Tanah Merah station

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

1

Tanah Merah
丹那美拉
தானா மேரா
Tanah Merah-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 920 New Upper Changi Road
Singapore 467356
Line(s) East–West Line
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation TNM

Tanah Merah (EW4) is an elevated Mass Rapid Transit (MRT) station on the East–West Line.

The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension. The station may used the code

2

instead to specify the separation of the extension with the main line.

Similar to other stations on the eastern section of the East West Line, the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station.

History

Date Event
4 November 1989 Station officially opens
30 March 2011 Half-Height Platform Screen Doors in full operation

Tanah Merah Modification Project

An artist impression of the station with the additional platform

The Tanah Merah Modification Project (TMMP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards Changi Airport at a shorter intervals. Construction enhancements commenced in 2016 and is expected to be completed by 2024.[1]

Layout

L2 Platform A Template:RailRoute/1
Platform A/C
Platform C/D Template:RailRoute/1
Platform B/D
Platform B Template:RailRoute/1
L1 Concourse Faregates, Ticketing Machines, Passenger Service Centre
Street Level
B1 Underpass

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access New Upper Changi Road, APSN Katong School, Bedok View Secondary School
B Handicapped/disabled access New Upper Changi Road

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png East West Line

Template:MRTTime Template:MRTTime Template:MRTTime

Bus

Bus Stop Exit Bus Service
85099 Tanah Merah Stn Exit A
85091 Tanah Merah Stn Exit B

References

Template:East West Line