Search results

Jump to navigation Jump to search
  • {{Infobox/Depot |Name=Ten Mile Junction Depot<br>十里广场车厂<br>பத்தாம் கல் சந்திப
    1 KB (149 words) - 22:38, 5 March 2024
  • |Name=Light Rail Transit ...ces to the heavy rail Mass Rapid Transit, which together forms the core of rail transport services. The first LRT line was opened in 1999 and the system ha
    3 KB (449 words) - 22:37, 5 March 2024
  • {{Infobox/Depot |Name=Sengkang Depot<br>盛港车厂<br>செங்காங்ப பணிமனை
    3 KB (329 words) - 09:21, 30 July 2023
  • |Name=Johor Bahru–Singapore Rapid Transit System ...line in Singapore to use both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT) denotation, with the MRT for Singapore and the LRT for Malaysia.
    2 KB (248 words) - 17:43, 27 July 2021
  • {{Infoline|Electrification|750V DC Third rail}} '''Sengkang LRT (SKLRT)''' is the second [[Light Rail Transit]] (LRT) line. The line is currently 10.6 km long with 14 stations and it is
    3 KB (464 words) - 22:39, 5 March 2024
  • {{Infoline|Electrification|750V DC Third rail}} '''Punggol LRT (PGLRT)''' is the third [[Light Rail Transit]] (LRT) line. Traveling one loop takes about 15 minutes. The line is curren
    4 KB (558 words) - 22:39, 5 March 2024
  • {{Infoline|Electrification|Third rail}} '''Bukit Panjang LRT (BPLRT)''' is the first [[Light Rail Transit]] (LRT) line. Traveling one loop takes about 30 minutes. The line is curren
    4 KB (641 words) - 22:40, 5 March 2024
  • '''Ten Mile Junction (BP14)''' is a former elevated [[Light Rail Transit]] (LRT) station on the {{BPLRT}}. Due to insufficient demand, a 1-carriage |Service Level||[[Ten Mile Junction Depot]]
    2 KB (248 words) - 05:22, 27 July 2021
  • '''Tongkang (SW7)''' is a [[Light Rail Transit]] (LRT) station on the {{SKLRT}}. |[[Sengkang Depot]]
    3 KB (399 words) - 02:28, 14 January 2023
  • The safety of the [[Mass Rapid Transit]] system in Singapore was questioned by the public after several accidents ...10:00 am) – An empty [[Siemens 651|SIE train]] on its way back to [[Bishan Depot]] after the morning peak service derailed between {{Stn|Yio Chu Kang}} and
    14 KB (1,997 words) - 15:32, 17 June 2023
  • {{Infoline|Electrification|750V DC Third rail}} '''East–West Line (EWL)''' is the second [[Mass Rapid Transit]] (MRT) line. Traveling from one end to the other takes about 80 minutes. T
    14 KB (2,012 words) - 15:28, 17 June 2023