Difference between revisions of "Changi Airport Extension"
Line 33: | Line 33: | ||
==Rail Lines in Singapore== | ==Rail Lines in Singapore== | ||
===MRT Lines=== | ===MRT Lines=== | ||
[[North South Line|<font color=red>North South Line</font>]]<br> | |||
[[East West Line|<font color=green>East West Line</font>]]<br> | |||
[[Changi Airport Extension|<font color=green>Changi Airport Extension</font>]]<br> | |||
[[North East Line|<font color=purple>North East Line</font>]]<br> | |||
[[Circle Line|<font color=orange>Circle Line</font>]] ''<small>(Opened/Opening/Under Construction)</small>''<br> | |||
[[Marina Bay Extension|<font color=orange>Marina Bay Extension</font>]] ''<small>(Under Construction)</small>''<br> | |||
[[Downtown Line|<font color=brown>Downtown Line</font>]] ''<small>(Under construction/Planning)</small>''<br> | |||
[[Thomson Line|<font color=black>Thomson Line</font>]] ''<small>(Planning)</small>''<br> | |||
[[Eastern Region Line|<font color=black>Eastern Region Line</font>]] ''<small>(Planning)</small>''<br> | |||
| | |||
| | |||
===LRT Lines=== | ===LRT Lines=== |
Revision as of 15:25, 4 March 2010
The Changi Airport Extension (part of East West Line) was the second Mass Rapid Transit (MRT) line in Singapore to be built. The line is currently 49.2 km long with 31 stations, and operated by SMRT Corporation. It takes about one hour to travel from end to end and this line is coloured green on MRT system maps.
As the name implies, the line connects central Singapore to both western and eastern parts of the island, with an additional branch to Changi Airport MRT Station from Tanah Merah MRT Station. Cross-platform transfer to the North South MRT Line is provided at Jurong East MRT Station, City Hall MRT Station and Raffles Place MRT Station stations while transfer to the North East MRT Line at Outram Park MRT Station is possible via a linkway.
History
Initial system
- 4 November 1989: City Hall MRT Station - Tanah Merah MRT Station (start of the separation of the North South MRT Line from the East West Line)
2nd phase of development
- 10 January 2001: Tanah Merah MRT Station - Expo MRT Station
- 8 February 2002: Expo MRT Station - Changi Airport MRT Station
Station
Alpha-Numeric Code |
Abbreviation | Station Name | Notes | ||
---|---|---|---|---|---|
English | Chinese | Tamil | |||
Changi Airport Line | |||||
EW4 | TNM | Tanah Merah | 丹那美拉 | தானா மேரா | Interchange station with EWL |
CG1 | XPO | Expo | 博览 | எக்ஸ்போ | |
CG2 | CGA | Changi Airport | 樟宜机场 | சாங்கி விமானநிலையம | Terminus (3) |
Rolling stock
Three batches of rolling stock are in service on the line, i.e. the Kawasaki Heavy Industries C151, the Siemens C651 and the Kawasaki Heavy Industries & Nippon Sharyo C751B. These trains operate from the two depots along the East West Line, the Ulu Pandan Depot near Jurong East MRT Station and the Changi Depot after Tanah Merah MRT Station.
Rail Lines in Singapore
MRT Lines
North South Line
East West Line
Changi Airport Extension
North East Line
Circle Line (Opened/Opening/Under Construction)
Marina Bay Extension (Under Construction)
Downtown Line (Under construction/Planning)
Thomson Line (Planning)
Eastern Region Line (Planning)
LRT Lines
BP | Bukit Panjang LRT |
武吉班让轻轨 | |
PG | Punggol LRT |
榜鹅轻轨 | |
SK | Sengkang LRT |
盛港轻轨 | |
LINE |