Difference between revisions of "North East Line Bus Rationalisation"

From SgWiki
Jump to navigation Jump to search
m (Reverted edits by TohChangYih99 Path Light (talk) to last revision by SMB1341U)
(→‎Service changes: 106 terminates at Marina Centre Ter that time.)
Line 13: Line 13:
!rowspan="8"|21 June 2003
!rowspan="8"|21 June 2003
!21
!21
|rowspan="2"|Amended to serve Farrer Park Stn via Jln Besar, Kitchener Rd and Serangoon Rd in the direction of St Michael's Ter.
|rowspan="2"|Amended to serve Farrer Park Stn via Jln Besar, Kitchener Rd and Serangoon Rd in the direction towards St Michael's Ter.
|-
|-
!125
!125
|-
|-
!22
!22
|rowspan="3"|Amended to serve Serangoon Stn via Serangoon Ctrl and Upp Serangoon Rd.
|rowspan="3"|Amended to serve Serangoon Stn via Serangoon Ctrl and Upp Serangoon Rd in both directions.
|-
|-
!53
!53
Line 25: Line 25:
|-
|-
!72
!72
|Amended to serve Hougang Stn via Hougang Ctrl.
|Amended to serve Hougang Stn via Hougang Ctrl in both directions.
|-
|-
!130
!130
|rowspan="2"|Amended to serve Boon Keng Stn via Serangoon Rd, Boon Keng Rd and Bendemeer Rd.
|rowspan="2"|Amended to serve Boon Keng Stn via Serangoon Rd, Boon Keng Rd and Bendemeer Rd in the direction towards the city.
|-
|-
!139
!139
Line 44: Line 44:
|-
|-
!106
!106
|Cutback to loop at Temasek Blvd from Bukit Batok Int.
|Cutback to terminate at Marina Centre Ter from Bukit Batok Int.
|-
|-
!111
!111
Line 71: Line 71:
!rowspan="6"|7 December 2003
!rowspan="6"|7 December 2003
!62
!62
|Extended to Punggol Temp Int and re-routed to loop at Lor 1 Geylang.
|Extended to start from Punggol Temp Int and re-routed to loop at Lor 1 Geylang.
|-
|-
!82
!82
Line 77: Line 77:
|-
|-
!103
!103
|Shortened to Serangoon Int and extended to loop at Piccadilly, replacing Feeder Service 378.
|Shortened to Serangoon Int and re-routed to start from Serangoon Int and extended to loop at Piccadilly, replacing Feeder Service 378.
|-
|-
!103W
!103W

Revision as of 14:18, 25 July 2016

Introduction

In conjunction with the opening of the North-East MRT Line, the existing bus service network in the North-East corridor was rationalised to reduce route duplication and to complement the MRT system within the period between June and December 2003.

Service changes

Phase Implementation date Service Service changes
1 21 June 2003 21 Amended to serve Farrer Park Stn via Jln Besar, Kitchener Rd and Serangoon Rd in the direction towards St Michael's Ter.
125
22 Amended to serve Serangoon Stn via Serangoon Ctrl and Upp Serangoon Rd in both directions.
53
70
72 Amended to serve Hougang Stn via Hougang Ctrl in both directions.
130 Amended to serve Boon Keng Stn via Serangoon Rd, Boon Keng Rd and Bendemeer Rd in the direction towards the city.
139
2 27 July 2003 81 Cutback to terminate at Serangoon Int from Tampines Int.
85 Withdrawn.
97 Cutback to loop at Temasek Blvd from Jurong East Int.
106 Cutback to terminate at Marina Centre Ter from Bukit Batok Int.
111 Cutback to loop at Temasek Blvd from Ghim Moh Ter.
501/501# Withdrawn.
502 Cutback to loop at Temasek Blvd from Boon Lay Int.
511 Withdrawn.
512 Withdrawn.
3 30 November 2003 107 Extended to Hougang Ctrl Int.
107X
4 7 December 2003 62 Extended to start from Punggol Temp Int and re-routed to loop at Lor 1 Geylang.
82 Shortened to Serangoon Int and re-routed to start from Serangoon Int and loop at Punggol Rd End.
103 Shortened to Serangoon Int and re-routed to start from Serangoon Int and extended to loop at Piccadilly, replacing Feeder Service 378.
103W New service, replacing Feeder Service 379.
378 Withdrawn.
379 Withdrawn.