of 17:02, 17 November 2023
Introduction
In conjunction with the opening of the Thomson-East Coast MRT Line, the existing bus service network in Upper Thomson and the city will be rationalised to reduce route duplication and to complement the MRT system from 10 December 2023.
Service changes
Service | Service changes |
---|---|
75 | To be shortened to terminate at Bt Merah Int from Gali Batu Ter. Deleted sectors to be replaced by service 121. |
121 | To be extended to start from Shenton Way Ter, replacing deleted sectors of Service 75 and 167. |
162 | To be shortened to loop at Sin Ming Dr from Yio Chu Kang Int. |
162M | To be discontinued. |
167 | |
859 | To be amended to ply Canberra Link in both directions, skipping a part of Sembawang Rd. Replaces deleted sectors of Service 167. |