Tuas West MRT Rationalisation

From SgWiki
Jump to navigation Jump to search

Introduction

In conjunction with the opening of the Tuas West MRT Extension, the existing bus service network in the Jurong Industrial Estate was rationalised to reduce route duplication and to complement the MRT extension on 18 June 2017.

Service changes

Service Service changes
192 Amended to ply Jurong West St 62 and Pioneer Rd, skipping Jurong West St 63, Tuas Ave 7 and Tuas Link 4, replacing deleted sectors of Service 256.
247 Introduced between Tuas Ter and Tuas Bay Link (loop) under the LTA's BSEP, serving Tuas Crescent Stn and Tuas Link Stn.
248 Introduced between Tuas Ter and Tuas South Ave 14 (loop) under the LTA's BSEP, serving Tuas West Road Stn and Tuas Link Stn.
254 Amended to ply Pioneer Rd, skipping Tuas Cres and Tuas Ave 20. Deleted sectors were replaced by Services 247 and 248.
256 Integrated with Service 258 and withdrawn. Deleted sectors were replace by Services 192 and 258.
258 Integrated with Service 256. Amended to ply Pioneer Rd North, Jln Ahmad Ibrahim, Benoi Rd and amended to loop at Jurong West St 64, skipping Upp Jurong Rd and Boon Lay Integrated Transport Hub.