Difference between revisions of "Bombardier Innovia 801A"
Jump to navigation
Jump to search
(There are only 13 C801A trains.) |
|||
Line 23: | Line 23: | ||
==History== | ==History== | ||
On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. <ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=596bf603-1252-47ac-8ae9-e8e2f2a7f733 "Award of Contract to Renew the Bukit Panjang LRT System"]. Land Transport Authority. Retrieved 28 July 2018.</ref> Under the contract, all of the | On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. <ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=596bf603-1252-47ac-8ae9-e8e2f2a7f733 "Award of Contract to Renew the Bukit Panjang LRT System"]. Land Transport Authority. Retrieved 28 July 2018.</ref> Under the contract, all of the 13 C801A trains would be retrofitted with the new signalling system by 2022. | ||
==Design/Features== | ==Design/Features== |
Revision as of 12:52, 24 June 2020
Bombardier INNOVIA C801A center-left center-right *Graphic From SGTrains/Wikipedia/LTA | |
In service | 2014 – Present |
---|---|
Manufacturer | Bombardier Transportation |
Origin | Pennsylvania, United States of America |
Constructed | 2014 – 2015 |
Number Built | 13 cars (13 Trains) |
Statistics | |
Body Construction | Aluminum |
Length | 12.8 m |
Width | 2.8 m |
Height | 3.4 m |
Doors | 2 m, 4 per car |
Maximum Speed | Design: 55 km/h Service: 48 km/h |
Traction Control | Thyristor (Bombardier) |
Line Voltage | 600V AC Third Rail |
Track Gauge | Central Guideway |
Bombardier INNOVIA C801A are the second generation of trains running on the Bukit Panjang LRT.
History
On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. [1] Under the contract, all of the 13 C801A trains would be retrofitted with the new signalling system by 2022.
Design/Features
Initial | |
---|---|
M
| |
Exterior Design | |
Livery | SMRT Pixel Livery (White with Yellow, Red, Black stripes) |
Train Run Number | N/A |
Interior Design | |
Seating Capacity | 16 |
Wheelchair Bay | N/A |
Door Closing Indicator Lights | N/A |
System | |
Safety System | ATC, ATO, ATP, ATS |
Signalling System | Fixed Block |
Traction Control | Thyristor (Bombardier) |
Fleet Numbering
The car numbers of the trains range from 120 to 132.
References
- ↑ "Award of Contract to Renew the Bukit Panjang LRT System". Land Transport Authority. Retrieved 28 July 2018.
Light Rail Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Rolling Stocks | 801 • 801A • 801B • 810 • 810A | |
Future810D | ||
Depots | Sengkang • Ten Mile Junction |
Bukit Panjang LRT | [ V • T • E ] | |
---|---|---|
Stations | Choa Chu Kang • South View • Keat Hong • Teck Whye • Phoenix • Bukit Panjang • Petir • Pending • Bangkit • Fajar • Segar • Jelapang • Senja | |
FormerTen Mile Junction | ||
Rolling Stock | 801 • 801A • 801B | |
Depots | Ten Mile Junction | |
Others | Bridging Service |