Johor Bahru–Singapore Rapid Transit System
Revision as of 16:44, 30 July 2020 by Supernutorcrazy (talk | contribs)
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
|
Johor Bahru–Singapore Rapid Transit System | |
Statistics | |
---|---|
Status | Under Construction |
Stations | 2 |
Services | 1 |
Operator(s) | |
Line length | 4 km |
Johor Bahru–Singapore Rapid Transit System (RTS) will be a cross-border rapid transit system that would connect Woodlands, Singapore and Johor Bahru, Malaysia and is expected to begin service in 2026.[1]
Stations
Alpha-Numeric Code |
Station Name | Image | Working names | Notes |
---|---|---|---|---|
Johor Bahru–Singapore Rapid Transit System | ||||
Template:Code/1 | Bukit Chagar | Bukit Chagar | Terminus | |
Template:Code/2 | Woodlands North | Woodlands North | Terminus Connected to Thomson–East Coast Line |
Rolling stock
The rolling stock will be similar to the system used in Ampang LRT line, Malaysia. These trains will operate from Bukit Chagar Depot near Bukit Chagar station.
References
- ↑ "JB-Singapore RTS Link project signing ceremony to be held on Jul 30, says Malaysian transport minister". Channel NewsAsia (21 July 2020)
Railway Lines in Singapore | [ V • T • E ] | |
---|---|---|
Mass Rapid Transit (MRT) | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Light Rail Transit (LRT) | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Cross-border | KTM Intercity | |
FutureJohor Bahru–Singapore Rapid Transit System | ||
Others | Changi Airport Skytrain • Sentosa Express | |
DefunctSentosa Monorail |
Johor Bahru–Singapore Rapid Transit System | [ V • T • E ] | |
---|---|---|
Stations | Bukit Chagar • Woodlands North | |
Depots | Bukit Chagar |