Senja station

From SgWiki
Jump to navigation Jump to search


!
COVID-19 ADVISORY
!
In light of the current COVID-19, sgWiki would like to remind all to:
!
TRAVEL ADVISORY
!
Changi Airport Group Changi Airport Skytrain
  • Due to renovation of Terminal 2, skytrain services serving T2 Station E are suspended.

SBS Transit
  • From Sunday, 31 July 2022, bus service
    117
    and
    117M
    will be amended to ply Punggol Field. Please refer here for more information.

Land Transport Authority SBS Transit Sengkang LRT Punggol LRT
  • To facilitate maintenance work, from Saturday, 21 May 2022, to Sunday, 25 September 2022, train services on the Sengkang LRT and the Punggol LRT will operate on a single loop on Saturdays and Sundays. Please refer to SBS Transit website for more information.

BP13
Senja
信佳
சென்ஜா
Senja-BPLRT.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 90 Bukit Panjang Ring Road
Singapore 679942
Line(s) Bukit Panjang LRT
Structure Elevated
Connections Bus

Senja (BP13) is a Light Rail Transit (LRT) station on the Bukit Panjang LRT.

History[edit]

Date Event
6 November 1999 Station officially opened
4 October 2020 Station closed due to the upgrading of signaling system on the Bukit Panjang LRT[1]
11 October 2020
18 October 2020
25 October 2020

2002 train disruption[edit]

On 21 October 2002, the entire Bukit Panjang LRT was shut down at 6.38am after a disruption caused by a dislodged train wheel, which led to the power system being crippled between Bukit Panjang and Senja stations. Partial LRT services only resumed at 6.30pm on 24 October 2002 and full services at 12pm on 26 October 2002.[2]

2015 train disruption[edit]

On 9 March 2015, during the evening peak hours, the Bukit Panjang LRT was suspended from service for a full 24 hours due to a power trip which was caused by a fire. The fire was caused due to a sudden power surge and the fuse box failed to handle the surge. Usually the fuse box will trip the system and activate safety measures, but on that day the fuse box failed to do so and instead burst into flames. The problem was identified as arcing problem which was why the power "jumped". The reason for how the fire started, however, is still a mystery to this day.[3]

Layout[edit]

L2
Platform 2
2Platform Service A: BP13
Senja
BP12
Jelapang
BP7
Petir
BP1NS4
Choa Chu Kang
1Platform Service B: BP1NS4
Choa Chu Kang
BP6DT1
Bukit Panjang
BP13
Senja
Platform 1
L1 Concourse Faregates, Ticketing Machines
Street Level

Notes: Platform 2 will opens between start of operation and 9am and between 5pm and 8pm on weekdays except public holiday.

Exits[edit]

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Bt Panjang Ring Rd, Senja Rd

Transport Services[edit]

First/Last Train Timing[edit]

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
icon Bukit Panjang LRT
BP1 Choa Chu Kang 05:15 05:10 05:29 23:28
BP6 Bukit Panjang 23:48
BP1 Choa Chu Kang
   via BP7 Petir
05:00 20:08

Bus[edit]

Bus Stop Exit Bus Service
Blk 602 icon44641
Bt Panjang Ring Rd
A
920
922
972
972M
976
Blk 541A CP icon44649
Bt Panjang Ring Rd
A
920
922
972
972M
976

References[edit]

icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock C801C801AC801B
Depots Ten Mile Junction
Others Bukit Panjang LRT Bridging Service