Kadaloor station

From SgWiki
Jump to: navigation, search


!
TRAVEL ADVISORY
!
SBS Transit North East Line: Train service between Serangoon and Punggol stations will end at 11pm due to track maintenance and upgrading works. Rail Bridging Service (Shuttle 21) are available during the early closure. Certain bus service will be extended to coincide with the last shuttle bus timing.
SBS Transit: From 21 July 2019, Bus Service 5 will be amended to ply Flora Drive and Mariam Way. Please refer here for more information.
SMRT North South Line: Canberra MRT station will commence operation on 2 November 2019. Please refer here for more information.
PE5
Kadaloor
卡达鲁
கடலூர்
Kadaloor-PGLRT.png
Statistics
Address 60 Punggol Drive
Singapore 828853
Line(s) Punggol LRT
Connections Bus

Kadaloor (PE5) is an elevated Light Rail Transit (LRT) station on the Punggol LRT.

History

Date Event
29 January 2005 Station officially opens

Layout

L3 Platform 1
Service A: PE5
Kadaloor
PTCNE17
Punggol
Platform 1/2
Platform 2
Service B: PTCNE17
Punggol
PE1
Cove
PE5
Kadaloor
L2 Concourse Faregates, Ticketing Machines
L1 Street Level

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Punggol Drive, Waterway Primary School
B Handicapped/disabled access Punggol Drive

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
Punggol LRT
PTC Punggol 05:33 05:33 05:53 00:51
PTC Punggol
   via Cove
05:24 05:24 05:44 00:25

Bus

Bus Stop Exit Bus Service
(65329) Kadaloor Stn Exit A A
50
666
(65321) Kadaloor Stn Exit B B
50
666

References


Punggol LRT [ VTE ]
Stations Punggol
East Loop: CoveMeridianCoral EdgeRivieraKadaloorOasisDamai
West Loop: Sam KeeTeck LeePunggol PointSamuderaNibongSumangSoo Teck
Rolling Stock C810C810A
Depots Sengkang