Difference between revisions of "Changi Airport Skytrain"

From SgWiki
Jump to navigation Jump to search
m
m
Line 40: Line 40:
{| class="wikitable"
{| class="wikitable"
|-
|-
!class="LTA"|Station!!class="LTA"|Terminal!!class="LTA"|Notes
!style="{{CSS/LTA}}"|Station!!style="{{CSS/LTA}}"|Terminal!!style="{{CSS/LTA}}"|Notes
|-
|-
!colspan=3 class="CAS"|[[File:CAS000.png|18px|link=|alt=]] Changi Airport Skytrain
!colspan=3 style="{{CSS/CAS|nofg=|nobc=|bc=}}"|[[File:CAS000.png|18px|link=|alt=]] Changi Airport Skytrain
|-
|-
|A||3||Transit only
|A||3||Transit only
Line 61: Line 61:
==Services==
==Services==
{| class="toccolours" border=1 style="border-collapse:collapse;text-align:left;"
{| class="toccolours" border=1 style="border-collapse:collapse;text-align:left;"
|-style="text-align:center;" class="CAS"
|-style="{{CSS/CAS|nofg=|nobc=|bc=}}text-align:center;"
!Type!!Ply Between!!Notes
!Type!!Ply Between!!Notes
|-
|-

Revision as of 10:18, 22 July 2020


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Changi Airport Skytrain
CAS Logo.png
Statistics
Status Operational
Stations 7
Services 5
Operator(s) Changi Airport Group
Rolling stock Crystal Mover
Line length 6.4 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.

History

Date Event
1990 Terminal 1 - Terminal 2
March 2006 Replacement of C-100 trains to Crystal Movers
November 2007 Terminal 3
Opening of PMS South
24 February 2015 Suspension of PMS North (Terminal 2 - Terminal 3)
12 April 2019 Resumption of PMS North (Terminal 2 - Terminal 3)
1 May 2020 Temporary closure of Terminal 2 stations

Stations

Station Terminal Notes
Changi Airport Skytrain
A 3 Transit only
A (South) 3 Transit only
B 3 Linked to CG21Changi Airport
C 1
D 1
E 2 Linked to CG21Changi Airport
F 2 Transit only

Services

Type Ply Between Notes
Both Terminal 1Terminal 2 PMS North only.
Both Terminal 1Terminal 3 PMS North only.
Both Terminal 2Terminal 3
Transit Terminal 2Terminal 3 PMS South only.
Transit Terminal 3Terminal 3 (South) PMS South only.

Rolling stock

The rolling stock consists of Crystal Mover trains. These trains operate from two depots along the line at either side of the system.

References


Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Changi Airport Skytrain [ VTE ]
Stations Station AStation A (South)Station BStation CStation DStation EStation F
Rolling Stock Adtranz C-100 (Former) • Mitsubishi Heavy Industries Crystal Mover