Difference between revisions of "Changi Airport Extension"

From SgWiki
Jump to navigation Jump to search
Line 1: Line 1:
The '''East West MRT Line''' was the second Mass Rapid Transit (MRT) line in Singapore to be built. The line is currently 49.2 km long with 31 stations, and operated by SMRT Corporation. It takes about one hour to travel from end to end and this line is coloured '''<font color=green>green</font>''' on MRT system maps.
The '''East West MRT Line (Changi Airport Extension)''' was the second Mass Rapid Transit (MRT) line in Singapore to be built. The line is currently 49.2 km long with 31 stations, and operated by SMRT Corporation. It takes about one hour to travel from end to end and this line is coloured '''<font color=green>green</font>''' on MRT system maps.


As the name implies, the line connects central Singapore to both western and eastern parts of the island, with an additional branch to Changi Airport MRT Station from Tanah Merah MRT Station. Cross-platform transfer to the North South MRT Line is provided at Jurong East MRT Station, City Hall MRT Station and Raffles Place MRT Station stations while transfer to the North East MRT Line at Outram Park MRT Station is possible via a linkway.
As the name implies, the line connects central Singapore to both western and eastern parts of the island, with an additional branch to Changi Airport MRT Station from Tanah Merah MRT Station. Cross-platform transfer to the North South MRT Line is provided at Jurong East MRT Station, City Hall MRT Station and Raffles Place MRT Station stations while transfer to the North East MRT Line at Outram Park MRT Station is possible via a linkway.

Revision as of 16:50, 3 March 2010

The East West MRT Line (Changi Airport Extension) was the second Mass Rapid Transit (MRT) line in Singapore to be built. The line is currently 49.2 km long with 31 stations, and operated by SMRT Corporation. It takes about one hour to travel from end to end and this line is coloured green on MRT system maps.

As the name implies, the line connects central Singapore to both western and eastern parts of the island, with an additional branch to Changi Airport MRT Station from Tanah Merah MRT Station. Cross-platform transfer to the North South MRT Line is provided at Jurong East MRT Station, City Hall MRT Station and Raffles Place MRT Station stations while transfer to the North East MRT Line at Outram Park MRT Station is possible via a linkway.

History

Initial system

  • 4 November 1989: City Hall MRT Station - Tanah Merah MRT Station (start of the separation of the North South MRT Line from the East West Line)

2nd phase of development

  • 10 January 2001: Tanah Merah MRT Station - Expo MRT Station
  • 8 February 2002: Expo MRT Station - Changi Airport MRT Station

Station

Alpha-Numeric
Code
Abbreviation Station Name Notes
English Chinese Tamil
Changi Airport Line
EW4 TNM Tanah Merah 丹那美拉 தானா மேரா Interchange station with EWL
CG1 XPO Expo 博览 எக்ஸ்போ
CG2 CGA Changi Airport 樟宜机场 சாங்கி விமானநிலையம Terminus (3)


Rolling stock

Three batches of rolling stock are in service on the line, i.e. the Kawasaki Heavy Industries C151, the Siemens C651 and the Kawasaki Heavy Industries & Nippon Sharyo C751B. These trains operate from the two depots along the East West Line, the Ulu Pandan Depot near Jurong East MRT Station and the Changi Depot after Tanah Merah MRT Station.

Rail Lines in Singapore

MRT Lines

EW East West Line
东西线
CG Changi Airport Extension
樟宜机场支线
NS North South Line
南北线
NE North East Line
东北线
CC Circle Line (under construction)
环线
DT Downtown Line (under construction)
滨海市区线
LINE

LRT Lines

BP Bukit Panjang LRT
武吉班让轻轨
PG Punggol LRT
榜鹅轻轨
SK Sengkang LRT
盛港轻轨
LINE