Difference between revisions of "Thomson-East Coast Line Bus Rationalisation"

From SgWiki
Jump to navigation Jump to search
Line 24: Line 24:
|-
|-
!859
!859
|To be amended to ply Canberra Link, skipping a part of Sembawang Rd. Replaces deleted sectors of Service 167.
|To be amended to ply Canberra Link, skipping a part of Canberra Rd. Replaces deleted sectors of Service 167.
|}
|}


[[Category:Buses]]
[[Category:Buses]]

Revision as of 21:01, 18 November 2023

Introduction

In conjunction with the opening of the Thomson-East Coast MRT Line, the existing bus service network in Upper Thomson and the city will be rationalised to reduce route duplication and to complement the MRT system from 10 December 2023.

Service changes

Service Service changes
75 To be shortened to terminate at Bt Merah Int from Gali Batu Ter. Deleted sectors to be replaced by service 121.
121 To be amended to start from Shenton Way Ter, replacing deleted sectors of Service 75 and 167.
162 To be integrated with Service 162M, shortened to loop at Sin Ming Dr from Yio Chu Kang Int and converted to full-day service.
162M To be integrated with Service 162 and discontinued.
167 To be discontinued.
859 To be amended to ply Canberra Link, skipping a part of Canberra Rd. Replaces deleted sectors of Service 167.