TRAVEL ADVISORY
|
!
|
- From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.
- From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
- Please refer
- here for more information on the adjustments.
- here for Shuttle Bus and Train arrangements.
- here for the work map.
- From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.
- From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.
- From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
- Please refer to the following for more information.
- From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.
- From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.
|
|
Changi Airport Skytrain
|
|
|
Statistics
|
Status
|
Operational
|
Stations
|
7
|
Services
|
5
|
Operator(s)
|
|
Rolling stock
|
Crystal Mover
|
Line length
|
6.4 km
|
Track gauge
|
1,850 mm broad gauge
|
Electrification
|
750V DC Third rail
|
Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.
History
Date |
Event
|
1990 |
Terminal 1 - Terminal 2
|
March 2006 |
Replacement of C-100 trains to Crystal Movers
|
November 2007 |
Terminal 3
|
Opening of PMS South
|
24 February 2015 |
Suspension of PMS North (Terminal 2 - Terminal 3)
|
12 April 2019 |
Resumption of PMS North (Terminal 2 - Terminal 3)
|
1 May 2020 |
Temporary closure of Terminal 2 stations
|
Stations
Station |
Terminal |
Notes
|
Changi Airport Skytrain
|
A |
3 |
Transit only
|
A (South) |
3 |
Transit only
|
B |
3 |
Linked to CG21Changi Airport
|
C |
1 |
|
D |
1 |
|
E |
2 |
Linked to CG21Changi Airport
|
F |
2 |
Transit only
|
Services
Rolling stock
The rolling stock consists of Crystal Mover trains. These trains operate from two depots along the line at either side of the system.
References